A Water Balance guidance, what for? Further reflections

Slides:



Advertisements
Similar presentations
Module 3: Environmental Objectives, Programme of Measures, Economic Analysis, Exemptions Environmental Objectives Yannick Pochon Afyon, 2015.
Advertisements

Water.europa.eu Indepth assessment economic analysis progress report SCG meeting May 2008 Maria Brättemark, Unit D.2, DG Environment, European Commission.
Water scarcity drafting group Salzburg, June Dicembre 2004Brussels, 11 April 2006 Water Scarcity Drafting Group WD meeting Salzburg June 1st and.
THE MANAGEMENT PLAN IN PRACTICE Case study. RBMP Detailed publication process in the directive...  art. 13: general rules  annex VII: detailed contents.
Water.europa.eu Preparation of the Commission’s 2011 proposal on Priority Substances Strategic Co-ordination Group meeting May 2011 Jorge Rodriguez.
UNDP Guidance for National Communication Project Proposals UNFCCC Workshop on the Preparation of National Communications from non-Annex I Parties Manila,
EU Update/CIS England WFD Stakeholder Forum 4 April 2008.
Integration of sustainable development approach
IPSP Outcomes Reporting Framework
The French National Agency on Water and Aquatic Environments
TECHNOLOGY NEEDS ASSESSMENT: EXPERIENCES FROM THAILAND
Principles and Key Issues
Indepth assessment economic analysis progress report SCG meeting May 2008 Maria Brättemark, Unit D.2, DG Environment, European Commission.
Diffuse Sources of Water Pollution
Proposal for reporting on Programmes of Measures in 2016
Assessment of 1st FRMPs and 2nd RBMPs
CIS guidance document on E-Flows
Marine Strategy Framework Directive (MSFD)
Working groups The objectives of the working group are to provide hands-on guidance on the compilation of the accounts In particular how to adapt the SEEAW.
GEP vs. GES.
Guidance on application of Article 4.7
WG C – Groundwater Activity WGC-3 Integrated Risk Assessment and Management Wouter GEVAERTS Thomas TRACK Dietmar MÜLLER.
CIS-Workshop on River Basin Management Plans
WG ESA meeting 9th of March 2015
The Commission Communication on implementation (COM (2012) 95) in relation to Water Industry Directives (Urban Waste Water Treatment, Drinking Water,
Proposal for MSFD risk-based approach project in OSPAR region
SPI activities update 22nd WORKING GROUP C PLENARY MEETING
DIRECTORATE GENERAL FOR INTERNAL POLICIES
River Basin Management Plans
CIS guidance document on Eflows
Preliminary methodology for the assessment of Member States’ reporting on Programme of Measures (Article 16) WG DIKE Sarine Barsoumian (12/10/2015, Brussels)
Activity on WFD and agriculture
22nd WG D Meeting, 15/4/2012 Jacques Delsalle, European Commission
Natural water Retention Measures
Diffuse Sources of Water Pollution
Cluster Knowledge Integration and Dissemination
WFD, Common Implementation Strategy  Water Scarcity and Droughts Expert Group Madrid, February 17, 2010.
Assessment of the Implementation of the Programmes of Measures
Agenda Item 10: Feedback on dangerous substances workshop and Implementation Guidance WG-E(1)-07/04/INERIS - Implementation guidance.
Feedback from Article 5 workshop
DG Environment, Unit D.2 Marine Environment and Water Industry
Working group Ecological Flows
DG Environment, Unit D.2 Marine Environment and Water Industry
Session 2: Implementation experience - Art. 9
ECONOMICS IN THE WFD PROCESS
Pilot River Basin Water Framework Directive.
Towards a Work Programme for the Common Implementation Strategy for the Water Framework Directive (2000/60/EC) Water Directors Meeting 28 November.
Economic Analysis for MSFD: the ESA guidance review.
Session 1: The report on CIS-members´ views on the experience in the implementation of the economic aspects of the WFD.
Preparation of the Commission’s 2011 proposal on Priority Substances
Exemptions and Disproportionate Costs
Update WG Eflows activity and link with EcoStat
THE WATER FRAMEWORK DIRECTIVE (WFD)
Compliance checking of RBMP An inventory of questions
DROUGHT MANAGEMENT PLAN REPORT Including Agricultural, Drought Indicators and Climate Change Aspects SCG meeting, Brussels 7 November 2007 Water Scarcity.
Progress on the elaboration of CIS guidance document on E-Flows
WGC-2 Status Compliance and Trends
DG Environment, Unit D.2 Marine Environment and Water Industry
Concept paper on the assessment of WFD River Basin Management Plans
Brussels, 4 April, 2014 – WG Water Accounts
Water Scarcity Drafting Group WD meeting Salzburg June 1st and 2nd of 2006 Leaders: Italy & France Pascal Berteaud France 1 Dicembre 2004 Brussels,
River Basin Management Plans
DG Environment, Unit D.2 Marine Environment and Water Industry
Research on Climate Change on Water, including Natural Hazards Contribution to SSG discussions and science-policy interfacing Philippe QUEVAUVILLER European.
Results of the screening of the draft second RBMPs
Article 14 – first considerations
Water Director's Meeting May 2013, Dublin DG Environment
Assessment of Member States‘ 2nd River Basin Management Plans
Item 11 - point 2 WFD & agriculture: compulsory vs. voluntary measures
AAdopted Rural Development Programmes – implications for second RBMPs
Presentation transcript:

A Water Balance guidance, what for? Further reflections Quantitative aspects must be addressed in WFD implementation to achieve environmental objectives (GES x SW/GQS x GW/no deterioration). WB are key tools for MS where quantitative management is at stake or may be in the future if preventive action is not taken. WB are to be developed when carrying out art.5 analysis. WB outcome should inform on significance of water abstractions for environmental objectives and gap to be closed with measures. For WB MS need to rely on critical information required under the WFD: inventory of abstractions and hydrological monitoring. Data collection should be framed for easy inclusion in WBs.

WB should be built in a stepwise/tiered approach; a preliminary analysis to inform on WB focus, to be further elaborated in time/spatial scale, uses to be included, etc... to the level of detailed required for the purpose  E-flows should be explicitly considered when building water balances. WB should be used to test effectiveness of the measures to be included in PoMs, in particular the need to review of existing permits, water efficiency measures, development of reuse, etc. WB are critical to enable comparison of the different options when applying for an exemption under art 4(7) justified by quantitative needs (dams, water transfers…). WB can provide useful information for climate-proofing of the measures. WB can be used as basis for emergency plans in case of water shortages and conflicting water uses