Custom Mezzanine for the MTF7 Processor

Slides:



Advertisements
Similar presentations
LHC CMS Detector Upgrade Project US CMS Trigger Upgrade Introduction to Cost & Schedule Wesley Smith, U. Wisconsin Fermilab Directors Review 16 July 2013.
Advertisements

M. Noy. Imperial College London Calice MAPS Adapter Card Review M. Noy 26 th June 2007.
CPT Week, Nov 2003, B. Paul Padley, Rice University1 CSC Trigger Status, MPC and Sorter B. Paul Padley Rice University November 2003.
Sector Processor – to – Muon Sorter tests M.Matveev Rice University January 8, 2004.
A presentation by Angela Little SULI Program 8/4/04 Pulsar Boards and the Level II Trigger Upgrade at CDF.
US CMS DOE/NSF Review: June 2002, Darin Acosta, University of Florida1 Muon Track-Finder Trigger Darin Acosta University of Florida June, 2002.
CSC Trigger Report: Results from June 25 ns beam test Production plans Software Darin Acosta University of Florida.
Printed by Topical Workshop on Electronics for Particle Physics TWEPP-08, Naxos, Greece / September 2008 MEZZANINE CARDS FOR.
Status of the CSC Track-Finder Darin Acosta University of Florida.
K.C.RAVINDRAN,GRAPES-3 EXPERIMENT,OOTY 1 Development of fast electronics for the GRAPES-3 experiment at Ooty K.C. RAVINDRAN On Behalf of GRAPES-3 Collaboration.
Alex Madorsky University of Florida/Physics Track Finder production readiness review, Rice, August 2004 Track Finder Crate, Backplane and Parts Alex Madorsky.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
CSC EMU Muon Sorter (MS) Status Plans M.Matveev Rice University August 27, 2004.
CSC Endcap Muon Port Card and Muon Sorter Upgrade Status May 2013.
CSC Endcap Muon Sorter Mezzanine Board Rice University July 4, 2014.
Muon Port Card, Optical Link, Muon Sorter Upgrade Status M.Matveev Rice University December 17, 2009.
Wilco Vink 1 Outline Optical station Vertex processor board Output board Latency.
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF Mikhail Matveev Rice University 17 August 2012.
CSC EMU/Track Finder Clock and Control Board (CCB’2004) Status Plans M.Matveev Rice University August 27, 2004.
Upgrade of the CSC Endcap Muon Port Card Mikhail Matveev Rice University 1 November 2011.
CSC Endcap Muon Port Card and Muon Sorter Status Mikhail Matveev Rice University.
Tests of the Fully Loaded CSC Track Finder Backplane M.Matveev S.-J. Lee Rice University Alex Madorsky University of Florida 2 May 2005.
March 2005, USCMS Trigger video meetingD. Acosta1 Revised Schedule for SP Pre-Production Continued testing of first two pre-production boards over next.
US CMS DOE/NSF Review, May Cal. Trig. 4 Gbaud Copper Link Cards & Serial Link Test Card - U. Wisconsin Compact Mezzanine Cards for each Receiver.
CSC Muon Sorter M. Matveev Rice University January 7, 2003.
1 VELO integration INTEGRATION, december 05 OUTLOOK : - PARTS - 3D MODEL - LV & HV CABINETS INTEGRATION - LV CABLING - RPT CABLING.
Connector Differential Receiver 8 Channels 65 MHz 12 bits ADC FPGA Receive/buffer ADC data Format triggered Events Generate L1 Primitives Receive timing.
12 September 2006Silicon Strip Detector Readout Module J. Hoffmann SIDEREM SIlicon Strip DEtector REadout Module.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, September 2004 Trigger Report - 1 CSC Trigger Muon Port Card & Sector Processor in production Mezzanine.
US CMS DOE/NSF Review, 20 November Trigger - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF Status.
Electronics Review, May 2001Darin Acosta1 OPTICAL SP 1 Muon Sorter 3  / port card 3  / sector ME1 ME2-ME3 ME4 SR DT TF SP From CSC Port Cards MS MB1.
Upgrade of the CSC Endcap Muon Port Card with Spartan-6 FPGA Mikhail Matveev Rice University 30 April 2012.
M.Matveev Rice University March 20, 2002 EMU Muon Port Card Project.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, May, 2004 Trigger Report - 1 CSC on-detector peripheral crate SBS VME Controller Muon Port Card: Output.
CCB to OH Interface M.Matveev Rice University February 22,
The CMS Modular Track Finder (MTF7) Trigger Board D. Acosta, G. Brown, A. Carnes, M. Carver, D. Curry, G.P. Di Giovanni, I. Furic, A. Kropivnitskaya, A.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Dariusz Makowski, Technical University of Łódź, DMCS ATCA LLRF project review, DESY, 3-4.
Electronics for Range System Prototype Tests
Novosibirsk, September, 2017
xTCA in CMS Magnus Hansen Thanks to many CMS collaborators
Update on CSC Endcap Muon Port Card
CSC EMU Muon Port Card (MPC)
Combined SR/SP UF Fits all of previous SP board logic! Main FPGA
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF
GTK-TO readout interface status
ALICE Trigger Upgrade CTP and LTU PRR
Task T - CMS at LHC Global Calorimeter Trigger
CMS EMU TRIGGER ELECTRONICS
eXtremely Fast Tracker; An Overview
xTCA in CMS Magnus Hansen Thanks to many CMS collaborators
Regional Cal. Trigger Milestone: Major Production Complete
Current Status of CSC Trigger Elements – Quick Summary
Darin Acosta University of Florida
PRODUCTION BOARDS TESTING
Regional Cal. Trigger Milestone: Production & Testing Complete
Master I/O Connectors PL12 PL14 PL21 PL20 PL17.
CSC Trigger Muon Port Card & Sector Processor in production
New Calorimeter Trigger Receiver Card (U. Wisconsin)
Track Finder Crate, Backplane and Parts
CSC Trigger Meeting Summary
PCB-1 HEADER / CONNECTOR
clock DELAY CPLD RS232 DEBUG 4x 8way DIL CLOCK ~50 MHz ASYNC SW
PRODUCTION BOARDS TESTING
block diagram, but this path exists as you mention MUX[3:0]=15?
4.4 – relations, domain, & range
Muon Port Card Latency, October 2015
Sector Processor Status Report
CSC Muon Sorter Status Tests Plans M.Matveev August 21, 2003.
Plans for the 2004 CSC Beam Test
CSC Hot Spares LV Modules (24 units needed) HV Modules Custom Modules
Presentation transcript:

Custom Mezzanine for the MTF7 Processor • Intended for local triggering with the new uTCA based CSC Track Finder • Resides on the MTF7 processor in place of PtLUT mezzanine card • Designed at Rice University in spring of 2015 for the uTCA Muon Sorter • Five boards were built, two assembled and tested Top view Bottom view

LVDS to LVTTL converters LVTTL to LVDS converters Block Diagram 24-pin connector 300-pin mezzanine connector LVDS to LVTTL converters 12 pairs LVDS inputs from 12 MTF7 Processors (active “Low”) 12 OR L1_Request to TCDS LVTTL output LEMO MUX Spare LVTTL output LEMO 3 pairs LVTTL to LVDS converters 3 LVDS outputs 10-pin connector

MTF7 with custom mezzanine

MTF7 with custom mezzanine in the uTCA crate