MEIC Shifting Magnet Tim Michalski August 6, 2015.

Slides:



Advertisements
Similar presentations
Study of the Luminosity of LHeC, a Lepton Proton Collider in the LHC Tunnel CERN June F. Willeke, DESY.
Advertisements

11 October 2006Basic Layout of LER G. de Rijk1 Basic Layout of LER  The basic idea  VLHC type magnets  LER in the LHC tunnel  Layout  LER experiment.
Luminosity Prospects of LHeC, a Lepton Proton Collider in the LHC Tunnel DESY Colloquium May F. Willeke, DESY.
Crab Cavities in IR1 and IR5 Some considerations on tunnel integration What will be the situation in the tunnel after the LHC IR Phase-1 Upgrade. What.
1 Presented at ColUSM by D. Ramos on behalf of the Cold Collimator Feasibility Study Working Group Longitudinal.
ERHIC: an Efficient Multi-Pass ERL based on FFAG Return Arcs June 9, 2015Stephen Brooks, ERL On behalf of the eRHIC design team.
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
1 Tim Michalski October 6, 2015 Engineering Issues in MEIC.
Low Energy RHIC e - Cooling Meeting Minutes – 11/19/14 1. Cooling Section Magnets and Power Supplies –Most of power supplies will be from ERL (R. Lambiase).
Design of the Turnaround Loops for the Drive Beam Decelerators R. Apsimon, J. Esberg CERN, Switzerland.
Low Energy RHIC e - Cooling 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
Synchronization Issues in MEIC Andrew Hutton, Slava Derbenev and Yuhong Zhang MEIC Ion Complex Design Mini-Workshop Jan. 27 & 28, 2011.
Vacuum, Surfaces & Coatings Group Technology Department 22 nd January 2015 C. Garion2 Beam Line Interconnection: snapshot of present design principles.
Status of MEIC Beam Synchronization V.S. Morozov on behalf of MEIC study group (summary of the results of a series of special MEIC R&D meetings) MEIC Collaboration.
Interaction Region Design and Detector Integration V.S. Morozov for EIC Study Group at JLAB 2 nd Mini-Workshop on MEIC Interaction Region Design JLab,
Engineering for the JLEIC pre-CDR Tim Michalski JLEIC Spring Collaboration Meeting March 31, 2016.
HF2014 Workshop, Beijing, China 9-12 October 2014 Challenges and Status of the FCC-ee lattice design Bastian Haerer Challenges.
JLEIC MDI Update Michael Sullivan Apr 4, 2017.
Large Booster and Collider Ring
Non-linear Beam Dynamics Studies for JLEIC Electron Collider Ring
First Look at Nonlinear Dynamics in the Electron Collider Ring
Potential Use of PEP-II Magnets by Project X
Electron Ring Optics Design
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
The first shipment of SPEAR3 magnets (9 dipoles and 12 quadrupoles) arrived April 3. The second shipment (3 dipoles, 7 quadrupoles, and 6 sextupoles)
Progress of SPPC lattice design
LHC (SSC) Byung Yunn CASA.
Collider Ring Optics & Related Issues
Negative Momentum Compaction lattice options for PS2
Yuri Nosochkov Yunhai Cai, Fanglei Lin, Vasiliy Morozov
RHIC Magnets for JLEIC Yuhong Zhang May 11, 2018.
Electron Collider Ring Magnets Preliminary Summary
Vertical Dogleg Options for the Ion Collider Ring
JLEIC Collider Rings’ Geometry Options
JLEIC Engineering Status
IR Beam Transport Status
Progress on Non-linear Beam Dynamic Study
Feasibility of Reusing PEP-II Hardware for MEIC Electron Ring
Path Length Chicane Options
Fanglei Lin, Andrew Hutton, Vasiliy S. Morozov, Yuhong Zhang
MEIC New Baseline: Luminosity Performance and Upgrade Path
Feasibility of Recuperation of Magnets in Decommissioned Storage Rings
Main Design Parameters RHIC Magnets for MEIC Ion Collider Ring
IR Magnet Design and Engineering Considerations
The Feasibility of Using RHIC Magnets for MEIC and Cost Impact
The MEIC electron ring as the large ion booster
Ion Collider Ring Using Superferric Magnets
Fanglei Lin, Yuhong Zhang JLEIC R&D Meeting, March 10, 2016
JLEIC Magnet R&D Tim Michalski NP Community Panel Review of the EIC
Fanglei Lin, Yuri Nosochkov Vasiliy Morozov, Yuhong Zhang, Guohui Wei
Update on JLEIC Electron Ring Design
Conventional Synchronization Schemes
Fanglei Lin MEIC R&D Meeting, JLab, July 16, 2015
JLEIC Collider Rings’ Geometry Options (II)
Progress Update on the Electron Polarization Study in the JLEIC
MEIC New Baseline: Performance and Accelerator R&D
MEIC Alternative Design Part V
Possibility of MEIC Arc Cell Using PEP-II Dipole
More on MEIC Beam Synchronization
JLEIC Electron Ring Nonlinear Dynamics Work Plan
Arc FODO Cell Inventory
Fanglei Lin JLEIC R&D Meeting, August 4, 2016
MEIC R&D Meeting, JLab, August 20, 2014
MEIC Alternative Design Part III
New Chicane Option Total bending angle and start and end points fixed
MEIC beam path change with e-ring bypass lines
Ion Path Length Compensation with Chicane
A TME-like Lattice for DA Studies
Beam Synchronization in MEIC: The Problem, Scale and Prospect
Illustrations of Beam Synchronization Issue
Presentation transcript:

MEIC Shifting Magnet Tim Michalski August 6, 2015

Maximum change in magnet spacing Arc Chicane Using current 22.8 m FODO cell design (8 m 3 T dipoles with 3.4 m separation) One chicane per arc (also helps with synchronization of the 2nd IP), one extra FODO cell per arc Takes up cells, which could otherwise be used for chromaticity compensation x = 52 cm x = -69 cm Total bending angle and z length are fixed # of FODO cells # of magnet moved Path length change Radial movement range Maximum change in magnet spacing 3 4 dipoles, 5 quads 10 cm +52 / -69 cm 20 mm 4 6 dipoles, 7 quads +36 / -39 cm 14 mm 5 8 dipoles, 9 quads +28 / -29 cm 11 mm 2

Concept Layout of Superferric Arc Half Cell Magnets

Magnet Interconnect From LHC (Superferric Magnets Will Be Similar)

Considerations for Repositioning Superferric Magnets Moving radially inward and outward is feasible Use slides and measurement scheme to make repeatable Rotation of magnets will be required as well Considerations for interfaces between magnets and to outside world Beamline Vacuum – bellows between adjacent beam pipe vacuum chambers Insulating Vacuum – bellows between adjacent Arc Half-Cells (?) Power – “service loop” for conductors Cryogens – may require flex hoses between adjacent Arc Half-Cells and assessment of U-Tubes

Considerations for Repositioning PEP-II Magnets Moving radially inward and outward is feasible Use slides and measurement scheme to make repeatable Rotation of magnets will be required as well – if doing a short string Considerations for interfaces between magnets and to outside world – no major issues Vacuum – assess capacity to expand/contract RF shielded bellows between rafts Potential to use different bellows for different energies Current design architecture has the Electron Collider Ring suspended above the Ion Collider Ring

Considerations for Repositioning PEP-II Magnets Length of Bellows is .125m or 4.92” Location of Bellows With a single bellows in a Arc Half-Cell, Raft and Dipole must be moved as a pair. Without Corrector With Corrector

SuperKEK B and PEP-II HER Shielded Bellows PEP-II HER Bellows

Potential Positioning Systems