Daniel T. Renier President, Twin Cities MPUG

Slides:



Advertisements
Similar presentations
Microsoft Project Notes Amir. Tasks Types Fixed Unit tasks – Unit refers to assignment Units as percentages. A resource can be assigned to a task 100%
Advertisements

MS Project.
1 Project Management – Part 2 Yale Braunstein School of Information Management & Systems UC Berkeley.
Project Management NC STATE UNIVERSITY Julie Earp BUS/CSC 516 Fall 2003.
LSU 10/09/2007Project Schedule1 The Project Schedule Project Management Unit #4.
Chapter 11 - Project Management ME101 Dr. Nhut Tan Ho 1.
Microsoft Office Project 2007: Managing Projects.
Project Management Software Tools Cheryl A. Wilhelmsen Lee Ostrom.
Understanding Microsoft Project: Behind the Scenes Presented by Genea Mallow, PMP Director of Education, MPUG Senior Consultant, Milestone Consulting Group,
 Probably the most time-consuming project management activity.  Continuous activity - Plans must be regularly revised.  Various different types of.
1 Managing Resource Utilization using Microsoft Project Leveling Presented by Larry Christofaro, PMP, MCITP February 29, 2008.
BSBPMG503A Manage Project Time Manage Project Time Unit Guide Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG503A.
Advanced Scheduling In MS Project Provided by FrontRange MPUG.
Software Project Management Lecture # 7. Outline Project Scheduling.
TA. MARAM AL-KHAYYAL NET481 MS Project Overview. Outline Introduction to project management.  Project 2007 can help you manage project time, resources,
Project Management & Microsoft Project. MS Project Task Types n nFixed Units, Fixed Duration, Fixed Work n nUsed to calculate duration of tasks and subsequently.
Creating Effort Driven Schedules.  Objectives Understanding Your Job and the Tools Job Understanding Task Types Six Steps to an Effort Driven Project.
BIS 360 – Lecture Two Ch. 3: Managing the IS Project.
Software Project Management With Usage of Metrics Candaş BOZKURT - Tekin MENTEŞ Delta Aerospace May 21, 2004.
IS 556 Enterprise Project Management 1IS 556 -Spring 2008 Lecture 2 Apr 7, 2008 //48.
Microsoft Project 2007 Class Schedule of Topics. Topics Day 1 Review of MS Project Basics 1:00 – 1:30 Constraints 1:30 – 2:15 Dead Lines 2:15 – 2:30 Identify.
Nadie pone en oculto la luz encendida, ni debajo del almud, sino que en el candelero, para que los que entran vean la luz. San Lucas 11: 33 RVR 60.
Project Schedule PLAN IT!. Project Schedule Project Schedule is based on Work Breakdown Structure (WBS) Define the WBS correctly or the Project Schedule.
Title of presentation goes here Name of presenter Location/date © 2005 MPA. All rights reserved. Presents – MS Project Resource Mgmt Genea Mallow-Jensen.
MS Project Tips & Tricks Presenter: Natalie Wieland PMP, MCSD, MCDBA, OCPDBA, MCT.
Software Engineering 1 The Life Cicle of Software Lesson 4.
Estimating Schedule Durations Using MS Project PERT Analysis Tool Presented by Harry Smith MPUG St. Louis Chapter Member February 9,
CS-411W VII – Resource Planning and Allocation. Definition Resource – any person, item, tool, or service that is needed by the project that is either.
Microsoft Project User Group May 2002 – Chapter Meeting Scheduling - Best Practices Initiation and Planning Presented by James Nuthall Brentford Technologies,
© 2008 Sterling Commerce. Confidential and Proprietary. How to Get Along with Project Using Microsoft Project so that it actually works for you, not against.
Copyright 2003 Lynn Frock & Company. All Rights Reserved. 1 Five Ways to Build a Microsoft Project Schedule Lynn Frock, PMP Phone
MS Project 2000 / 2003 Luke E. Reese Biosystems and Agricultural Engineering September 17, 2009.
Initiation and Planning for Success Sridhar Seshagiri Rao, PMP Innova Solutions Inc. Santa Clara, CA. April 9 th 2004.
Assignment-Level Tracking Field Calculations in Microsoft® Office Project Kelly Jones PMO Manager, Information Systems Sharp Healthcare.
A Recipe for Preparing a Schedule that Works Ulla Merz prepared for MPUG phone: (303)
Microsoft Office Project 2003: A tour of the EPM Solution.
Project Scheduling Class 7.
MARCH 1 Project Management Problem statement l no hurdles, no problem just a goal l open-ended … no single correct answer l closed-ended … single answer.
Microsoft Project 2010 ® Tutorial 4: Assigning Resources and Costs.
Microsoft Project 2010 ® Tutorial 5: Tracking Progress and Closing the Project.
MS Project Tips and Tricks November 4, 2008 PMI-SVC Scheduling Forum.
HCIS 410 Read, Lead, Succeed/Uophelpdotcom For more course tutorials visit
IT-301 Project Management I: Unit 4: Cost Management.
CIS 170 MART Teaching Effectively/cis170mart.com FOR MORE CLASSES VISIT HCIS 410 AID Inspiring Minds/hcis410aid.com FOR MORE CLASSES.
1 Schedule Control with Microsoft Project 2003 P roject M anagement M ethodologies Laura Williams, PMP.
Best Roofing Companies in Woodbury, MN
Project Management for Treasury Professionals
Project Management.
Microsoft Project 101: How to Build a Project Plan
Scheduling Resources and Costs
Project management for working professionals
HCIS 410 PAPER Lessons in Excellence - - hcis410paper.com.
HCIS 410 ASSIST Education for Service- -hcis410assist.com.
HCIS 410 Education for Service-- tutorialrank.com
In this tutorial you will:
In this tutorial you will:
Chris Rimple Project Expert Team
Resource management Chapter 12 Copyright ©2016 Pearson Education, Inc.
Project Management Metrics
Project Management © 2004 D. J. Foreman.
Бази от данни и СУБД Основни понятия инж. Ангел Ст. Ангелов.
LAMAS Working Group December 2013
Project Management © 2004 D. J. Foreman.
SpecialServices Teacher What’s New in 16.2
Project Management © 2008 D. J. Foreman.
Contact Us 5123 W 98th St, Suite 1033, Minneapolis, MN, Excellent Webworld +1-(480)
Enterprise Project Management with Microsoft Office Project 2003
Setting Up a Resource Pool
Scheduling Resources and Costs
Presentation transcript:

Daniel T. Renier President, Twin Cities MPUG Fixed Duration: Obvious and Not So Obvious Characteristics of Fixed Duration Daniel T. Renier President, Twin Cities MPUG Twin Cities MPUG: Minneapolis and St. Paul, MN

Agenda Activity Duration Estimating Fixed Duration: a Definition Obvious Characteristics Not so Obvious Characteristics Questions / Answers Twin Cities MPUG: Minneapolis and St. Paul, MN

Activity Duration Estimating Popular Task Level Scheduling Technique PMBOK Definition Page 67 (76 of 211) (6.3) in the PMBOK Twin Cities MPUG: Minneapolis and St. Paul, MN

Fixed Duration: a Definition A task in which the Duration is a fixed value and any changes to the work or the assigned units don’t affect the task’s duration Twin Cities MPUG: Minneapolis and St. Paul, MN

Obvious Characteristics Duration is Fixed The duration of the task is fixed; therefore, Microsoft Project will do its best to maintain the fixed duration value Twin Cities MPUG: Minneapolis and St. Paul, MN

Obvious Characteristics Schedule is Set An activity duration estimate sets the schedule Twin Cities MPUG: Minneapolis and St. Paul, MN

Not so Obvious Characteristics Fixed Duration (Does not mean Fixed Dates) Fixed Duration is not a Constraint Twin Cities MPUG: Minneapolis and St. Paul, MN

Not so Obvious Characteristics The Fixed Duration Value can Change Splits can force a change Fixed Duration and Effort Driven Tracking can force a change Twin Cities MPUG: Minneapolis and St. Paul, MN

Not so Obvious Characteristics Fixed Duration vs. Fixed Units and Fixed Work Splits and changes in duration Project calendar Twin Cities MPUG: Minneapolis and St. Paul, MN

Not so Obvious Characteristics Grids Behavior: Fixed Duration Fixed Units and Fixed Work Scheduling: work is distributed in an Fixed Duration manner Twin Cities MPUG: Minneapolis and St. Paul, MN

Summary Fixed Duration: Activity Duration Estimating Fixed Duration: a Definition Obvious Characteristics Not so Obvious Characteristics Twin Cities MPUG: Minneapolis and St. Paul, MN

Questions and Answers Twin Cities MPUG: Minneapolis and St. Paul, MN

Additional Sources of Information Online www.mpug.org In person MPUG Meetings MPUG/PMI Workshops Twin Cities MPUG: Minneapolis and St. Paul, MN