Final Version (after MS revision)

Slides:



Advertisements
Similar presentations
EIONET ANNUAL WORKSHOP Session 1 Streamlining the data – Towards a shared Water Information System for Europe Water Framework Directive Reporting Sheets.
Advertisements

OGC TC WISE perspective towards standards and interoperability OGC meeting, Athens, 31 March 2009 Stefan Jensen.
The Waterfall Model A Case Study
Conclusions Beate Werner, Ursula Schmedtje, Fernanda Nery EEA Session 5 Eionet NRC Freshwater meeting, June 2015.
Second Annual Japan CDISC Group (JCG) Meeting 28 January 2004 Julie Evans Director, Technical Services.
ETMS Documentation Roger Milego Stockholm, Project meeting 8-9 October 2013.
COUNTER XML Examples File Management Log in kavi via:
PFRA reporting – Output from test phase FD Drafting Group, Meeting 16 February 2011 Mette Wolstrup.
23. October 2014 WG DIS, Brx WFD 2016 Tools Andres Stæhr Bastholm.
1 12/11/2015 WFD2016 Reporting Workshop under the Common Implementation Strategy of the Water Framework Directive (WFD) - Reporting National Spatial Data.
European Topic Centre on Biological Diversity EIONET NRC Meeting on Biodiversity October 2011, Copenhagen Progress.
Ceiling Fan Testing Facility Guidance Manual Rebecca Miller ICF Consulting E NERGY S TAR ® for Ceiling Fans
WISE Working Group D DG Env Brussels Jon Maidens, Atkins Danmark a/s.
1 WISE SoE data reporting: cycle of business processes 2013 Marine Eionet Workshop 24/25 September 2013, Copenhagen Marek Staron Data operator SES2, EEA.
1 12/11/2015 WFD2016 Reporting Workshop under the Common Implementation Strategy of the Water Framework Directive (WFD) - Introduction to Reporting Guidance.
1 Integration of the LCP Reporting Into the E-PRTR Current status and Technical proposal August 4th.
IN THIS Slide show YOU WILL LEARN ABOUT ALL VERSIONS OF "MS OFFICE"
CDDA 2018 new reporting re-using INSPIRE services
NG911 GIS User Group 2017 Q2 Webinar May 18, :00 – 3:00pm
Intercalibration excersice progress report Presented by Palle Haastrup Joint Research Centre Institute for Environment and Sustainability Inland.
For info only! Expected date of reporting of RBMP as reported informally by SCG Legal deadline 22/03/ MS by deadline 1 MS partly by deadline (BE)
Agenda item 8b WISE SoE reporting 2015 state of the play
Progress Report TF Sequence Listing in XML
Marine Environment and Water Industry Unit
Marine Environment and Water Industry Unit
Outcomes of the test phase
Reporting Guidance Consistency Check
Sweden Conclusions of the test phase for the WFD reporting guidance, schemas and reporting tools Niklas Holmgren Måns Denward Katarina Vartia.
API 16RCD June 2017 Specification for Rotating Control Devices – Update.
HMA Follow On Activities
Taking forward the common understanding of Art. 8, 9 and 10 MSFD
Meeting of Working Group Data & Information Sharing (DIS)
Review plan of the nature reporting – update 7
S-127 – Marine Traffic Management Release Candidate NIPWG 6 30 January 2019 Raphael Malyankar Eivind Mong Sponsored by IHO.
Progress report Working Group D - Reporting SCG meeting 5-6 November 2008 Unit D.2 Water and the Marine - WFD.
Arrangements – next steps 1:
Harmonisation Activity Progress report
Questionnaire on progress in preparing reports under Nature Directives
Summary and Action Points
Article 13 RBMP reporting testing 2009
Follow up workshop 14 January on streamlining
Timetable Phase Date Collect feedback from MS on options 1, 2 and 3 presented by the EC (reporting 1b WFD-related measures for MSFD). 21 February Separate.
Flood hazard maps and Flood risk maps (Guidance and Schema)
9th meeting of the Floods Working Group
Guidelines for the implementation of Regulation (EC) No 91/2003 of the European Parliament and of the Council on Rail transport statistics version 6.0.
Update on the status of RBMP reporting
Meeting of Water Directors 2/3 December 2004
Debate on Climate Change and Water Water Directors’ meeting Slovenia June 2008 Marieke van Nood, Unit D.2, DG Environment, European Commission.
Water Directors’ Meeting Working Group D (Reporting) activities
Eddy Porosnicu EUROCONTROL
Revision of EG CTI October 2013
Review plan of the nature reporting – update 6
Working Group D Reporting
WG E on Priority Substances
Action points Who When WG GES 31 March March 2017
water-related spatial datasets and services
PFRA reporting – Output from 2. test phase
Session 4: Finalize Project Working Arrangements
Eddy Porosnicu EUROCONTROL
Working Group on Data, Information and Knowledge Exchange (WG DIKE)
ARTICLE 17 REPORTING 23 MS delivered by end 2007 latest delivery early March 2008 latest second delivery early April 2008.
Brussels, 4 April, 2014 – WG Water Accounts
WG A Ecological Status Progress report April-October 2010
Reporting template for milestone reports
EU Water Framework Directive
Harmonisation Activity Progress report
Marine Environment and Water Industry
CDDA alignment with INSPIRE
Nuclear Safety Standards Committee 35th Meeting 24 – 28 June 2013
Marine Environment and Water Industry Unit
Presentation transcript:

Final Version (after MS revision) Planning of the test phase ID Product / Tool Draft version Deadline for comments Final Version (after MS revision) 1 UML v 5.0 {Including Annex0 structure} XML Schemas 5.0 Access Database 5.0 template GML Schemas 5.0 Shapefiles templates 20/05/15 12/06/15 26/06/15 2 Access to XML transformation tool (adaptation to v 5.0 {Including Annex0 structure}) Shape to GML transformation tool (adaptation to v 5.0) 01/06/15 19/06/15 3 QA/QC testing area for section 2 – within schema checks 15/06/15 End of August End of October (operational release) 4 QA/QC testing area for section 3 – cross schema checks QA/QC testing area for section 4 – statistics 5 QA/QC testing area for section 5 – Annex 0 structure check 03/07/15 6 WFD Reporting guidance 2016 v. 5.0 -- End of June 7 QA/QC specifications document 8 GIS reporting guidance 2016 1