LCLS Control System Personnel Linac & BC2 Controls progress

Slides:



Advertisements
Similar presentations
Control and IT Systems status and strategy ALBA, Piotr Goryl on behalf of Michał Ostoja-Gajewski, Krzysztof Wawrzyniak, Łukasz Żytniak, Tadeusz.
Advertisements

Richard M. Boyce FAC Review – Accelerator Installation October 29-31, Installation – Accelerator Systems Installation Planning.
Ernest Williams FAC November 2008 Control Systems Software Section 1 Controls System Installation Status Ernest Williams for Controls Department.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
Hamid Shoaee Control System Installation 3/16/ Downtime Readiness Review Hamid Shoaee For LCLS Controls Group.
Jose Chan and Kathleen Ratcliffe FAC Review- LTU/DUMP installation Status & 6/16/08 1 Linac Installation Status, Schedule.
LTU & Electron Beam Dump Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Technical Design.
FAC, 4/16/07 D. Schultz 1 e-Beams Systems Update People ARR Linac Installation Undulator Production MMF Operations David Schultz.
LCLS Linac System Management Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
Hamid Shoaee LCLS FAC Review – October Control System Overview Hamid Shoaee Controls System Manager Injector control system commissioning & Support.
Geoff Pile LCLS Und. System Fabrication FAC 29 th, 30 th & 31 st October 2007 LCLS Undulator System Fabrication Schedule FAC.
Arturo Alarcon Undulator Controls Module Status 11/12/2008 SLAC National Accelerator Laboratory 1 Undulator Controls Module Status.
Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory Controls Department LCLS Maintenance.
Hamid Shoaee LCLS Control April 20, 2006 LCLS Control System Controls Organization Overview A Progress Report Hamid Shoaee.
David Schultz Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory 1 Undulator Complex Status LCLS Introduction.
Hamid Shoaee Control LCLS ARR Oct 31, LCLS Accelerator Readiness Review Control System for Injector Commissioning.
Josh Stein 29-Apr-08 Undulator Controls Undulator Controls Status Update Josh Stein LCLS Undulator Controls CAM/TL.
LCLS MD Downtime William Colocho June 2014 to June 2016.
RF Systems and Controls for the LERF CM Tests
AIP /02 P Bellomo - QE Magnet Power System Upgrade
Experimental Facilities Planning
Beam-Based Feedback in LCLS-II
Proton Source and LEBT Luigi Celona & Lorenzo Neri
Maintain a single control room for all accelerator programs
LLRF and Beam-based Longitudinal Feedback Readiness
LCLS Cavity BPM Electronics Undulator Week January 22, 2008
LCLS Linac Update Brief Overview L1 & BC1 Progress LTU & E-Dump Status Continuing Resolution Impact.
Injector –Linac Status & Schedule E. Bong LCLS FAC October 12, 2006
LTU/Undulator Installation Status
Magnet PS Controls Hardware Status
Undulator Vacuum System
Advanced Research Electron Accelerator Laboratory
e-Beams Systems Update
Linac/BC1 Commissioning P
Electron Beam Systems ETC and Methodology
Injector / Linac Installation Current Status
LCLS Linac Overview E. Bong Lehman Review August 10, 2004
LCLS Commissioning P. Emma, et al
Overview Pre-Beam Checkouts
Undulator Vacuum System
INJECTOR (WBS 1.2.1) Jym Clendenin, SLAC April 23, 2002
Undulator Cost & Schedule Patric Den Hartog, ANL April 24, 2002
Project Status Review May 13-15, 2008.
LCLS Undulator System Status and Schedule
Electron Beam Systems Wrap-up
Undulator Cavity BPM System Status
LCLS Undulator System Production Management
LCLS Injector Commissioning P
2007 Downtime Controls Installation
Conventional Facilities Status
Shutdown Planning & Installation Schedule
E-Beams Systems Manager
LTU/Undulator Installation Status
E. Michael Saleski PPS and BCS Systems Manager
LCLS Undulator System Status and Schedule
Control System Overview Hamid Shoaee LCLS Control System Manager
LCLS Operation in 2009 Roger A. Erickson
Installation Status & Operational Readiness Process
P. Emma, for the LCLS Commissioning Team LCLS DOE Review May 14, 2009
Electron Beam Systems ETC and Methodology
Injector/Linac Design Status C. E
LCLS e- Beams System Overview
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
e-Beams Systems Update
LINAC System Engineering / Design Status C.E. Rago
LCLS e- Beams Systems Manager
Control System Overview Hamid Shoaee LCLS Control System Manager
Presentation transcript:

LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls Undulator Control System Issues and concerns Summary

New responsibilities in Controls Enzo Carrone, the new deputy in Controls Department, is responsible for LCLS control system Ernest Williams is now the manager of the software engineering & EPICS engineering in Controls

Controls Status since the last review The Linac and BC2 Controls installation went very well The system was delivered in December 2007, within a week of the original schedule

Linac & BC2 Controls was ready in December as scheduled VS the schedule date of 12/3/2007

Summary of Controls Sub-Systems installed for Linac and BC2 Commissioning Cable Plant Networking Magnet power supply Vacuum Controls LLRF Timing system Laser control upgrade OTR/YAG imaging BPM Wire Scanners Faraday Cup Cerenkov monitor Moveable collimator BC2 beamline control Bunch length monitor MPS BCS Configuration software MATLAB feedback system Bunch length measurement

Linac & BC2 Controls in use by physicists & Operations

A new Feedback framework has been commissioned and is in operation Longitudinal Feedback worked successfully. Currently implemented as 3 different feedbacks DL1 Energy DL2 & BC2 Energies DL1, BC2 Energies + BC2 Bunch length Feedback framework allowed significant configurability during commissioning.

Upgraded the Controls for the injector laser

Controls Installation for LTU, Undulator, Dump First Light in FEE FEE/NEH Install PPS Cert. LTU/Dump LTU/Und/Dump Controls Install CD-4 (7/31/2010) J F M A M J J A A S O N D J F M A A M M J J A S O N D J F M A M J J 2008 2009 2010 Down PPS Linac/BC2 Commissioning Re-commission Inj/BC2 to SL2 LTU/Und Comm. FEE Comm. April 18, 2008

Undulator Magnet PS - PH4 Installation Program 54 MCORs - UND 18 QUAD 36 X/YCOR 45 MCORs – UND 15 QUAD 30 X/YCOR (?) 03 Intermediate PS – DUMP 06 MCORs – DUMP B913 B921

Remaining Controls installation benefits greatly from the injector, linac & BC2 experience LTU Controls is similar in scope to Linac & BC2 We are past the engineering learning curve with very little development remaining Almost all procurement is complete including 100% of cable plant All IOCs and VME crates are on hand The order for over 95% of all required control modules (PLC, ADC, motion control, etc.) has been placed Some I&C rack delivery is being delayed, no impact on installation Racks are currently being loaded & tested in high bay area

Rack Assembly Area (B024 )‏ B913 & B921 PS racks B911 & B912 PS racks

INSTALLATION SCHEDULE

PPS cable plant installation is in progress

The readiness status of all systems including racks are reviewed weekly

Equipment Status / Rack Readiness – B921

Schedule – B913

Safety Systems BCS MPS PPS Mature design Project is on schedule Concurrently developing new LCLS MPS Response time of less than one pulse at 120 Hz New hardware extended 1.2 km past current MPS Non-CAMAC Ready for photon section PPS The system design is based on the extension of the injector PLC-based architecture Need to now address the BSY area

Undulator Control System developed in collaboration with ANL Undulator motion control system UCMI Design complete - contract awarded UMPI Design is complete All parts including VME hardware are on-site Assembly started May 12. Expect to take ~2 weeks Layout of rack is complete; 33 loaded Mini-racks will be shipped to SLAC mid June UCM Software testing and debugging complete. Version 1.0 released in April

Undulator Motion Control Software delivered by ANL and is being checked out

Undulator Control System is on schedule for field installation Magnet power supplies: in very good shape Loaded racks are being tested in B024/B15 There is a detailed schedule covering bench testing, through field installation Software design is mature, requires little if any changes RF BPMs – production proceeding well Receivers will be shipped to SLAC June-July Timing, Vacuum, Networks are all on schedule WPM (6 Mini-racks), HLS: 1 Dbl rack in B913 & 4 CISCO enclosures will be interfaced to the control system

Conclusions The linac & BC2 control system is online & operational We are on schedule for the installation and completion of electron control system The major risk for the above items is schedule rather than technical complexity detailed plans are in place for the undulator control in collaboration with ANL