Progress in the realization of the PRIMA Neutral Beam Test Facility FIP2/4-Rc SPIDER MITICA The ITER Heating Neutral Beam requirements (1MeV, 16.7MW,

Slides:



Advertisements
Similar presentations
1 R. Panek, O. Mikus COMPASS – new fusion facility in a new EU country Radomir Panek Institute of Plasma Physics ASCR, v.v.i Za Slovankou 3, Prague Czech.
Advertisements

An Image Filtering Technique for SPIDER Visible Tomography N. Fonnesu M. Agostini, M. Brombin, R.Pasqualotto, G.Serianni 3rd PhD Event- York- 24th-26th.
Fusion Power Associates Meeting, 5 December 2012 Slide 1/16 ITER Achieve 500 MW of fusion power. Demonstrate the scientific and technological feasibility.
What is the W-SPES Project? Carlo Pentimalli (Prato, Italy)
30 MW Webberville Solar Plan Update Hosted By: Gemini Solar – John Street Village of Webberville – Hector Gonzales, Mayor Austin Energy – Ed Clark October.
Final Design of a CW Radio-Frequency Quadrupole (RFQ) for the Project X Injector Experiment (PXIE)* Abstract: The Project X Injector Experiment (PXIE)
 over 20 years of experience on the specialized market of relocation of the industrial facilities;  realization of the projects in many countries.
F. GnesottoFrascati, 19 gennaio 2007 Giornata di presentazione del Progetto ITER all’Industria italiana Ruolo dell’Associazione Euratom-ENEA Prof. F. Gnesotto,
1/13 T. Inoue NEUTRAL BEAM INJECTION R&D on Ion Sources and Accelerators FT/1-2Ra: 1 MeV accelerator and uniformity R&D on a High Energy Accelerator and.
17 th IAEA TM on Research Using Small Fusion Devices, Lisbon B. Schunke 1 B. Schunke D. Bora, J.-J. Cordier, R. Hemsworth, A. Tanga V. Antoni & RFX Team.
Coal-fired electricity generation 1.Accounts for 39% of world electricity production – the most important source of electricity in OECD and non-OECD. 2.Accounts.
A Review of the 7 th International Tooling Conference PRESENTED BY: Century Sun Metal Treating, Inc. Mark Baleja, Lab Manager.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review The Development of Open, Water-Lubricated Polycrystalline Diamond Thrust Bearings.
Development and validation of numerical models for the optimization of magnetic field configurations in fusion devices Nicolò Marconato Consorzio RFX,
Broader Approach Activities toward Fusion DEMO Reactors IT/E-2 IAEA 21 st Fusion Energy Conference (Chengdu 17 th October, 2006 ) Shinzaburo Matsuda Japan.
International collaboration in high energy physics experiments  All large high energy physics experiments today are strongly international.  A necessary.
Norbert Holtkamp, October Status of the ITER Project Norbert Holtkamp Status of the ITER Project Norbert Holtkamp Principal Deputy Director General.
Ursel Fantz for the IPP-NNBI Team 16 th ICIS, New York City, USAAugust 23-28, 2015 Towards 20 A Negative Hydrogen Ion Beams for Up to 1 hour: Achievements.
ILO Meeting #26 Ongoing and forthcoming Procurement activities 29 th September San Sebastian F4E Market Intelligence group - ILO Meeting #26 – 29th.
American Neutrino Strategy: Consequences of P5 Report Jim Strait, LBNE Project Director NuFact August 2014.
1 ITPA St Petersburg April 2009G.Gorini JET results on the determination of thermal/non-thermal fusion yield from neutron emission spectroscopy.
1 1 by Dr. John Parmentola Senior Vice President Energy and Advanced Concepts Presented at the American Security Project Fusion Event June 5, 2012 The.
INFN – SEZIONE DI MILANO-BICOCCA People 1 Section Director: Dr. D. Pedrini Group Leader: Prof G. Gorini Associated researchers/Post-docs/PhD Students Prof.
 over 20 years of experience on the specialized market of relocation of the industrial facilities;  realization of the projects in many countries.
Norbert Holtkamp, October The Engineering Challenges of ITER The Engineering Challenges of ITER Norbert Holtkamp PDDG Nominee October 16th, 2006.
FFAG F ixed F ield A lternating G radient Synchrotrons A new type of particle accelerator - with a wide variety of applications Cancer Therapy and UK Activities.
CLIC TDR Task Force CLIC Zero, cost & schedule considerations R. Corsini.
HWDB: Operations at the Spallation Neutron Source Workshop on Accelerator Operations August 6-10, 2012 Glen D. Johns Accelerator Operations Manager.
Status of KEK 150MeV FFAG M. Aiba (KEK) For KEK FFAG Gr. FFAG’05, 5 to 9 Dec., KURRI.
IAEA International Atomic Energy Agency Second IAEA Technical Meeting on "Theory of Plasmas Instabilities - Transport, Stability and their interaction"
1 Status of the T2K long baseline neutrino oscillation experiment Atsuko K. Ichikawa (Kyoto univeristy) For the T2K Collaboration.
Geothermal Energy System Progress Update. Will cut annual energy use by 50% Will reduce carbon dioxide emissions by 25,000 tons per year Will cut water.
The International Workshop on Thin Films. Padova 9-12 Oct of slides Present Status of the World- wide Fusion Programme and possible applications.
г. 1 г.Санк-Петербург Research and Practical Conference "Accelerators and Radiation Technologies for the future of Russia". HIGH POWER ELV.
Acceleration of 1 MeV H - ion beams at ITER NB relevant high current density Takashi INOUE M. Taniguchi, M. Kashiwagi, N. Umeda, H. Tobari, M. Dairaku,
/ 14 (FIP/2-5Ra) Development of DC ultra-high voltage insulation technology for ITER NBI H. Tobari et al., (JAEA) (FIP/2-5Rb) Progress in long pulse production.
MAC meeting (12-13 January 2010) Machine Advisory Committee participants: B.Sharkov (ITEP/FAIR) P.Belochitskii (CERN) S.Ivanov (IHEP, Protvino) M.Steck.
Fermilab-India Agreements and Collaboration Shekhar Mishra Project-X, International Collaboration Coodinator Fermi National Accelerator Laboratory Batavia,
Asia-Europe Physics Summit – Tsukuba, March 26th 2010 Large International Research Facilities The Asia-Europe cooperation Michel Spiro (CNRS) President.
Roman Pöschl LAL Orsay Testbeam plans 2012/13 CALICE Collaboration Meeting Heidelberg September 2011.
ESS Innovation Procurement Workshop
Wind Power Norway had a goal of 3000 GWh annual wind energy production within Government investment support - 1 Euro- cent per kWh wind energy. National.
12-luchetta-RFX-3-O Integrating Supervision, Control and Data Acquisition – The Neutral Beam Test Facility Experience A. Luchetta, G. Manduchi, C.Taliercio.
KAI ZHANG Nuclear Fusion Power KAI ZHANG Oct
Input to Strategy currently planned
Status of AMS at iThemba LABS Gauteng
LIPAc Control System Reliability improvements
G.Manduchi1, T.Fredian2⁾, J.Stillerman2⁾, A. Neto3), F. Sartori3)
Ways to industry participation in CLIC 24th October, 2017
Emanuele (ESS), Alessandro (CERN), Mikel (Tekniker), Hayley (ISIS)
Langmuir probe characterization of the NIO1 ion source plasma
ITER & Expectations for Fusion Research in the Next Quarter Century
Chapter 15 B: COMBINED HEAT AND POWER SYSTEMS
A sample is injected into the spectrometer and heated to a vapour.
Escalators.
Industry and Urbanization
Worldwide Nuclear Testing
HIE-ISOLDE contribution packages

Fusion for Energy & ITER Contribution to EU Added Value
1 Point! 2 Points! 3 Points! 4 Points! 5 Points!!
Ceramic to metal connection.
COUNTRIES NATIONALITIES CONTINENTS.
Summary Slide (OV/1-1) PROGRESS OF ITER-INDIA ACTIVITIES FOR ITER DELIVERABLES-Challenges and mitigation measures What are the major developments? A functional.
Dr Daniel Buhagiar Founding Partner
Comparison: Ginna 480 MW Installed PV Power as of the end of 2005
New Jersey Offshore Wind
Progress in the ITER Neutral Beam Test Facility
General Issues for a Multi-MW driver
Beam Ion Performance and Power Loads in the ITER Pre-Fusion Power Operating Scenarios (PFPO) with Reduced Field and Current We have used ASCOT to simulate.
Presentation transcript:

Progress in the realization of the PRIMA Neutral Beam Test Facility FIP2/4-Rc SPIDER MITICA The ITER Heating Neutral Beam requirements (1MeV, 16.7MW, 1hour operation) have never been achieved simultaneously  A full scale Neutral Beam Test Facility is needed The PRIMA Neutral Beam Test Facility is under construction at Consorzio RFX, Padova, Italy. It will hosts two experiments: MITICA a full scale prototype of the Heating Neutral Beam of ITER SPIDER a ITER HNB full-size negative ion source (D2 290 A/m2 , D- > e ; H2 350 A/m2 , H- >2e) This realization is funded in kind by the Europe, Italy (host country), Japan and India Realization is well in progress: SPIDER is under installation. First experiment is scheduled in spring 2016 MITICA Design of components almost completed. First experiments at low beam energy will start in 2018; full power experiments are scheduled in 2019