Liaison Report to Date: Authors: January 2013

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0142r0 Submission July 2012 Slide 1Hyunduk Kang, ETRI Liaison Report to Notice: This document has been prepared to assist.
Advertisements

Liaison Report to Date: Authors: January 2012
TGu Timeline Date: Authors: March 2006 March 2006
LB84 General AdHoc Group Sept. Closing TGn Motions
[ Interim Meetings 2006] Date: Authors: July 2005
March 2013 Opening Report Date: Authors: March 2013
IEEE WG Status Report – July 2005
LB73 Noise and Location Categories
Call for Contribution to IG CUB
LB73 Noise and Location Categories
SG CUB Tentative Timeline
Waveform Generator Source Code
Liaison Report to Date: Authors:
March 2014 Election Results
TV White Space Coexistence Plan
TGp Closing Report Date: Authors: July 2007 Month Year
[ Policies and Procedure Summary]
[ Policies and Procedure Summary]
November Opening Report
Motion to accept Draft p 2.0
Liaison Report to Date: Authors: March 2012
TGp Motions Date: Authors: November 2005 Month Year
Submission Title: TG4m 4TV Closing Report for January 2013
TGp Closing Report Date: Authors: March 2006 Month Year
January 2010 Joint 11/19/22 TVWS Meeting
IEEE P Project Status Date: Authors: July 2013
November Opening Report
TGu Timeline Date: Authors: March 2006 March 2006
TGp Closing Report Date: Authors: March 2006 Month Year
Reflector Tutorial Date: Authors: July 2006 Month Year
TGu Timeline Date: Authors: January 2005 January 2005
July 2012 Opening Report Date: Authors: July 2012
IEEE WG Opening Report – July 2008
Reference Use Cases Date: Authors: September 2010
TGu Timeline Date: Authors: July 2005 July 2005
TGu Timeline Date: Authors: July 2006 July 2006
TGu Timeline Date: Authors: November 2006 November 2006
Liaison Report to Date: Authors: May 2012
September Opening Report
TGu Timeline Date: Authors: May 2006 May 2006
LB73 Noise and Location Categories
March 2012 Opening Report Date: Authors: March 2012
IEEE P PAR Extension Request
January 2015 SG CUB Closing Report
IEEE WG Opening Report – July 2007
TGu Timeline Date: Authors: May 2006 May 2006
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
TIA Liaison Report November 2005
November Opening Report
[ Policies and Procedure Summary]
March Opening Report Date: Authors: March 2011
Liaison Report to Date: Authors: January 2012
November 2012 Opening Report
Liaison Report to Date: Authors:
September 2012 Opening Report
Questions to the Contention-based Protocol (CBP) Study Group
January Opening Report
Advanced Beaconing Schedule and Timelines
TGu Timeline Date: Authors: May 2006 May 2006
Motion to go to Letter Ballot
July 2015 SG CUB Closing Report
TGu Timeline Date: Authors: January 2005 January 2005
TGu Timeline Date: Authors: May 2005 May 2005
TGu Timeline Date: Authors: July 2005 July 2005
Liaison Report from Date: Authors: September 2011
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
TGu Timeline Date: Authors: July 2005 July 2005
July 2013 Opening Report Date: Authors: July 2013
TGp Motions Date: Authors: January 2006 Month Year
May 2012 Opening Report Date: Authors: May 2012
Presentation transcript:

Liaison Report 802.15 to 802.19 Date: 2013-01-17 Authors: January 2013 Notice: This document has been prepared to assist IEEE 802.19. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE 802.19. Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures <http:// ieee802.org/guides/bylaws/sb-bylaws.pdf>, including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the TAG of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair <shellhammer@ieee.org> as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE 802.19 TAG. If you have questions, contact the IEEE Patent Committee Administrator at <patcom@ieee.org>. Hyunduk Kang, ETRI Hyunduk Kang, ETRI

January 2013 Abstract This presentation summarizes 802.15 actions at the January 2013 interim meeting in Vancouver. Hyunduk Kang, ETRI Hyunduk Kang, ETRI

January 2013 802.15.4m 4TV Status (1/4) Updated preliminary Draft for TG4m (doc. # 19-12/0575r1) 4. General Description 5. MAC protocol 6. MAC services 8. General PHY requirements 20. TVWS PHYs Annex S (informative) Ranging considerations for operation in TVWS S.1 Introduction S.2 General S.3 ToA estimation for OFDM PHY S.4 Estimation for FSK PHY Hyunduk Kang, ETRI

January 2013 802.15.4m 4TV Status (2/4) Approved to start a WG Letter Ballot requesting approval forward document #15-12/0575r1, edited in accordance with the instructions in document #15-13/0072r0, to Sponsor Ballot pending the completion and inclusion of the edits in the draft. The WG letter ballot will be started in February 2013. Hyunduk Kang, ETRI

January 2013 802.15.4m 4TV Status (3/4) Finalized coexistence assurance document (15-13/0070r0) Introduction and overview Coexistence with 802.22 Impact of 802.22 on 802.15.4m Impact of 802.15.4m on 802.22 devices Additional Interference Mitigation Mechanisms Coexistence assurance document will be accompanied with the final draft for the WG letter ballot. Hyunduk Kang, ETRI

802.15.4m 4TV Status (4/4) Joint meeting with 802.19 3 Contributions January 2013 802.15.4m 4TV Status (4/4) Joint meeting with 802.19 Presentations on overview and status of 802.19.1 and TG4m (doc.# 19-13/0018r0 and 15-13/0034r0) Discussion on issues regarding TG4m coexistence assurance document 3 Contributions FCC TV Band Update – January 2013 (doc. # 19-13/0028r2) Wi-SUN Alliance Status (doc. # 15-13/0033r0) Effectiveness of windowing: Windowing pulse shaping for IEEE 802.15.4m NB-OFDM (doc. # 15-13/0031r3) Hyunduk Kang, ETRI Hyunduk Kang, ETRI

Future time schedule for 802.15.4m (1/2) <month year> doc.: IEEE 802.15-<15-09-0758-00-004e> January 2013 Future time schedule for 802.15.4m (1/2) Form a New Task Group Affirm new officers for TG4m September 2011 Prepare the TGD November 2011, January 2012 Finalizing the TGD & Call for Proposal March 2012 Proposal Effort Preliminary Proposals & Presentations May 6 2012 Final Proposals July 9, 2012 Proposal Presentations July 2012 Merge Proposals September 2012 Adopt Baseline September 2012 Slide 7 Sangsung Choi(ETRI) 7

Future time schedule for 802.15.4m (2/2) <month year> doc.: IEEE 802.15-<15-09-0758-00-004e> January 2013 Future time schedule for 802.15.4m (2/2) Drafting Review Preliminary draft document November 2012 Complete final draft before WG Letter Ballot January 2013 Prepare Coexistence Assurance Document (CAD) January 2013 Open WG LB for 30 day Posting of TG4m draft February 1, 2013 Letter Ballot Comment resolution March 2013 Balloting 1st Recirculation & Comment Resolutions May 2013 2nd Recirculation & Comment Resolutions July2013 3rd Recirculation & Comment Resolution September 2013 1st SB Recirculation & Comment Resolutions November 2013 2nd SB Recirculation January 2014 RevCom Approval EC approval July 2014 Slide 8 Sangsung Choi(ETRI) 8