CHAPTER 3 Engineering Surveying Traversing Survey and Computation By

Slides:



Advertisements
Similar presentations
Traversing 1.
Advertisements

Theodolite: Introduction
The Traverse المضلع Civil Engineering Students Year (1)
TRAVERSING Computations.
ESRM 304: Environmental and Resource Assessment © Phil Hurvitz, KEEP THIS TEXT BOX this slide includes some ESRI fonts. when you save this presentation,
BASICS OF TRAVERSING H.U. MINING ENGINEERING DEPARTMENT
Chapter 4 Traversing Definitions Traverse
Unit 3: Compass survey.
Introduction to Traversing using distances and directions of lines between Traversing is the method of using distances and directions of lines between.
Location and Direction
Horizontal Control Horizontal control is required for initial survey work (detail surveys) and for setting out. The simplest form is a TRAVERSE - used.
E4004 Survey Computations A
Islamic University of Gaza Civil Engineering Department Surveying II ECIV 2332 By Belal Almassri.
CHAPTER 4 Coordinate Geometry and Traverse Surveying
Islamic University of Gaza Civil Engineering Department Surveying II ECIV 2332 By Belal Almassri.
UNIVERSAL COLLEGE OF ENGG. AND TECH.
Traversing Chapter 9.
Surveying I. Lecture 10. Traversing.
BALANCING A GOVERNMENT MEANDER LINE USING STATE PLANE COORDINATES
Coordinate Geometry and Traverse Surveying Faculty of Applied Engineering and Urban Planning Civil Engineering Department Lecture 8 - Week 5 2 nd Semester.
TECHNIQUES IN BASIC SURVEYING
Seventh Edition By David A. Madsen, Terence M. Shumaker, and David P. Madsen Civil Drafting Technology Chapter 7 Location and Direction.
TOPIC 5 TRAVERSING MS SITI KAMARIAH MD SA’AT LECTURER
Islamic University of Gaza Civil Engineering Department Surveying II ECIV 2332 By Belal Almassri.
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall Statistics for Business and Economics 8 th Edition Chapter 9 Hypothesis Testing: Single.
SUBJECT - SURVEYING – I SUB.CODE - CE6304
Chapter 2: Description of position and orientation Faculty of Engineering - Mechanical Engineering Department ROBOTICS Outline: Introduction. Descriptions:
Traverse Computation 1) Calculation of starting and closing bearings;
THEODOLITE SURVEYING THEODOLITE SURVEYING. THEODOLITE SURVEYING THEODOLITE SURVEYING.
2-1 © 2008 Pearson Prentice Hall. All rights reserved Chapter 2 Equations, Inequalities, and Problem Solving Active Learning Questions.
Handled by, R.PRADEEPA, M.E Assistant Professor, Department of Civil Engg, PITS.
Submitted By: Mon Alfred B. Cabia Submitted To: Roberto Cabrera.
Traversing: Theodolite Traverse
Chapter (4) Traverse Computations
Theodolite Traversing Mr. Vedprakash Maralapalle, Asst. Professor
Electric and Electronic Technology Chapter 2D – Kirchhoff’s Laws - KCL
Surveying 1 / Dr. Najeh Tamim
FACULTY OF ENGINEERING TECHNOLOGY AND RESERCH, TAJPORE, BARDOLI CIVIL ENGINEERING DEPARTMENT SURVEYING ( )
PREPARED BY:- GOHIL HASTI P. EN. NO.:
Theodolite: Introduction
Chapter 6 TRAVERSE.
Introduction Theodolite is used to measure the horizontal and vertical angles. Theodolite is more precise than magnetic compass. Magnetic compass measures.
DEPARTURE AND LATITUDE CONCEPT IN SURVEYING
By Scott Hunt and Jonathan Funtanilla
Government Engineering College, Bhavnagar Civil Engineering Third Sem
THEODOLITE TRAVERSING BY S N Nanaware
Engineering Surveying Introduction to Survey Engineering
We have started to compute the traverse station
COMPASS DIRECTIONS (page ).
Chapter 4 – Scale Factors and Similarity Key Terms
Surveying for non-surveyors
Angles and Directions.
Angles and Directions.
Statistics for Managers Using Microsoft® Excel 5th Edition
Local Attraction and Traverse
Angles and Directions.
Surveying With Construction Applications, 7th Edition
Angles and Directions.
Angles and Determination of Direction
Horizontal and vertical angles
Latitudes and Departures
Revise No. II.
Traversing.
TRAVERSING.
Engineering Surveying Curve Ranging
Engineering Surveying Levelling
Engineering Surveying Introduction to Survey Engineering
Chapter 6 Construction Quantity Measurement
Engineering Surveying Linear Survey
CHAPTER 3 Engineering Surveying Traversing Survey and Computation By
Presentation transcript:

CHAPTER 3 Engineering Surveying Traversing Survey and Computation By Mohd Arif Sulaiman Faculty of Civil Engineering & Earth Resources mdarif@ump.edu Introduction To Survey Engineering, by Mohd Arif

Chapter Description Expected Outcomes Able to explain the terminology used in traversing Able to understand the procedure in traverse survey Able to calculate the co-ordinate and all related information using traverse data. References Barry F. Kavanagh, "Surveying with Construction Application", 0-13-048215-3 Pearson, Prentice Halll, 2004. Bannister, Raymond, Baker,"Surveying",0-582-30249-8, Prentice Hall 1998. William Irvine, "Surveying for Construction", 4th  Ed.,0-07-707998-1, McGraw-Hill,1998.

Balancing a traverse It is clear that the closing error should be so distributed throughout the traverse that its effect is as little apparent on the plan as possible. A traverse is balanced by applying correction to latitudes and departures. This is called balancing a traverse. This can be accomplished mathematically, i.e. by applying some rules, or graphically. There are two mathematical rules, which are as follows:

Correction to latitude (or departure of any side) Transit rule Bowditch rule It is also called compass rule. It is used to balance a traverse when the linear and angular measurements are equally precise. It is assumed that the errors in the linear measurements are proportional to √L, where L is the length of the line, and those in the angular measurements are inversely proportional to √L, which questionable. If equal weights are assigned to linear and angular measurements, the errors and hence the corrections are proportional to the lengths of the lines. Correction to latitude (or departure of any side) Transit rule This method of adjusting the consecutive coordinates of traverse is purely empirical and there is no sound theoretical foundation for it. It is employed when the angular measurements are more precise as compared to the linear measurements (theodolite traversing). Correction to latitude (of departure of any side) Refer page 52 Refer page 52

ERROR OF CLOSURE PRECISION

Linear misclosure = 1: 11950

Line Bearing Length Depart ΔE Latitude ΔN Correction Corrected Easting Northing Stn 2   101.100 -10.200 3 85 25 20 175.121 174.562 13.977 0.003 0.002 174.565 13.979 275.665 3.779 4 26 01 30 150.702 66.122 135.421 66.125 135.423 341.790 139.202 5 70 41 20 180.701 170.534 59.757 0.004 170.538 59.759 512.328 198.961 6 355 26 50 75.102 -5.961 74.865 0.001 0.000 -5.960 506.368 273.826 Sum 581.626 405.257 -405.268 284.020 -284.026 405.268 284.026 Error -0.011 -0.006 0.011 0.006 Linear Mis-close 1: 46419

Author Information Dr Idris bin Ali Dr Cheng Hock Tian