REFORMA ESTADIO EL MOLINÓN

Slides:



Advertisements
Similar presentations
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Advertisements

Your Partner in Developing Nigeria
Dr. Otto to Twenty 1 Middle East
Acoustics 5 Materials Rino D.A. Fernandez, uap Class Instructor.
Innovative New Technologies in Building & Construction.
BPB TROPHY 2006 – PLASTER Jury Presentation Plaster.
Prof. Dr. Ramdan Abdel Maksoud Pharos University Faculty of Engineering Architectural Department.
Energy Environment & Sustainable Development Thematic Network on Energy in the Built Environment Thematic group 5 : Building Components (including windows.
BAE SYSTEMS DESIGN PROJECT: DAYLIGHTING TECHNIQUES/ AFTERNOON DE-”LIGHT” EDSGN 100 Sec. 6 Team 3: David Young, Robert Vadella, Victoria Rodriguez, Phil.
Sapphire INTERIOR DESIGN – PROJECT MANAGEMENT – MAIN CONTRACTORS COMPANY PROFILE Head Office:- Sapphire House, 18 Gladstone Road, Croydon, Surrey, CR0.
The Versatile Solution For Any noise problem ACOUSTIC PANELS.
CURRENT STATE NARRATIVE… Knight Management Center Lecture Hall.
Knight Management Center Lecture Hall GRADUATE SCHOOL of BUSINESS Knight Management Center Lecture Hall – Esther Kweon – Desirae Magallon – – David Park.
From Design to Construction: How to Maintain Control of Your Lighting Design Avraham M. Mor, LEED AP, IESNA, A. IALD Partner, Lightswitch Architectural.
Effective Methods for Software and Systems Integration
 Real Estate Clerk – performs clerical duties at a real estate office  Real Estate Broker - attempts to find sellers who wish to sell and buyers who.
 Fairview Health Services › Minnesota health care system › 7 Hospitals and 50_ Clinics  Carlson-LaVine Construction › Twin Cities based commercial construction.
AE 321 Design Details (2) Prof.Dr. Tarek Saad Pharos University In Alexandria Faculty Of Engineering Architecture Department.
The Hamptons Interior Design Course A Introduction to Interior Design.
L/O/G/O SuccessfulConsultantTraining The 4-Part SCT Framework For Becoming a Technical Consultant Part 1: How to Become a Technical Consultant Fast! Part.
DESIGN-BUILD The Culture of Builders The “Design–Builder" is typically a general contractor. Some design–build firms employ professionals from both the.
Bathrooms Over $50,000 McDonald Remodeling, Inc..
How eNet4S can benefit your project? eNet4S Software Solution Business Team Chief Technology Officer July 11, 2006.
Yellow Team Sketch Models Living and Working in Constrained Space.
ARC 810: Building Climatology Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 810: Building Climatology Department of.
A R C H I T E C T S E M I N A R WEBER+THOMPSON Founded-1987 B.Arch: University of Hawaii Studied under Jorn Utzon and Arata Isozaki Chairman of Washington.
Pay attention as I present pay attention as I present slide layout and content slide layout and content pacing pacing references to book (or not) references.
The answer to all your cleaning needs. Versatex is an established cleaning company since 2002 with active participation from our director F. Clarke. We.
David A. Bainbridge Rachel Aljilani
Loft Conversions Bringing you the latest in sprayfoam insulation technology.
Announcement: The Course Test is Net week ! On Wednesday, October 12 It starts at 1 pm sharp.
Building Environmental Systems
ABOUT US We Decor Enterprise are one of the leading manufacturer of False Ceiling Systems, Gypsum Board, Decorative Ceiling in Kolkata. We offer premium.
Al-Midra Tower.
Headings – Arial Rounded MT Bold – min font size 16
LIGHTRUSS Size 2 LED.
Headings – Arial Rounded MT Bold – min font size 16
Performance-driven solutions for tomorrow’s heavy haul world
Interior Design Considerations.
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Renovation remodeling house repairing company
INTD 503- Materials Topic: ceilings
Performance-driven solutions for tomorrow’s heavy haul world
Welcome to Haberfield Holdings
Backgrounds and plaster
Risk Management Practice (Case study: Sydney Opera House)
Austria Erste Campus Lieb Bau Weiz GmbH.
TG-1101 Engineering Design I Introduction to “Total Design” and “Systems Engineering Design Process” (Week 2)
Al Dhabi For Contracting
SERBIA NATIONAL MUSEUM ALP inženjering.
STAZIONE ALTA VELOCITÀ NAPOLI-AFRAGOLA
MONTENEGRO HILTON HOTEL CD inženjering.
Applied Sciences building Delft Technical University
Minuteman Vocational Technical Regional High School Progress
PLASTERBOARD CATEGORY
Alamdar Innovations Crafted with Perfection
PLASTERBOARD CATEGORY
BELGIUM COND’OR Batilook.
Quartier 23. Haus im Stadtpark
CANADA ST. MARY & ST. SAMUEL COPTIC ORTHODOX CHURCH Smith Brothers Contracting Corp.
HOLY NAME OF JESUS CATHEDRAL
Jaeger Ausbau GmbH + Co KG Zwickau
Austria Millennium Tower Baierl & Demmelhuber Innenausbau GmbH.
Daylight Redirecting Window Film
Campagnola Geom. Giorgio Costruzioni Generali srl, Verona
CANFRANC INTERNATIONAL RAILWAY STATION RESTORATION
© 2016 Global Market Insights, Inc. USA. All Rights Reserved Global Ceiling Tiles Market 2019 By Regional Trend & Growth Forecast To.
SERBIA HUTCHINSON R inženjering.
Buildmat Sales Pvt Ltd (TTPL Interiors Projects Pvt Ltd)
CENTRO DIREZIONALE VIA DELL’ARTE Coiver Contract Centro srl
Presentation transcript:

REFORMA ESTADIO EL MOLINÓN SPAIN REFORMA ESTADIO EL MOLINÓN GOEN AISLAMIENTOS

Project Details Building Type Building Size Project Dates Saint-Gobain Stadium Building Size 568 m² Project Dates 07/2016 – 01/2017 Saint-Gobain Products & Systems Rigitone ceilings Habito Pasterboard 4PRO Plasterboard Ceramic Placostic

Reforma Estadio el Molinón, Gijón Contractor Company Name Goen Aislamientos Main Representative Mr. Hector / Mr. David Gonzalez Encina Company Size 5 employees Specialised in Plasterboard Installation

Reforma Estadio el Molinón, Gijón Building Owner Architect Contractor Innovation Partners Saint-Gobain Project Manager Real Sporting de Gijón José Ramón Fernandez Blanco Goen Aislamientos Name Name Sales team

Reforma Estadio el Molinón, Gijón The project consists on a remodelling carried out in the Molinón Football Stadium in several of its spaces. ( new official store, press room, TV sets and changing rooms). Each of this spaces requires specific needs which have been solved with different PLACO® systems. Sample text (high level project pitch) STRANDBADKIRCHBICHL is a visionary design project involving the construction of a new office building in a remote mountain region of Austria, with a design which reflected the crashing waves coming in from the nearby beach. Great technical skill and knowledge of interior systems was required in order to optimize lighting, acoustics and sound absorption within a very complex curved shaped structure which would not naturally provide this level of performance. This presentation will also be used on the book and on the website to present your project.

Reforma Estadio el Molinón, Gijón

Reforma Estadio el Molinón, Gijón TV sets have been solved with a good combination between our Rigitone® and Gyptone® ceilings. It has been used Rigitone® 8/18 model on walls and Gyptone® Big Line 6 model in ceilings. The result is rooms with good aesthetics qualities and acoustic comfort.

Reforma estadio el Molinón, Gijón Press room has been solved with Habito Systems to hang the television monitors without problems.

Reforma estadio el Molinón, Gijón In other ceilings has been used 4PRO plasterboard due to the importance of plasterboard finishing when it is exposed to indirect lights.

Reforma estadio el Molinón, Gijón In other areas of the Molinón Stadium have been used moisture plasterboard due to the demands on wetness.

Reforma estadio el Molinón, Gijón During the official store remodelling, it has been necessary to use ceramic Placostic® to cover the old surfaces with ceramic tiles.

Reforma Estadio el Molinón, Gijón Key challenges . The use of different Placo® solutions in the same spaces and installed by same installer. Sample text Acoustics and light are the dominating elements in this project. The challenge was to allow maximal use of natural daylight using an unusually large funnel and integrating artificial lighting to complement natural light. The design however also had to provide an excellent level of acoustic performance in a challenging large open plan structure with high windowed ceilings. In addition to a combination of acoustics, sound absorption and light, there was particular emphasis on architecture and functionality through to the final finishing coating (Q4 surface quality) in order to meet the rigorous project standards.

Reforma Estadio el Molinón, Gijón Main Saint-Gobain products and systems used Air quality and Aesthetic & acoustic insulation / Rigitone 8/18- High performance Press room https://www.placo.es/es/products/rigitone/rigitoner Load capacity & impact resistant/ HABITO- High performance https://www.placo.es/es/products/placa-habito/habitor Good finishing & jointing resistant / 4PRO- High peformance Official store https://www.placo.es/es/node/3126 Finish quality & good adhesion / Ceramic Placostic – High performance Changing rooms https://www.placo.es/es/systems/soluciones-de-plastes/placosticr-ceramico Key achievements?

Reforma Estadio el Molinón, Gijón Key achievements The use of Rigitone on walls as it is not a frequent solution. The use of the multiple Placo® solutions and the good combination between its. Sample text Project delivered to challenging budget and time schedule Discussion throughout the process with the architect to optimize each design phase. Final result combines high standards for design / aesthetics, acoustic comfort, and optimal levels of natural daylight.

REFORMA ESTADIO EL MOLINÓN SPAIN REFORMA ESTADIO EL MOLINÓN Goen Aislamientos – José Ramón Fernandez Blanco José Manuel García Bailón Photography Credits: Name Surname