Proposal for the DAFNE Variable Energy Design Study

Slides:



Advertisements
Similar presentations
1 The project of Super-ct-factory with Crab Waist in Novosibirsk E.Levichev Budker Institute of Nuclear Physics, Novosibirsk Tau-08 Satellite Meeting,
Advertisements

Page 1 Collider Review Retreat February 24, 2010 Mike Spata February 24, 2010 Collider Review Retreat International Linear Collider.
Linear Collider Bunch Compressors Andy Wolski Lawrence Berkeley National Laboratory USPAS Santa Barbara, June 2003.
Damping ring K. Ohmi LC Layout Single tunnel Circumference 6.7 km Energy 5 GeV 2 km 35 km.
SuperB and the ILC Damping Rings Andy Wolski University of Liverpool/Cockcroft Institute 27 April, 2006.
1 Super-B Factory Scenarios John Seeman Assistant Director PPA Directorate SLAC SLUO Meeting September 11, 2006.
July 22, 2005Modeling1 Modeling CESR-c D. Rubin. July 22, 2005Modeling2 Simulation Comparison of simulation results with measurements Simulated Dependence.
ALPHA Storage Ring Indiana University Xiaoying Pang.
Beam-Beam Optimization for Fcc-ee at High Energies (120, 175 GeV) at High Energies (120, 175 GeV) Dmitry Shatilov BINP, Novosibirsk 11 December 2014, CERN.
2011 Damping Rings Lattice Evaluation Mark Palmer Cornell University March 8, 2011.
The Overview of the ILC RTML Bunch Compressor Design Sergei Seletskiy LCWS 13 November, 2012.
Beam dynamics on damping rings and beam-beam interaction Dec 포항 가속기 연구소 김 은 산.
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
November 14, 2004First ILC Workshop1 CESR-c Wiggler Dynamics D.Rubin -Objectives -Specifications -Modeling and simulation -Machine measurements/ analysis.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Office of Science U.S. Department of Energy Containing a.
Flat-beam IR optics José L. Abelleira, PhD candidate EPFL, CERN BE-ABP Supervised by F. Zimmermann, CERN Beams dep. Thanks to: O.Domínguez. S Russenchuck,
Plan for Review of FCC- ee Optics and Beam Dynamics Frank Zimmermann FCC-ee Design Meeting 31 August 2015.
Damping Ring Parameters and Interface to Sources S. Guiducci BTR, LNF 7 July 2011.
E-cloud studies at LNF T. Demma INFN-LNF. Plan of talk Introduction New feedback system to suppress horizontal coupled-bunch instability. Preliminary.
1 BINP Tau-Charm Project 3 February 2010, KEK, Tsukuba E.Levichev For the BINP C-Tau team.
February 5, 2005D. Rubin - Cornell1 CESR-c Status -Operations/Luminosity -Machine studies -Simulation and modeling -4.1GeV.
Beam Physics Issue in BEPCII Commisionning Xu Gang Accelerator physics group.
Beam-beam Simulation at eRHIC Yue Hao Collider-Accelerator Department Brookhaven National Laboratory July 29, 2010 EIC Meeting at The Catholic University.
2 February 8th - 10th, 2016 TWIICE 2 Workshop Instability studies in the CLIC Damping Rings including radiation damping A.Passarelli, H.Bartosik, O.Boine-Fankenheim,
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
DA  NE: status report M. Preger on behalf of the DA  NE team 22/11/2010.
Workshop on Accelerator R&D for Ultimate Storage Rings – Oct Nov.1 – Huairou, Beijing, China A compact low emittance lattice with superbends for.
Introduction of Accelerators for Circular Colliders 高亮度 TAU-CHARM 工厂 & 先进光源, 2014/09.
HF2014 Workshop, Beijing, China 9-12 October 2014 Challenges and Status of the FCC-ee lattice design Bastian Haerer Challenges.
Please check out: K. Ohmi et al., IPAC2014, THPRI003 & THPRI004 A. Bogomyagkov, E. Levichev, P. Piminov, IPAC2014, THPRI008 Work in progress FCC-ee accelerator.
BINP tau charm plans and other projects in Turkey/China A. Bogomyagkov BINP SB RAS, Novosibirsk.
Experimental considerations about  physics at DA  NE2 F. Anulli, D. Babusci, G. Pancheri Laboratori Nazionali di Frascati  Physics window at DA  NE2.
The project of Super-ct-factory with Crab Waist in Novosibirsk
MDI and head-on collision option for electron-positron Higgs factories
Crab Waist at DAFNE: Numerical Simulations versus Experimental Results
A.Lachaize CNRS/IN2P3 IPN Orsay
(on behalf of the DAFNE team)
Beam-beam effects in eRHIC and MeRHIC
DAFNE experience with compensating wires
Energy calibration issues for FCC-ee I. Koop, BINP, Novosibirsk
Large Booster and Collider Ring
Coupling Correction at the Australian Synchrotron
The Strong RF Focusing:
Design Study on High Luminosity Colliders EUROCRAB submitted to EU-FP7
Status of the VEPP-2000 Collider Project at Novosibirsk
BINP Tau-Charm Project
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
Overview of SRF system of Ring and Linac (1)
Super-B Overview John Seeman Accelerator Systems Division
R. Bartolini Diamond Light Source Ltd
SuperB ARC Lattice Studies
LHC (SSC) Byung Yunn CASA.
M. Tigner, R. Helms, M. Palmer, D. Rubin, D. Sagan Cornell University
Interaction Region Design Options e+e- Factories Workshop
SuperB CDR Machine P. Raimondi for the SuperB Team Paris, May 9, 2007.
Accelerator R&D Results from the B-factory
Electron Rings Eduard Pozdeyev.
CLIC damping rings working plan towards the CDR
WELCOME TO SOLEIL Amor Nadji On behalf of Synchrotron SOLEIL
Summary of Washington DOE Review
M. E. Biagini, LNF-INFN SuperB IRC Meeting Frascati, Nov , 2007
The Lepton colliders Data Base
Proposal for a CESR Damping Ring Test Facility
DANE Compton ring for ultra high flux photons in the 100 KeV-10 MeV energy range D. Alesini (LNF, INFN Frascati)
Status and plans for crab crossing studies at JLEIC
MEIC New Baseline: Performance and Accelerator R&D
MEIC Alternative Design Part V
Crab Crossing Named #1 common technical risk (p. 6 of the report)
Optimization of JLEIC Integrated Luminosity Without On-Energy Cooling*
Presentation transcript:

Proposal for the DAFNE Variable Energy Design Study C. Milardi, D. Alesini, A. Gallo, M. Preger, A. Drago, P. Raimondi, B. Spataro, S. Tommasini, C. Vaccarezza, M. Zobov Accelerator Division. C. Sanelli, A Clozza, Technical Division. D. Babusci, Scientific Division. D. Moricciani, Roma2. 41st LNF Scientific Committee 22 – 23 November 2010

Outline Preamble Proposal Main issues Collaboration Conclusions

Preamble Proposal for the DAFNE energy upgrade, named DAFNE_VE, in the framework of the FP7 call for infrastructures 2011 (deadline 25 November 2010) The idea is not new a letter of intent has been already presented in 2006 for a collider called DANAE DAFNE has been upgraded including a new conceptual approach to the beam-beam interaction, the Crab-Waist collision scheme which was promising to give in principle a luminosity of the order of 1033 cm-2s-1 . The Crab-Waist concept has been successfully tested (L = 4.5 1032 cm-2s-1 ) Since then it is reasonable to consider the Crab-Waist as a basic concept for a variable energy collider. The submission of this project to the European Community is still sub iudice: the INFN management should take a decision in few days (23 November 2010).

Design study strategy 0.6 GeV ≤ ECM ≤ 3.0 GeV The proposed design study is aimed at verifying the feasibility of an electron/positron collider working at variable center of mass energy: 0.6 GeV ≤ ECM ≤ 3.0 GeV providing a luminosity 1032 ≤ L ≤ 1033 cm-2s-1 reusing as much as possible the infrastructure of the DAΦNE accelerator complex in Frascati. Search in the field of high energy physics requires large and expensive infrastructures requiring long time for design and construction. For this reason there is a generalized tendency around the world in reusing as much as possible existing facilities; it is the case for several colliders: BEPC2 in China, VEPP2000 in Russia and Super KEKB in Japan.

Why changing the energy @ DAFNE is not possible? DAΦNE with Crab-Waist achieved quite high luminosity, very close to the experiment requirement for this project, and still there is room for further improvements However due to: The IR based on permanent magnets elements (quadrupoles and dipoles) The injection system RF system specification only minimal variation around the nominal energy are possible -2.% ≤ ECM ≤ +2.% with a progressive luminosity reduction up to a factor two -1.3% ≤ DEcm ≤ 0.7% MeV Lpeak -13. MeV ≤ Decm ≤ 7. MeV

DAFNE layout after the 2007 upgrade Colliding Rings Lattice The ring lattice needs to be flexible from the optics point of view in order to allow a wide range of variability for the betatron functions, emittance, momentum compaction and to guarantee suitable dynamic aperture and lifetime Double ring collider One interaction region based on the CRAB-Waist collision scheme Ring arcs will be redesigned relaxing the long straight sections Wigglers necessary to provide damping, essential for low energy operation, could be moved in the straight section opposite to the interaction region Bending magnets in the arc must be compatible with operation at different energies; a first evaluation suggests that a normal conducting option is feasible DAFNE layout after the 2007 upgrade

Rings can fit in the DAFNE hall B (.5 GeV) ~ 1.2 T B (1.5 GeV) ~ 1.7 T B (0.3 GeV) ~ 0.33 T Magnet type Q (rad) (m) @ 0.51 GeV @ 1.5 GeV L magnetic Sector long 0.7874 1.53 3. 2.3622 Sector short 0.7834 1.27 2.3502 Parallel long 0.86394 1.4 2.5918 Parallel short 0.70686 2.1206 Main Rings Toy-Layout

Interaction Region The interaction region has to meet the different requirements coming from operation at different energies and with different values of the detector magnetic field. It will be based on the Crab-Waist collision scheme The low–b section will be based on superconducting quadrupoles including skew and correction coils to provide betatron coupling and beam trajectory correction respectively The interaction region design must include purpose developed screens to shield the background hitting the experimental apparatus. Their design must be compatible with the vacuum chamber layout and the impedance budget of the rings.

Beam-beam effects Simulations of beam-beam interaction should indicate which ultimate luminosity can be achieved in the upgraded DAΦNE at different energies and help in optimization of the collider performance in terms of lifetime and luminosity in realistic operational conditions. For this purpose we plan: to perform a series of numerical simulations of beam-beam collisions taking into account all kinds of nonlinear lattice elements such as wigglers, sextupoles, octupoles etc. to develop a fast numerical code capable to simulate a self-consistent beam size evolution of both colliding beams (“quasi strong-strong approach”)

Dynamic Aperture Dynamic aperture (area of particle’s stable motion) and energy acceptance are of crucial importance for beam quality and beam lifetime in an accelerator. These are defined by nonlinear machine optics, working point choice and crosstalk between beam-beam effects and lattice nonlinearities. A careful numerical modeling of particle’s motion in the 6D phase space is necessary in order to optimize the collider performance in all the energy range. This item is particularly important for the DAΦNE_VE due to the presence of strong nonlinear CW sextupoles installed in the interaction region.

Radio Frequency The RF system of the rings will provide turn-by-turn restore of the energy lost by the beam due to synchrotron radiation emission and parasitic interaction with the vacuum chamber elements, as well as beam longitudinal focusing. The RF system design study is intended to define the RF frequency value, number and type of RF cavities (including special parts such as input couplers and tuners), number, type and rating of the RF power sources, specifications and structure design of the low-level RF control, how much hardware of the existing infrastructure can be reused and what performance are expected. the beam parameters at the maximum nominal energy define: RF power request (> 100 kW) maximum accelerating voltage low energy will set the design criteria for system stability and low-level control

Impedance and Instability Parasitic beam interaction with the surrounding vacuum chamber can result in several harmful effects: destructive beam instabilities, both single- and multi-bunch, excessive overheating of vacuum chamber components damage of collider diagnostics In order to avoid these phenomena all the new vacuum chamber components will be designed taking care of beam coupling impedance minimization and suppression of parasitic higher order modes.

Bunch by bunch Feedback systems Lepton collider performances in terms of luminosity strongly depend on the maximum achievable beam currents and, in turn, on the bunch-by-bunch feedback systems used to damp both synchrotron and betatron instabilities. The very fast technological advance of the electronic components has also given the opportunity to make more compact and powerful digital feedback systems. Feedback systems have proved to be a powerful diagnostic tool to investigate several aspects related to the instability formation and build up. In the specific case is necessary to evaluate carefully the bunch-by-bunch feedback design in the framework of a complex scenario including different optics layouts and radio frequency setups as well as flexible energy range and injection system schemes.

Injection System Low Energy: Operation below 0.51 GeV poses no problems High Energy operation (above 0.51 GeV) Injection at .51 GeV and ramping in the Main Rings Beam must be dumped at every injection Top-up injection unfeasible Insert a 1 GeV Linac between the Accumulator and the Main Rings The necessity to have a large energy gain per unit length suggests the use of the C-band technology. A bunch compressor is required to confine the bunches in the C-band accelerating crest region to limit the beam energy spread growth during acceleration. Build a slowly cycling 1.5 GeV Synchrotron (≈ 1 Hz) where the particles are stored with multiple pulses at 0.51 GeV, or lower and then ramped up to the desired energy and injected into the Main Rings

Radio Frequency for the Injection System ring RF system for the energy ramping synchrotron option has to be studied and designed, at a frequency lower than the collider rings one to optimize the synchrotron acceptance. Study about the accumulator RF system are also necessary to investigate the feasibility of a different injection option based on a post acceleration in a C-band linac of the beam extracted from the accumulator ring

Vacuum system The design study of DAΦNE_VE vacuum system will address issues concerning the following items: Vacuum chamber design for the interaction region compatible with the detector and the collider requirements. Design of new vacuum chamber for the ring arcs suitable to cope with the higher synchrotron radiation power emission. - Thin film deposition techniques to reduce the vacuum chamber wall secondary electron yield to reduce the positron beam instabilities arising from e-cloud build up.

High precision measurements of the beam energy The measurement of R (ratio of electron-positron annihilation cross section into hadrons to muon pair) requires the knowledge of the energy of the beams circulating in the collider with an accuracy of 50 - 100 keV. A technique to perform a precise measurement of the energy of an electron beam is based on the Compton backscattering of laser photons against the electron beam. A typical experimental apparatus includes: CO2 laser (w0 = 0.117 eV, ∆w0/w0 = 10-7) high-purity germanium detector for energy spectrum measurements

Partners LNF (Laboratori Nazionali di Frascati I) UNILIV (University of Liverpool UK) UU (Uppsala University, Department of Physics and Astronomy SE) BINP (Novosibirsk RU) LNF UNILIV UU BINP Alesini Hock Ruber Levichev Drago Wolski Ziemann Voblyi Gallo Okunev Clozza Shatilov Milardi Piminov Preger Bogomyagkov Spataro Tommasini Sanelli Vaccarezza Zobov Partner expertise fields: Lattice Optics Magnet design High field magnet Beam-beam Beam Dynamics Vacuum System RF Systems Accelerating structure Detector interface Contact with industry

Conclusions The presented R&D activities will lead to: an accurate study for the collider the definition of the costs for its realization the evaluation of its the impact on the existing LNF infrastructures