The Form of Procurement for the EcoHome Project

Slides:



Advertisements
Similar presentations
© Graham M Winch III : Mobilising The Resource Base1 III : Mobilising the Resource Base mobilising the resources required to deliver the project mission.
Advertisements

Construction Project Coordination Presented by: Philip H
Construction Contracting
CO-OPERATION IN CONSTRUCTION SECTOR CONSTRUCTION CONTRACTS Dr. Judit Gyulay – Dr. Zoltán András Vattai BUTE Department of Construction Technology & Management.
A Match made in Heaven? Connecting you with a builder.
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
Phase Difference = Phase Difference = 0.05.
Contract strategy Traditional ApproachIncreasing Traditional ApproachIncreasing Accelerated Traditionalintegration Accelerated Traditionalintegration.
Information Systems in Basic concepts of construction industry by Prof.Dr. Alaattin KANOĞLU I.T.U. Faculty of Architecture Spring Construction Projects.
Risk management. Berliner Energieagentur GmbH Risks of EPC Equipment transfered into the property of building owner at the moment of installation and/or.
FIDIC CONFERENCE 2005, BEIJING Workshop 13 Design & Build - Role of Consulting Engineers in the Tender Process Tse Yau Shing.
Honoraria for Design Build Projects Methodology Assessment Matrix.
Bridge Engineering Section Bridge Rehabilitation.
Chapter 42 Construction Specifications. 2 Links for Chapter 42 Introduction Construction Specifications Construction Documents.
ITS Procurement Workshop Module 2: ITS Procurement Characteristics and Challenges.
CONSTRUCTION CONTRACTS PRIME CONTRACTS Format and Major Components CHAPTER - 4.
Lecture #2: The Design and Construction Team Professor: Robert Powell, AIA TA: Matt O’Brien, AIA August 20, 2008 AREN 231: Methods and Materials.
CCG Strategy Review Workshop Procurement Theme Group Charles Mills April 30 th 2015.
Chapter 2 Introduction to Construction Procedures
Documentation David M. Shapiro David M. Shapiro Disaster Planning and Recovery Consultants 4030 Wake Forest Road, Raleigh NC Tel: (919)
Renew School – WP 3 Cooperation models, Geier, Toolbar – Actions Architect The color of the field indicates the activity group of the respective.
INFORMATION Information Packs, Construction Phase Plans and Health and Safety Files.
The Projects Side Steve Berezansky OSFC Chief of Projects.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Atlantic Connection 2011 Roundtable Discussion Public Private Partnerships: What's in it for my Government?" 6th Annual Economic & Financial Development.
Construction “Meet & Greet” Tuesday, July 24, 2012 Purchasing / Facilities Management.
7 April, 2008 Bernard Longhi / TBG6 / TBG6 (AEC Gp) Architecture – Engineering - Construction Chair: Bernard Longhi.
Development through partnership Infrastructure Delivery Management Toolkit: 2010 Edition Delivery Process 2: Project Management 1.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Risk Management in the Built Environment Management of Risk in Construction By Professor Simon Burtonshaw-Gunn – licensed under the Creative Commons Attribution.
BCN 4708 Fall 2008 Chapter 1 The Construction Industry.
The Design/Build Contract. What Is A Design/Build Contract? Contract that combines design & construction into one agreement The design/build team provides.
Keith Roberts, P.E. Project Implementation Engineer IDOT – District 9.
Construction Management At Risk Process
FINAL PROJECT 7TH SEMESTER ARCHITECTURAL TECHNOLOGY AND CONSTRUCTION MANAGEMENT M ARTA G AGO P ENALBA PROJECT : 32 DWELLINGS IN VEJLEVEJ.
Construction Documents Drawings Specifications Bid documents Construction Sketches and other data.
KIMBERLY FRELOW SMALL BUSINESS MANAGER LORRIE MUÑOZ PROGRAM COORDINATOR Los Angeles Unified School District Small Business Enterprise Program.
Contract and Tender form Phases of Designing Phases of Implementation VIA / TCU 4th semester workshop S2016 Contract and Tender form S2016 VIA University.
“A Contractor’s Perspective” John Kilgour - CEO 21 April 2016.
Construction Tender Process Tender steps between Client, Contractor and Subcontractor Dr A Kimmance.
ORIO Project Plan Procurement Bas Schilperoort Opening slide.
Los Angeles Unified School District Small Business Enterprise Program
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
The project's conception: A feasibility study is done
Awarding Criterion for late tender: the lowest bid- why?
Awarding Criterion for late tender: the lowest bid- why?
Pre-contract Planning and Practice
تاكيد بر اجراي قراردادهاي EPC
بازاریابی و بازرگانی زمستان 93.
Planning is a critical success factor
The Documents Necessary for Tendering a Project for Bids:
The Documents Necessary for Tendering a Project for Bids:
Veterans Federal Procurement Opportunities
Shed exercise VIA / TCU 4th semester workshop S2016
Supplementary Services Project Management Services.
Norfolk Constructing Excellence Awards 2016
Back Ground Information
The project´s specifications, and the connection between the contract´s different specifications.
TCU-PROJECT: 7TH Semester Course
Lecture 10 PROCUREMENT Ferdinand FASSA.
Contract and tender form Phases of designing Phases of implementation

Best Practices of Project Tendering and Delivery
Project delivery RIBA stages Define design deliver Key Objectives 1 2
AWARD OF CONTRACT (AOC)
6th. Semester Schedule: 1st. Week
FIVE PROJECT PHASES.
Huntsville High School Softball Program Upgrades
For More Details:
Honoraria for Design Build Projects Methodology Assessment Matrix
Presentation transcript:

The Form of Procurement for the EcoHome Project A excerpt from the EcoHome project´s Design Brief:

PRIME (MAIN) CONTRACTS THE DEVELOPER OF THE ECOHOME PROJECT WANTS 100% INFLUENCE ON THE DESIGN FORM OF PROCUREMENT: TRADITIONAL TRADE CONTRACTS OR PRIME (MAIN) CONTRACTS Project tender on basis of Client´s architect´s 100% detailed project: Contractor has no influence on design PROGRAMMING (THE BRIEF/TOR) SCHEMATIC DESIGN DESIGN DEVELOPMENT DETAIL DESIGN : DRAWINGS/TENDER DOCS. BIDDING PHASE CONSTRUCTION PHASE OPERATION &MAINTENANCE PHSE

PRIME (MAIN) CONTRACTS Invitation to tender for either a main contractor, or individual trade contract TRADITIONAL TRADE CONTRACTS OR PRIME (MAIN) CONTRACTS DETAIL DESIGN : DRAWINGS/TENDER DOCS. Invitation to tender to each individual contractor Invitation to tender to Main Contractor only!