Symantec 2010 Windows 7 Migration Global Results
Methodology Applied Research performed survey 1,360 enterprises worldwide SMBs and enterprises Cross-industry 2
Key Topics Attitudes about migrating Manpower requirements Preparing for the migration General recommendations Results of the migration 3
4 Attitudes About Migrating
Timing and Motivations Typically wait six to 12 months Only 8% migrate immediately Performance, reliability and end-user experience motivated migration Most (62%) set ROI goals 90% met ROI goals 5
6 Manpower Requirements
Manpower requirements Typically involve half of IT staff Most automated the process 10 PCs worth automating Time consuming aspects: – Planning (17%) – Actual execution of upgrade (12%) – Reinstalling applications (10%) – Inventorying existing machines (10%) – Running pilot tests (9%) 7
8 Preparing for the Migration
Before the migration What to capture beforehand – User files & documents – Links to network drives – RAM, processor speed, PC age, budget important 10 IT man-hours in preparation 9
Hardware recommendations CPU – Minimum: 2 to 2.5 GHz – Optimal: 2.5 to 3 GHz RAM – Minimum: 2 GB – Optimal: 4 GB Storage – Minimum: 200 to 500 GB – Optimal: 500 GB to 1 TB Video RAM – Minimum: 512 MB – Optimal: 1 GB or more 10
11 General Recommendations
General recommendations Standardization, added security, and virtual desktop 71% replace incompatible applications 12
Ensuring success / Easing the process Planning Training Pilot tests 13
14 Results of the Migration
Results of the migration 78% said process was smooth 63% said easier than last migration Most achieved key motivations Most ran into delays End-user satisfaction increased over time 15
Best vs. Worst Practices in Information Management Users offline 2 hours 60% of users extremely satisfied Differences 20 IT man-hours in preparation Extremely important: – Advanced planning (56% ) – Upgrading hardware (45%) – Pilot test (45%) – Training (44%) – Capture user profiles (42%) – Proper inventory (35%) Users offline 6 hours 25% of users extremely satisfied Differences 9 IT man-hours in preparation Extremely important: – Advanced planning (30% ) – Upgrading hardware (31%) – Pilot test (34%) – Training (26%) – Capture user profiles (27%) – Proper inventory (24%) Top tier resultsBottom tier results
17 Appendix All questions included
Company size 18
Industry 19
Computer involvement 20
Computer knowledge 21
Windows 7 involvement 22
Expected use of Windows 7 23
User downtime 24
User downtime 25
Migration planning 26
Transition difficulty 27
Additional technologies 28
Delaying issues 29
Machine types 30
Machine types 31
Previous operating system 32
Influencing factors 33
When to upgrade 34
Economic impact 35
Current machines vs. new machines 36
Upgrading vs. fresh install 37
Communication 38
End user reaction 39
IT workforce involvement 40
Setting ROIs 41
Meeting ROIs 42
Affected factors 43
Minimizing cost 44
Successful migrations 45
Migration process 46
Automation vs. manual 47
Previous migrations 48
Previous migrations 49
Migration tools 50
Post-migration issues 51
Migration approaches 52
Migration approaches 53
Incompatible applications 54
Pre-migration captures 55
Helpful factors 56
Helpful factors 57
Pilot tests 58
Automatic vs. manual migrations 59
Hardware specifications 60
Hardware specifications / recommendations 61
Hardware specifications / recommendations 62
Hardware specifications / recommendations 63
Hardware specifications / recommendations 64
Hardware upgrades 65