Undulator Systems Integration

Slides:



Advertisements
Similar presentations
Rodd Pope, SLAC Undulator System October 12-13, 2006 FAC Meeting 1 Undulator System Assembly Plans Rodd Pope, SLAC.
Advertisements

Rodd Pope, SLAC Undulator System April 16-17, 2007 FAC Meeting 1 Undulator System Assembly, Installation, and Integration.
LCLS SUT Layout Undulator Magnet and Support Motion Vacuum SystemMotion DiagnosticsMotion Thermocouple New Renderings, Add Thermocouple Labels
Richard M. Boyce FAC Review – Accelerator Installation October 29-31, Installation – Accelerator Systems Installation Planning.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
Geoff Pile FAC Review - Undulator 12 November 2008 LCLS Undulator System Overview and Fabrication Geoff Pile.
Marion M. White Undulator System 07 April 2005 LCLSLCLSLCLSLCLS Undulator System Tests Marion M. White ANL-ASD-LCLS.
Geoff Pile LCLS Fixed support IDR 12 th January 2006 LCLS Fixed Support IDR Introduction and History Are special fixed supports needed?
Geoff Pile FAC Review - Undulator 17 June 2008 LCLS Undulator System Status and Schedule Geoff Pile.
Geoff Pile FAC: SUT Status & Plans 20 th / 21 st April 06 Single Undulator Test Status/Plans April 06 Geoff Pile.
FAC, 4/16/07 D. Schultz 1 e-Beams Systems Update People ARR Linac Installation Undulator Production MMF Operations David Schultz.
Richard M. Boyce FAC October 29-31, Installation Planning Integration process – IMT update Installation Planning &
Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 1 Installation Alignment,
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
Rodd Pope, SLAC Undulator System April 20-21, 2006 FAC Meeting 1 Undulator System Assembly Plans Rodd Pope, SLAC In collaboration.
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics.
Robert Ruland Intra Girder Assembly and Alignment - October 20, 2005 Internal LCLS Undulator Alignment and Motion Review 1 Intra.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Geoff Pile LCLS Und. System Fabrication FAC 29 th, 30 th & 31 st October 2007 LCLS Undulator System Fabrication Schedule FAC.
FAC, 10/12/06 D. Schultz 1 Readiness for 2007 Startup Linac Injector Controls ARR David Schultz.
LCLS Undulator Positioning Control System Shifu Xu, Joseph Xu, Josh Stein Control Group, AES/APS, ANL June 15, 2006.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
Marion M. White Undulator System 27 October FAC LCLSLCLSLCLSLCLS Progress on the Undulator Module System Test Marion M.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009.
O. Kester, NuSTAR annual meeting, 27/02/2013
Jan , 2008 LCLS Undulator Week Dean R. Walters 1 Vacuum Components Undulator System SH Lee, J Morgan, and D Walters.
ELENA installation progress F. Butin / ELENA collaboration.
S A Griffiths CM42 June 2015 Electrical & Control.
Communication and Documentation Needs exemplified on WP 71
2K CB FDR Overview:  Agenda, Charge, Review Process
Injector –Linac Status & Schedule E. Bong LCLS FAC October 12, 2006
LTU/Undulator Installation Status
Undulator Scope, Management, and Organization
e-Beams Systems Update
Electron Beam Systems ETC and Methodology
Injector / Linac Installation Current Status
Undulator System Components Status Dean Walters
Undulator Cost & Schedule Patric Den Hartog, ANL April 24, 2002
Undulator Tuning Status Heinz-Dieter Nuhn, SLAC / LCLS for Zack Wolf, Yurii Levashov, Achim Weidemann, Seva Kaplounenko, Scott Jansson, Ralph Colon, Dave.
LCLS Undulator System Status and Schedule
PSS verification and validation
Undulator Cavity BPM System Status
LCLS Undulator System Production Management
E-Beams Systems Manager
LTU/Undulator Installation Status
LCLS Undulator System Status and Schedule
Installation Status & Operational Readiness Process
Undulator Long-Lead Procurement Preparation
DOE Review of the LCLS Project October 2006
Undulator System Overview
Undulator Integration Test Status
Fixed Support Design & Testing
Electron Beam Systems ETC and Methodology
Injector/Linac Design Status C. E
Undulator Assembly and Installation Planning
LCLS e- Beams System Overview
Physics Requirements for Conventional Facilities
Undulator and Magnet Production Status 25 October 2006
Undulator Alignment Plan
CF Scope, Management & Organization
Alignment Diagnostic System Status
LCLS Control System Personnel Linac & BC2 Controls progress
LCLS Undulator Scope, Management, Organization
LCLS e- Beams Systems Manager
Undulator Hall Power Dissipation
Presentation transcript:

Undulator Systems Integration vxv Undulator Systems Integration Geoff Pile Test

Undulator System Integration Integrated System Engineering Hazard and Risk controls tailored to work being performed at ANL Defining clear roles and responsibilities Integration priorities during design, build, installation, and commissioning Equipment Integration at SLAC Balanced Priorities and schedules Lessons learned – ESDs help integration

Undulator System Integration Integrated System Engineering Hazard and Risk controls tailored to work being performed at ANL Defining clear roles and responsibilities Integration priorities during design, build, installation, and commissioning Equipment Integration at SLAC Balanced Priorities and schedules Lessons learned – ESDs help integration

Hazard and Risk Controls [A few minutes in 30: An example of an integrated safety net] Suspect Counterfeit Bolts Integrating Safety into LCLS ANL Training includes ESH273 (identifying counterfeit components) to comply with DOE order G440 1-6. Integrating QA into safety at APS-LCLS Tom Barsz (QA) has created a comprehensive QA program for APS – LCLS. Every PARIS procurement requires QA approval. Every QA approval has built- in safety checks. Tom’s QA database double-checks PARIS acquisitions. Net result: Enhanced Safety

Integrating Safety at APS-LCLS PARIS gets linked to QA database PARIS req # → Tom’s supplier history → ESH and QA checklists →

Integrating Safety at APS-LCLS ← Vendor product info Tom’s issues → ESH and QA Check – flags an item for disapproval →

Undulator System Integration Integrated System Engineering Hazard and Risk controls tailored to work being performed at ANL Defining clear roles and responsibilities Integration priorities during design, build, installation, and commissioning Equipment Integration at SLAC Balanced Priorities and schedules Lessons learned – ESDs help integration

Define Clear Roles and Responsibilities Undulator Systems Integration Why define clear roles in integration? Helps prevent project failures. Defines who’s doing what, where, and when. In the initial phases of the project, people look after their own design problems first. They may not always consider integration consequences. When? Weekly CAM, CPR, group meetings, and Internal Design Reviews help with integration and general awareness of issues. Organized weekly ANL/SLAC meetings until the end of the project. RP and GP have regular teleconference between ANL & SLAC. All APS/SLAC staff are invited to participate whenever they need/wish. Who? Rodd Pope (SLAC) and Geoff Pile (ANL) planning post-SUT activities at ANL and SLAC. Cost account managers (CAMs); delegate project tasks to staff in order to meet defined goals in the Effort Scheduling & Reporting Tool.

Define Clear Roles and Responsibilities

Define Clear Roles and Responsibilities

Define Clear Roles and Responsibilities

Undulator System Integration Integrated System Engineering Hazard and Risk controls tailored to work being performed at ANL Defining clear roles and responsibilities Integration priorities during design, build, installation, and commissioning Equipment Integration at SLAC Balanced Priorities and schedules Lessons learned – ESDs help integration

Integration Priorities Overall System Integration Philosophy Design Phase Understand the concept. Design the sub components. Integrate them together. Build and Testing Phase Verify form, fit and function. Integrate enhancements from SUT into the Final Designs for production. Production Assembly Phase Integrating the schedule for delivery, assembly and alignment of components. Installation and Commissioning Phase Integrate all mechanical, electrical and alignment tasks for installation prior to initial component turn-on and commissioning.

FY05 Integration Priorities During Design and Build Phase We continued to plan, schedule, and incorporate Base Line Changes Continual review of overall concepts and specifications Review all the most recent designs (even without IDRs) Individual designs are integrated into complete assembly drawings Review all interfaces Good revision control Internal Design Reviews firm up concepts Building, testing, and verifying component designs for SUT FY06: Now we’re in a better position to plan details for assembly, installation, and commissioning

FY05 Integration Priorities: get firmer designs Significant change and progress in the past few months SHORT BREAK END VIEW at BPM LONG BREAK

IDRs: Quad and Corrector Magnets 11/18/06 vxv IDRs: Quad and Corrector Magnets 11/18/06 Uses the same power supplies as SLAC: MCOR Power Systems Initial Concept for Quadrupole/Corrector Magnet Quadrupole/Corrector Magnet Location view Test

IDRs: Vacuum Chamber 1/5/06 Vacuum Chamber (316LN SST) The original chamber supports were adequate. A new design has evolved. Quote from IDR report: “The conceptual designs for the chamber, support, and bellows are thoroughly evaluated. They should achieve design requirements for the undulator system. However, the committee has recommendations to be evaluated during the prototype testing that could improve the design further.”

IDRs: Fixed Supports 1/12/06 Chronological Support Design Design changes incorporated from design reviews involving ANL and SLAC personnel. Internal Design Review 1/12/06 SUT should enhance production version 9-30 07-19 10-31 11-27

Undulator System Integration Integrated System Engineering Hazard and Risk controls tailored to work being performed at ANL Defining clear roles and responsibilities Integration priorities during design, build, installation, and commissioning Equipment Integration at SLAC Balanced Priorities and schedules Lessons learned – ESDs help integration

Equipment Integration at SLAC Rodd Pope replaces Brad Youngman for FY06 FY05 Brad Youngman/GP + An early integration example with SLAC: identifying requirements for “Heat loads in the tunnel” helped define more than just where things go inside and what’s outside. FY06 Rodd Pope/GP + Undulator design defined much better. Re-work detailed integration plan for delivery, assembly, and installation thru to commissioning. Rodd assumes additional assembly scope; e.g., Quad Magnet power supplies, racks, and cables. Other examples: Barsz/Dutcher - ProE reports. Marsh - IDR info .

vxv CELL 1 ASSUME AIR COOLED ELECTRONIC BOXES A,B,B+& C. 4.2W 4.2W 4.2W 4.2W 4W 4W 4W 4W 3.8W 3.8W M3-10W 3.8W 0.23W 3.8W M2-5W Q M3-10W Q 0.23W M2-5W M3-10W 0.23W M4-5W M2-5W Q C DLB A M1-5W M4-5W C B A M1-5W M4-5W C A M1-5W B B+ Test

Equipment Integration at SLAC vxv Equipment Integration at SLAC Heat Balance in the LCLS Tunnel Present Design QW QL QC QE QU QW = heat dissipation in the tunnel wall and floor QC = heat dissipation in chilled lines QU = heat input from undulator components QL = heat input from lighting QE = heat input from electronics Heat Imbalance: ΔQ = QU + QL + QE - Qw – QC (for each undulator length) SLAC CF takes info, compares their study and makes more educated decision Test

Equipment Integration at SLAC vxv Equipment Integration at SLAC Recommended Approach (Sharma, Pile and Worek) QW QL QC QE QU QH Radiator Panels Resistive Heaters 20,000 cu ft/min should give good temperature control to within ±0.3° to 0.5°C Adding radiator panels and resistive heaters are cheap additions, if required (would give faster stability control). The radiator panels are selected to be large enough to provide a cold bias. All resistive heaters can be connected to a single controller. For a better heat balance, the resistive heaters are computer-controlled individually. Test

Equipment Integration at SLAC Heat Generators in the Undulator Tunnel We optimized the positions of the heat generators. Many questions on temperature control forced us to firm up designs for control electronics, diagnostics, quad magnets, power supplies, and cabling.

Undulator System Integration Integrated System Engineering Hazard and Risk controls tailored to work being performed at ANL Defining clear roles and responsibilities Integration priorities during design, build, installation, and commissioning Equipment Integration at SLAC Balanced Priorities and schedules Lessons learned – ESDs help integration

Balanced Priorities and Schedules Single Undulator Integrated System Test @ ANL Prototype “Fixed Support” support due 3rd week of Feb 06 Prototype support/mover system: Girder, CAM movers, Rollaway system, controls software and hardware Carefully coordinate return of prototype undulator from SLAC (may use dummy early March and switch to1st article when available) “Quadrupole” with fiducialization surfaces “BPM” with fiducialization surfaces “Vacuum Chamber” “WPM, HLS, BLM” sensors Earthquake protection bracing

Goals of the Single Undulator Test Balanced Priorities and Schedules Goals of the Single Undulator Test Provide critical input to the S/M system design reviews. Help to determine whether the support/mover system design is ready for final production. Measure girder and rollaway motions. Determine precision and reproducibility of motions, including start and stop. Check for interference. Measure vibration damping or (hopefully not) amplification. Measure position stability and temperature dependence of components and subcomponents. Practice undulator replacement technique on SUT translation stages. Enhance the final integrated design for production.

Balanced Priorities and Schedules Single Undulator Module Test Start is driven by decision to wait for supports in late February 06. SUT "performance” test is scheduled for two weeks in March 06 with six additional weeks planned for integration testing and enhancements. Multiple Undulator Module Test No MUT at APS. EAA RF Area designated for re-assembly of one complete undulator and short and long break “mock-ups”. The EAA is readily available.

Undulator Magnet and Support SUT – Paint by numbers LCLS SUT Layout Undulator Magnet and Support Motion Controls Vacuum System Diagnostics

Undulator Magnet and Support Thermocouple Location SUT: Integration Interfaces LCLS SUT Layout Undulator Magnet and Support Motion Controls Vacuum System Diagnostics 3 15 14 Thermocouple Location 1 Undulator 2 Ambient Air 3 Ambient Air at Quad 4 Quad 5 RFBPM 6 Girder 7 Undulator Motor (Dwn Strm) 8 Undulator Motor (Up Strm) 9 Girder Motor (Single) 10 Girder Motor (Double) 11 Floor Support (Upper) 12 Floor Support (Lower) 13 Vacuum Chamber Support 14 Vacuum Chamber (At Beam) 15 Vacuum Chamber (Strngbk) 16 Ion Pump 5 4

Balanced Priorities and Schedules Post-SUT Priorities … Support/mover/module Implement design enhancements prior to final design reviews Updated drawings and documentation Procurement and component fabrication, acceptance and delivery criteria … and Schedules Rodd Pope/Geoff Pile – Integrate final undulator designs and re-work the undulator system engineering plan that optimizes planning and scheduling for the assembly, installation, and commissioning at SLAC. Geoff Pile integrates assembly procedures, coordinates component delivery schedules with SLAC, helps with assembly issues at SLAC. Rodd Pope takes much assembly scope – e.g., undulator assembly in MMF, quad magnet power supply racks and cables for buildings 2.3 and 3.1.

Undulator System Integration Integrated System Engineering Hazard and Risk controls tailored to work being performed at ANL Defining clear roles and responsibilities Integration priorities during design, build, installation, and commissioning Equipment Integration at SLAC Balanced Priorities and schedules Lessons learned – ESDs help integration

Lesson Learned from SLAC We’ve learned why ESDs are valuable early on ANL now understands it as an Engineering (Requirements and) Specification Document. Status update received 1/20 1.4-102 – Quadrupole Magnet Specification Author: Jaski Target Completion Date: 1/31 1.4-103 – Line Diagnostics System Engineering Specifications (UD1) Author: Yang/Bailey Target Completion Date: TBD 1.4-104 - Wire Position Monitor System Specifications Author was Ruland. Needs new author assigned. In-Progress. 1.4-105 – Hydrostatic Leveling System Specifications Author was Ruland. Needs new author assigned. In-progress. 1.4-106 – Vacuum System Specifications Author: Walters 60% Complete 1.4-107 – Undulator Motion Controls Author: Stein Target Completion Date: 1/31 1.4-110 – Wire Scanner Engineering Specifications (UN3) Author: Bingxin/Bailey Target Completion Date: 1/31 1.4-XXX – Undulator and surrounding Thermal Monitoring Specifications Author: Stein Target Completion Date: TBD 1.4-108 - Undulator Protection System – Unassigned (ANL to take responsibility) 1.4-XXX – Undulator Cable, Tray and Rack Specifications 1.4-112 – Undulator Support/Mover System Author: Collins/Sharma Target Completion Date: 1/13 1.4-XXX – Beam Finder Wire Specification Author: Bailey Target Completion Date: 2/7 1.4-XXX – RF Beam Position Monitor Engineering Specification (UD5) Author: Lill/Walters Target completion date: 1/31 4 additional ESDs planned requiring numbers assigned ANL is pushing hard to get twice the amount of original ESDs out.

Vacuum Chamber Goes in Here Ignore this slide. Vacuum Chamber Goes in Here