ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #10

Slides:



Advertisements
Similar presentations
Torch electronics test environment MCP readout update.
Advertisements

1S. Virostek - LBNL Spectrometer Solenoid Fabrication Update S. Virostek and M. Green are visiting vendor today for progress update Vendor expects to complete.
Gigabit Ethernet PMD Opto-Link, Inc. – Status Report 9 Vinh Nguyen April 14, 2005.
Project GabE ECE 135 – Spring 2005 Omar Al-Jadda Patrick Crosby Rahmin Sarabi Adam Durity.
GIGABIT ETHERNET DESIGN ECE Spring 2004 Group 1 Presentation 5 – Yashar Pirzadeh.
Project GabE ECE 135 – Spring 2005 Final Presentation Omar Al-Jadda Patrick Crosby Adam Durity Rahmin Sarabi.
ECE 135. Opto-Electronics Design Project Spring 2006.
Presenter: Curtis Grens. 2 This Week’s Highlights The optical link budget completed and reviewed Financial budget in place Initial VCSELs and PDs ordered.
Project Checklist ◦ SyRs – Completed ◦ SDS – In progress ◦ Project-  GUI Cleanup – In progress  Hardware Replacement - Completed  Actual Testing – In.
Optical Gigabit Ethernet Group F.O.R.E. Final Presentation Chris Abbott, Ronen Adato, David Larado 4/21/2005.
Group 2 - Project Update April 1, 2004 Tyler Helble.
Presenter: Nassisa-Geda Techane. 2 Highlights of the Last Two Weeks Midterm paper done! More tests to be performed on the board –Awaiting calibrated optical.
Gigabit Ethernet PMD ECE135 Group 2 – Presentation 4 Clifton Kerr February 17, 2005.
ECE 4006B Fall, 2002, Group 3, Man Le Progress Report Period (November 15-21, 2002) Finished alignment tolerance testing with Rx board (S7911 and PDT-
Presenter: Curtis Grens April 3, Highlights of the Last Week Connectorized PD on current board replaced with unconnectorized PD Second board constructed,
ECE 4006B Fall, 2002, Group 1, Mei Chan Progress Report Period (November 22-December 5, 2002) Receive and complete assemble 2 nd PCB board Complete the.
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #12  PROGRESS  Connectorized RX, Connectorized TX, & TX/RX Combo tested using 100m cable  Unconnectorized.
ECE 4006B Fall, 2002, Group 3, Shahriar Khushrushahi Progress Report Period (September 5 – September 12, 2002) Cleared loose ends with respect to PDs and.
Task List  Group management plan  Background studies  Link budget: optical/electrical  Build, test learning Rx board  Order components for transceiver.
Gigabit Ethernet EE 164 Group 2 – Presentation 3 Ungtae Lee February 19 th /13.
Gigabit Ethernet PMD Opto-Link Inc. – Presentation 5 Vinh Nguyen February 24, 2005.
Gigabit Ethernet TxRx ECE Group 2 – Presentation 4 Andrew Tupper February 26, 2004.
Gigabit Ethernet PMD Opto-Link, Inc. – Status Report 7 Andrew Meyerson March 24, 2005.
Gigabit Ethernet PMD Opto-Link Inc. – Presentation 6 Bryan Justice March 10, 2005.
Optical Gigabit Ethernet Group 4 February 3, 2005 Ronen Adato.
Project GabE ECE 135 – Spring 2005 Patrick Crosby Adam Durity Rahmin Sarabi Omar Al-Jadda.
Contact Us.
Subsystem Build & Test Review
ECE Group 2 – Presentation 8
Opto-Link, Inc. – Status Report 8 Clif Kerr March 31, 2005
ECE 135 – BtrLaytDanNvr Presentation 7
Optical Gigabit Ethernet
How To Add A Xerox Printer To Google Chrome
ECE4006 Group 6 – Presentation 5
ECE4006 Group 6 – Presentation 9
Jinesh Karia Rakesh Soni James Cummings Elisa Hurwitz Bishan Patel
ECE 101 Innovative Education-- snaptutorial.com
Gigabit Ethernet Design ECE 4006C – Spring 2003
ECE 4006 Group6 – Presentation 6
Gigabit Ethernet Design ECE 4006C – Spring 2003
Capstone Design Update
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #11
Melanie Garrick Barry Mullins Nihar Patel Jason Young
Allen Duncan Curtis Grens Kenny Haulk Chris Lambrecht Nassisa-Geda Techane April 24, 2003.
Presenter: Chris Lambrecht
GIGABIT ETHERNET DESIGN ECE Spring 2004 Group 1
Presenter: Allen Duncan
Gigabit Ethernet Design ECE 4006C – Spring 2003
Gigabit Ethernet Design ECE 4006C – Spring 2003
GIGABIT ETHERNET DESIGN ECE Spring 2004 Group 1
Gigabit Ethernet Design ECE 4006C – Spring 2003
Gigabit Ethernet Design ECE 4006C – Spring 2003
Optical Gigabit Ethernet
Group 5 – ECE 4006: Week 12 Melanie Garrick 1/2/2019.
ECE 4006 Group 6 – Presentation 8
Project GabE ECE 135 – Spring 2005
Capstone Design Update
ВОМР Подмярка 19.2 Възможности за финансиране
Споразумение за партньорство
Optical Gigabit Ethernet
PLANNED WORK for week #10 (week of Oct. 28 – Nov. 3) PROGRESS
Progress Report (October 2 - 9, 2002)
Group 5 – ECE 4006: Week 13 Nihar Patel 4/6/2019.
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #11
GIGABIT ETHERNET DESIGN ECE Spring 2004
Project GabE ECE 135 – Spring 2005 Presentation 10
Gigabit Ethernet Design ECE – Spring 2004
After service guide for changing PCB
Group 5 – ECE 4006: Week 6 Nihar Patel 7/17/2019.
Pulsar Construction Schedule
Presentation transcript:

ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #10 PROGRESS Arrival of PCBs Arrival of Passive components Ordered Connectorized components First Rx Board Assembled Started first TX Board Assembly Began testing Hit “FIRST” Snag PLANNED WORK week #Nov. 11th – Nov. 17th Awaiting arrival of Connectorized PDs Vendor Contact Final Assembly Continue Board testing Continue trouble shooting Presented by: Muhammad Qayyum

Board Assembly

Assembled Board

Testing

Results