Use of Dynamic Traffic Assignment in FSUTMS in Support of Transportation Planning in Florida FDOT Research #BDK80 Task Work Order No. 977-12 June.

Slides:



Advertisements
Similar presentations
Transportation leadership you can trust. presented to 13 th Transportation Planning Applications Conference presented by Thomas Rossi May 10, 2011 Integration.
Advertisements

Interim Guidance on the Application of Travel and Land Use Forecasting in NEPA Statewide Travel Demand Modeling Committee October 14, 2010.
Breaking the Static Barrier: Building Regional Support for Implementation of Dynamic Traffic Assignment in Long-Range Planning Processes TRB Planning Applications.
Evaluation Tools to Support ITS Planning Process FDOT Research #BD presented to Model Advancement Committee presented by Mohammed Hadi, Ph.D., PE.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Operations Planning Organizing for Travel Time Reliability Ohio Planning Conference July 15, 2014.
1 Industrial Design of Experiments STAT 321 Winona State University.
Moving Research into Practice.  Implementation is the routine use of a SHRP 2 product by users in their regular way of doing business.  Users can include.
Transportation leadership you can trust. presented to Transportation Planning Applications Committee (ADB50) presented by Sarah Sun Federal Highway Administration.
Trip Generation Review and Recommendations 1 presented to MTF Model Advancement Committee presented by Ken Kaltenbach The Corradino Group November 9, 2009.
An Intelligent Transportation System Evaluation Tool in the FSUTMS Regional Demand Modeling Environment By Mohammed Hadi, Florida International University.
SHRP II R-11 Strategic Approaches at the Corridor and Network Levels to Minimize Disruptions From the Renewal Process A Web Presentation to the Technical.
Creating a Shared Vision Model. What is a Shared Vision Model? A “Shared Vision” model is a collective view of a water resources system developed by managers.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
Integration of Transportation System Analyses in Cube Wade L. White, AICP Citilabs Inc.
2006 FSUTMS/CUBE Voyager Model Conversion & Support Survey Model Task Force Meeting December 2006.
Current State of FSUTMS Practice Presented to Model Task Force November 9, 2009 Terry Corkery FDOT Systems Planning Office.
1 MODERNIZATION OF BELARUSIAN STATISTICS _________________________________________________ IMPLEMENTATION OF THE PROCESS APPROACH IN ORGANIZING THE STATISTICAL.
FDOT Transit Office Modeling Initiatives The Transit Office has undertaken a number of initiatives in collaboration with the Systems Planning Office and.
United Nations Economic Commission for Europe UNECE Transport Division 1 TRANS-EUROPEAN RAILWAY (TER) PROJECT 2 nd Expert Group Meeting (Budapest, 23 September.
Withlacoochee Regional Water Supply Authority Withlacoochee Master Regional Water Supply Planning and Implementation Program (WMRWSPIP) Technical Review.
FSUTMS Model Status and Standardization Florida Model Task Force Meeting Tampa, FL December 13, 2006 Developments and Future Directions.
International Speedway Boulevard Stakeholders Task Force (STF) Meeting 1 Wednesday, May 19, 2010.
Integrated Corridor Management Initiative ITS JPO Lead: Mike Freitas Technical Lead: John Harding, Office of Transportation Management.
1 Briefing on the Congestion Management Process (CMP) Andrew J. Meese, AICP Melanie Wellman COG/TPB Staff Travel Management Subcommittee November 27, 2007.
Incorporating Time of Day Modeling into FSUTMS – Phase II Time of Day (Peak Spreading) Model Presentation to FDOT SPO 23 March 2011 Heinrich McBean.
Status Update on Developing Guidance for Travel Demand Modeling Office of Transportation Data and Analysis August 11, 2009 Mark Flinner, Traffic Forecast.
Executive Order Environmental Stewardship and Transportation Infrastructure Project Reviews Priority Issues.
ERA Project Team Meeting Project Management Plan April 23, 2002.
Agenda  Purpose  Processes  Deliverables  Executing Activities 4.3.
Presented to Model Task Force Meeting presented by Danny Lamb, Florida DOT District 7 November 9, 2009 Model Task Force Priorities Survey.
MPOAC Florida Regional Councils Association
Software Project Configuration Management
Project Overview – Phase 1
System Planning To Programming
11 ii. Develop a plan for aDSM
APPLICATIONS OF STATEWIDE TRAVEL FORECASTING MODEL
NYMTC’s Land Use Model Land Use Model Workshop May 1, 2008
TechStambha PMP Certification Training
OptiFrame WP1: Project Management
Moving transportation into the future
Software Requirements
Transportation Systems Management and Operations (TSM&O)
TSMO Program Plan Development
Version 0.1Assessment Method Overview - 1 Process Assessment Method An objective model-independent method to assess the capability of an organization to.
The Two Most Common Types of Contemporary Planning Techniques
Model Information Exchange System - MIXS
Michael Mahut, Michael Florian and Nicolas Tremblay INRO
FHWA TSMO / SHRP2 Research
Regional Director, Eastern & Southern African Office, ICAO
Model Information Exchange System - MIXS
Document 3:12 (2011–2012) Published 5/31/2012
Fiscal Year Budget Plan
Developing a Plan for Identifying Local Needs and Resources
A Long Term Perspective on Transportation Models and Software
Design of Florida’s Turnpike’s State Integrated Land-Use Travel Demand Model Thomas Adler Resource Systems Group Youssef Dehghani Parsons Brinckerhoff,
Use of Dynamic Traffic Assignment in FSUTMS in Support of Transportation Planning in Florida MTF DTA SUBCOMMITTE MEETING July 28, 2011.
A STATE-WIDE ACTIVITY-BASED
Effective Project Management: Traditional, Agile, Extreme
Developing a Plan for Identifying Local Needs and Resources
The Two Most Common Types of Contemporary Planning Techniques
HR University Relations
Statewide Needs Assessment for Next-Generation Travel Demand Models
presented to MTF Transit Committee
Hazards Analysis & Risks Assessment
  Advanced Tools to Assess Managed Toll Lane Operations Model Task Force Toll Subcommittee Meeting September 16, 2010.
GSBPM AND ISO AS QUALITY MANAGEMENT SYSTEM TOOLS: AZERBAIJAN EXPERIENCE Yusif Yusifov, Deputy Chairman of the State Statistical Committee of the Republic.
Template for methodological application
Deciding the mixed-mode design WP1
Indiana Finance Authority (IFA)
Presentation transcript:

  Use of Dynamic Traffic Assignment in FSUTMS in Support of Transportation Planning in Florida FDOT Research #BDK80 Task Work Order No. 977-12 June 22 2010

Project Goal Implement a dynamic traffic assignment process within the FSUTMS environment

Background (1) MTF with input from the transportation planning community in Florida has identified the incorporation of DTA in the FSUTMS, as a high priority required improvement There are many issues that need to be addressed for the successful and optimal implementation of DTA in the FSUTMS Fright Corridor Management research project will provide valuable input to this project Interaction with the ITS Operation Tool Project

Background (2) DTA technical sub-committee of the MTF model task force Coordination with SHRP2 projects

Project Objectives Review existing DTA capabilities Identify the requirements of Florida demand modeling Identify the ability of DTA tools to meet requirements Identify the data requirements and sources Identify and conduct needed modifications Integrate DTA capabilities within the FSUTMS Develop tools to support use Document the project effort, results, and conclusion

Task 1 DTA Review Review of DTA literature DTA approaches Traffic flow models Modeling capabilities and features Previous applications O-D matrix estimation Data needs Calibration approaches Integration with other environments

Task 2: Requirements Identification Potential for early survey Workshop: In coordination with the DTA sub- committee of the MTF model advancement committee. Review the results from Task 1 Determine the requirements for DTA modeling as part of the travel demand forecasting process in Florida

Task 3: Assessment of Existing Tools Assessment of existing tools and models Ensure that the tools meet the requirements of using DTA as part of Florida demand forecasting modeling processes Assess if the tool performs as expected Bugs, limitation, constraints, unexpected/illogical results, run time, integration problems, technical support

Task 4: Enhancement of Tools Perform the enhancements needed to existing DTA tools to satisfy the Florida modeling requirements Integrate DTA capabilities within the FSUTMS Not all identified required enhancements may be possible Reasons why any requirements are not addressed in this project will be documented

Task 5: DTA Support Tools and data to support use and calibration of DTA Conventional and ITS data will be integrated according to requirement. O-D estimation process DTA and traffic flow model parameter calibration Post processing of data Advanced technology modeling

Potential Process

Task 6: Testing  This task will include the testing of the developed DTA environment and tools within the FSUTMS The research team will select a regional FSUTMS demand model in Florida for the testing of the developments. The test will include all components of the developed DTA modeling process including data collection, data processing, trip matrix estimation, model input generation, model execution, calibration support, and output post processing

Task 7: Workshop and Documentation  Final report Training workshop

Project Researchers Mohammed Hadi Citilabs Halit Ozen Yan Xiao Wei Zhao Shaghayegh Shabanian