Saturday 28th 08:17 Fill #1812: Stable beams, peak luminosity ~1.1x1033 cm-2s-1 19:00 Go to adjust for RF-checks; Record fill lumi of 31.7 pb-1 for CMS.

Slides:



Advertisements
Similar presentations
21/05/2012LHC 8:30 meeting Overview Week 20 Injectors, LHCb polarity, Beam-Beam Coordinators: Bernhard Holzer, Jan Uythoven.
Advertisements

LHC Wed 16 Sept 2015 Struggling with cryo o-night Tuesday - Wednesday 07:11 Injecting again 09:00 Dump on injection of train of 144 bunches, losses IP7.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
Thursday 21/4 07:30: End of fill #1727. Beam dumped. ALICE compensator magnet fault. Delivered ~6.7 pb -1 in 7.5 h. 11:30 Stable beam # bunches/beam.
Plan for start-up with beam Friday  19:00 Machine closed. Ramp for powering tests & pre-cycle  22:00 Pilots through nominal cycle up to collisions. Measure.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
Monday :00 Injection for physics fill # :00 Stable beams fill #1816, luminosity ~1.2x1033 cm-2s-1 11:08 Beams dumped. QPS trigger on detector.
LHC Status Fri Morning 3-June
Ion Commissioning: Thursday & Friday
Wednesday
Wednesday 8.9 External crossing angles:
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Saturday 24 March 2012.
Wednesday September 14th
Luminosity lifetime – fill 2932
Monday 14th March Second fill with pilot + 3 nominal bunches
Monday fill with 1092 bunches (6 h stable beams)
Monday 11/07: Recovery Plenty of accesses.
Saturday 30th June - Sunday: Rocky !
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Tue :25 Beams dumped due to RF vacuum interlock
LHC Morning Meeting - G. Arduini
Saturday 12:00 Fill 1992 in stable beams.
Summary of Week 11: 14 – 21 March
LHC Morning Meeting - G. Arduini
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Summary of Week 16 G. Arduini, J. Wenninger
Friday 31st August & night
Friday day 00:51 Fill #1862 Beams lost to inner triplet skew quad power converter fault. Delivered lumi 33 pb-1 Access required for repair RQSX3.L1 converter.
LHC Operations overview Week 28 – Getting back
Summary of Week 26 Main aims: G. Arduini, B. Holzer, M. Lamont
Friday :00 machine setup for luminosity run. Better b-to-b stability from injectors. 01:58 stable run with 228 bunches 11:00 luminosity leveling.
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Friday morning 10:30 Optics measurements and corrections.
Saturday – Morning 7:36 beams dumped
Yesterday’s morning’s controls issues
Finally.... We had to wait a long time.... We had many problems....
Friday AM Some oscillations of the cryo conditions in MSR8 perturbed the setup for injection. RF frequency interlock fixed – required a reset of RF controls.
BI cont. *** Summary Matching Monitor test *** We only had ~15minutes of inject and dump, but managed to see a profile with ~9e9 p (!)
Summary Thursday h21: Stable beams fill #1303.
Sunday/Monday & :30 Stable beams. Fill #1851.
Saturday Nov Stop proton operation. Switch back to ions
Friday 07:00 Fill 1729 dumped. Movement device allowed flag switching to FALSE. From the logs, it seems the energy went to FFFF/7860 GeV. To be confirmed.
Thursday – Morning Energy matching at injection with H CODs
Fill 1743 Peak luminosity ~6.7 e32 Integratated lumi ~20 pb-1
Monday 6th 07:39 Dump fill #1854, RQ6.L2 tripped, followed by access
Saturday Wire scans at end of fill 1253 B1H : 4.2 B1V : 4.3 B2H : 5 B2V : 7.2 Beams dumped (after ~14h of collisions) Some issues during refill.
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Thursday 22 September 2011.
Wednesday h10: Programmed dump. 07h54: Injection. 200b.
Saturday :42 stable beams fill 3541
Monday Fill 1803 into stable beams at 9:30. Dump at 19:45.
Saturday 12 March Morning: problem on RSD1.A12B2 – flow rate problem on the cooling water for the converter. 14:00: Loss map -500 Hz (positive energy offset)
Wednesday 16th May 03:05 beam dump, RF fault crowbar problem on module M1B2 06:09 Another crowbar at injection. Access for RF; problem Beam Imminent Warning.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Friday h55 Stable beams. Fill #1841. Lumi ~1.2e33.
Another Immortal Fill….
Tuesday 24/5 Fill # :00 Stable beam fill # bunches
Monday 27th August & night
Saturday Luminosity production 1380 bunches
Saturday 26 November 2011.
Tuesday
Sunday 12th 00:29 Stable beam fill #1864. Initial lumi 1.1e33
Wednesday 8th (I) 09:22 Fill #1855. Beams dumped by Alice dipole trip Stable beams for 10.5 hours; int. lumi 31 pb-1 After investigation EPC could not.
Tuesday
Presentation transcript:

Saturday 28th 08:17 Fill #1812: Stable beams, peak luminosity ~1.1x1033 cm-2s-1 19:00 Go to adjust for RF-checks; Record fill lumi of 31.7 pb-1 for CMS 20:00 Beam Dump Access for QPS, UPS, timing and other problems... 01:00 Injection for physics fill #1813 03:15 Stable beams, peak luminosity ~1.0x1033 cm-2s-1 04:45 Beam dumped by an UFO in 28.L8 07:00 Fill and ramp for loss map and test new betastar limits for collimator gaps 08:30 Dump with loss map and recycle for filling 29/5/2011 LHC 8:30 meeting

Fill #1812.... and afterwards... First hours: Problems with DIP-, TMG-servers and lumi levelling Switch TMG to spare B system 8:40 Lost the QPS of the main quads of S67 Will probably need access when beams dumped 13:40 Be-CO first line has arrived and started the intervention on the timing server A (CPU to be changed) After the dump SIS interlock on RF power at 3.5 TeV tested ok, but not yet activated for the night Access: “(another) problem with the timing controller, was trying to get a table without start event” UPS US85 is not working. Experts are in US85 and tried to switch it back, but it gives an electric arc. UPS US85 not redundant any more BUT ONLY SERVES CRYOGENICS (mp) QPS specialists in points 6 and 8 One LL RF module does not switch back on again 29/05/2011 LHC 8:30 meeting

Fill #1812 Relative losses of bunch current after 3.5 hours Clear effect of number of collisions B2 increasing losses of one bunch when levelling IP2 and LHCb at the same time 29/05/2011 LHC 8:30 meeting

Switching off one RF cavity After 5 minutes see the “bunches” passing the abort gap After 20 minutes abort gap population starts to decrease 29/05/2011 LHC 8:30 meeting

Dump with one cavity off Still enough beam in the abort gap to get a false XPOC 29/05/2011 LHC 8:30 meeting

Fill #1813 Some bunches blown up and intensities not very flat However lumi ok 29/05/2011 LHC 8:30 meeting

04:45 Beam dumped by an UFO in 28.L8 29/05/2011 LHC 8:30 meeting

New betastar limits for collimator gaps worked as expected. 29/05/2011 LHC 8:30 meeting

Off energy loss map (-500 Hz): SR says OK 29/05/2011 LHC 8:30 meeting

Plan Sunday Outstanding Loss map off-energy at 3.5 TeV: done! No rMPP surprises.... Fill 1092 x 1092 bunches Outstanding Asynch dump test @ 3.5 TeV for Roman Pots End of fill: TCL adjustment Measure chromaticity for FIDEL over the ramp TCLIB adjustment before going to 144 bunch injection 29/05/2011 LHC 8:30 meeting