GISC Status Report GISC Pretoria - 2018 2019/09/05 Templ ref: CRS–CC-PRES-TEMP-003.2 Doc Ref no:
AMDCN Connectivity & WIS Compliance RMDCN of 4 mb/s for GTS between Exeter and Pretoria using Internet as backup (was down between May 2018 and August 2018) Direct line between Namibia, Swaziland and Botswana (64 kb/s) although down since move to new HQ using Internet (May 2018) Using Internet to Mozambique, Lesotho, Zimbabwe, Zambia, Malawi, Kenya, Angola and Reunion Only had Malawi enquiring about NC connection to GISC Pretoria 2019/09/05 Templ ref: PPT-ISO-colour.001 Doc Ref no:
Training and Capacity Building Held training for the network administrators for GISC system 15th and 16th March 2018 by IBL. 2019/09/05 Templ ref: PPT-ISO-colour.001 Doc Ref no:
Operational issue in last period Head Office move end of April 2018. UK Met Office link on Internet during the move. GISC and RTH links down in May 2018 1 hour during move. Restructuring and alignment of the SAWS, including ICT. 2019/09/05 Templ ref: PPT-ISO-colour.001 Doc Ref no:
GISC Backup and activities UK Met Office currently unofficial backup As part of SAWS BCP(DR) system fully replicated. 2019/09/05 Templ ref: PPT-ISO-colour.001 Doc Ref no:
Monitoring Activities & Volume Uptime of 99.8% Traffic Volume and sizes not available. 2019/09/05 Templ ref: PPT-ISO-colour.001 Doc Ref no:
Changes in GISC, including new features Moving Weather Upgraded to version 1.7.1d MHS upgraded to be compatible with IWXXM 2019/09/05 Templ ref: PPT-ISO-colour.001 Doc Ref no:
Templ ref: PPT-ISO-colour.001 Doc Ref no: Outlook Local (South Africa) training including WIGOS for organisation (ARC, Hydrological service, etc.) early 2019 Move to speed up SADC countries as NC on the GISC through MASA. 2019/09/05 Templ ref: PPT-ISO-colour.001 Doc Ref no: