Laser Und XFEL.EU Experiment

Slides:



Advertisements
Similar presentations
SINBAD Ralph W. Aßmann Leading Scientist, DESY LAOLA Collaboration Meeting, Wismar
Advertisements

Friday 28 th April Review of the aims and recommendations from the workshop L. Rinolfi.
CERN First Considerations to implement nuSTORM on the CERN site “North Area Neutrino Hub” E.Wildner, CERN Wednesday, March 27, 2013Elena Wildner,
Positron Source Update Jim Clarke Deepa Angal-Kalinin James Jones Norbert Collomb At Daresbury Laboratory and Cockroft Institute 21/07/2009.
Nick Walker KEK-DESY meeting 7 th March 2005.
Upcoming Review of the Hall D Photon Beam and Tagger Richard Jones, University of Connecticut, for the GlueX collaboration GlueX Collaboration Meeting.
September 15th 2009Olympus technical review at DESY, F.Brinker1 DORIS storage ring Olympus in the IP-region Beam optic, changes on the lattice Beam dimensions,
Richard M. Bionta XTOD October 12, 2004 UCRL-PRES-XXXXX X Ray Transport, Optics, and Diagnostics, Overview Facility Advisory Committee.
NLC - The Next Linear Collider Project  IR background issues and plans for Snowmass Jeff Gronberg/LLNL Linear Collider Workshop October 25, 2000.
European Design Study Towards a TeV Linear Collider WP 2 : Beam Delivery System Co-ordinator: Deepa Angal-Kalinin CCLRC, Daresbury Laboratory.
AS Diagnostic Collaboration Mark Boland
XFEL Project Overview R. Brinkmann, DESY S2E Workshop, Zeuthen, Aug. 18, 2003.
ILC BCD Crossing Angle Issues G. A. Blair Royal Holloway Univ. London ECFA ILC Workshop, Vienna 14 th November 2005 Introduction BCD Crossing Angle Rankings.
Keith O. Hodgson SSRL Director Brief Update on the Linac Coherent Light Source - LCLS February 26, 2002 Basic Energy Sciences Advisory Committee Undulator.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Date Event Global Design Effort 1 ILC UPDATE Vancouver to Valencia Ewan Paterson Personal Report to SiD Collaboration Oct 27, 2006.
Winni Decking XFEL Beam Collimation and Switchyard Review Introduction FEL-Beam-Dynamics Group
CesrTA Experimental Plan M. Palmer for the CesrTA Collaboration November 17, 2008.
1 Tunnel implementations (laser straight) Central Injector complex.
Free-Electron Laser at the TESLA Test Facility More than 50 institutes from 12 countries are involved in the TESLA Project The TESLA Collaboration: Three.
BDS Andrei Seryi, Deepa Angal-Kalinin, Emmannual Tsesmelis, Rogelio Tomas, Andrea Latina, Daniel Schulte Detectors Civil engineering.
Nick Walker – SA meeting KEK Treaty Points and Costing Guidance Nick Walker 1 st System Area Managers Meeting KEK –
Accelerator Science and Technology Centre POST-LINAC BEAM TRANSPORT AND COLLIMATION FOR THE UK’S NEW LIGHT SOURCE PROJECT D. Angal-Kalinin,
Max Cornacchia, SLAC LCLS Project Overview BESAC, Feb , 2001 LCLS Project Overview What is the LCLS ? Transition from 3 rd generation light sources.
Perspectives of imaging of single macromolecular complexes at the European XFEL Evgeny Saldin.
SABER, “maybe” a new facility in the South Arc (South Arc Beam Experimental Region) End Station A (ESA) in 2007 ILC Test Beams in 2008 Test Beams beyond.
Accelerator Science and Technology Centre POST-LINAC BEAM TRANSPORT AND COLLIMATION FOR THE UK’S NEW LIGHT SOURCE PROJECT D. Angal-Kalinin,
International Linear Collider at Stanford Linear Accelerator Center 9/13/2006 Americas Regional Team FY08-09 Planning Meeting 1 1/11 ILC-Americas FY08-09.
11/15/20051 Radiation Protection Issues for ILC (not exhaustive) A. Fassò, N. Noriaki, H. Vincke Radiation Physics.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
DESY. Deutsches Elektronensynchrotron Introduction of DESY and MKK group Jens-Peter Jensen Asset and Maintenance Management Workshop 2013 Genf,
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
29/10/09 Positron Workshop 1 Working Assumptions for Low Energy Operations Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory.
COMET Task Force 16/Oct/2008 J-PARC PAC meeting Satoshi MIHARA.
Positron Source Report Jim Clarke STFC Daresbury Laboratory/Cockcroft Institute.
FHI experimental opportunities? FHI meeting 17/9/14.
July 11, 2008M Ross for PM - ILC GDE - ILCDR08 closeout 1 GDE Program for the ILC Technical Design Phase Marc Ross for: Akira Yamamoto, Nick Walker GDE.
1 Positron Source Configuration Masao KURIKI ILC AG meeting at KEK, 2006 Jan. Positron Source Configuration KURIKI Masao and John Sheppard  BCD Description.
FCC-ee Interaction Region design
Layout Daniel Schulte for the FCC-hh teams ALBA, November 2016.
CALIFES A proposed electron beam test facility at CERN
CLIC Civil Engineering Update
MSc-Student Activities at the European XFEL
Introducing European XFEL Enlightening Science
LLRF'15 Workshop, Shanghai, Nov. 4, 2015
Options and Recommendations for TL and Dumps
Integration Ideas for the Central Region Some old some new
Hosting Orsay Walid KAABI
M.Jonker CTC MPO-WG status
R&D Topics for FOA Funding Proposals
Accelerator and Experiment Interface Session: LS2, LS3
Ralph Aßmann (DESY) 2nd collaboration week November 24th, 2017, Lisbon
CLIC-ILC BDS & MDI work.
Future Collider Projects at CERN
nuSTORM and the Physics Beyond Colliders workshop
AD & I : BDS Lattice Design Changes
Schedule and Priorities 2018 / 2019
Eric Boyd SRP XHEXP1 Meeting 29,09,2017
MACHINE DETECTOR INTERFACE WORKING GROUP STATUS
Accelerator Layout and Parameters
LCLS-II-HE FEL Facility Overview
XFEL Project (accelerator) Overview and recent developments
LCLS Linac Update Brief Overview L1 & BC1 Progress LTU & E-Dump Status Continuing Resolution Impact.
LCLS-II-HE FEL Facility Overview
Diagnostics overview and FB for the XFEL bunch compressors
Linear Collider Positron Source and Central Integration Update
SLHC-PP kick-off meeting, CERN 9 April 2008
LCLS Linac Overview E. Bong Lehman Review August 10, 2004
X-Ray Transport, Optics, and Diagnostics WBS Alan J
LCLS Photon Systems Overview
Presentation transcript:

Laser Und XFEL.EU Experiment The LUXE experiment Laser Und XFEL.EU Experiment Florian Burkart (MPY1) for the LUXE collaboration XFEL Machine Advisory Committee Hamburg, 07/11/2018

General layout Experimental Area Hall Kicker & Septa Dipole 1bunch Experimental Area Hall Triplet 17.5 GeV e− Linac Dipole Dump Kick out one bunch and send it to the experimental area. | F. Burkart | XFEL MAC | LUXE

Electron - Laser Collision Triplet Laser pulse IP Mirror γ Dipole PDET EDET E < 16 GeV e− e+ γCAL CAL Dump ~5 m ~ 20 m electrons tbd ~15 m | F. Burkart | XFEL MAC | LUXE

Photon - Laser Collision Collimation Triplet Photon converter Dipole Counter E < 16 GeV e− e+ γ Laser pulse Mirror PDET EDET Dump 5 m 15 m 10 m tbd IP γCAL Dipole e+ e− γ CAL electrons | F. Burkart | XFEL MAC | LUXE

General infrastructure requirements for LUXE Electron beam line (~ 60 m) Magnets (Fast kickers, septa, triplet, spectrometer) Beam instrumentation Collimator Single bunch beam dump. Space for 150 sqm Laserlab Laser and laser transport Detectors General infrastructure: Crane, power, water cooling, ventilation, IT Shielding Integration into XFEL Control and MPS system | F. Burkart | XFEL MAC | LUXE

Possible location at the XFEL HED MID FXE SPB SQS SCS SASE 1 3 – 24 keV SASE 2 SASE 3 0.26 – 3 keV photon tunnel electron bend undulator electron dump electron tunnel electron switch experiments LINAC 17.5 / 14 / 10.5 GeV ~ | F. Burkart | XFEL MAC | LUXE

Picture of XS1 Electron beam lines XTD20 Dump line | F. Burkart | XFEL MAC | LUXE

XTD20 during construction (2014) Crane shaft Media shaft Dimensions: 4.5 x 4.3 x 61 m | F. Burkart | XFEL MAC | LUXE

CAD Modell XTD1 XTD2 XTD20 | F. Burkart | XFEL MAC | LUXE

Possible location at the XFEL HED MID FXE SPB SQS SCS SASE 1 3 – 24 keV SASE 2 SASE 3 0.26 – 3 keV photon tunnel electron bend undulator electron dump electron tunnel electron switch experiments LINAC 17.5 / 14 / 10.5 GeV ~ | F. Burkart | XFEL MAC | LUXE

XSDU1 | F. Burkart | XFEL MAC | LUXE

XSDU1 dump cavern | F. Burkart | XFEL MAC | LUXE

Location Considerations XSDU1 Modification of beam line – downtime to be evaluated. Potential impact on legal situation (additional extraction/beam dump, beam line)  plan-approval procedure. Maybe radiation towards XTD7  additional shiedling required. New building at the surface. Background from beam dump. Already studied (optics, HW, …). XTD20 Uses existing building and beam line design. Major modification of extraction beam line - downtime to be evaluated. Extraction and beam line already included in plan- approval. Laser beam line transport via XS1 shaft. Early implementation of the beam extraction for future XFEL upgrade and/or test beam area. Additional demonstration of the flexibility of the facility. New option to be studied. | F. Burkart | XFEL MAC | LUXE

Timeline and Outlook First discussions with XFEL Directorate, Directorate supportive. DESY directorate supportive. Design study strongly supported via DESY strategy fund. Funding received for laser development from Helmholtz Innovation pool. Application for EU funding (ERC synergy grant, 14M€) foreseen next year. Main challenge: Fit construction into XFEL schedule - under investigation. Next steps: decide on location, preparation CDR, evaluate modification schedule, … | F. Burkart | XFEL MAC | LUXE

Conclusion LUXE as QED basic research – would enlarge the scientific scope of XFEL. Theory and accelerator community is very interested in conducting this experiment at the XFEL. DESY and XFEL directorate supportive. Design consideration with input from various DESY technical groups. Layout and achievable parameters look feasible. Possible location of the experiment found in XSDU1 or XTD20. Major modification of extraction beam line needed. Early implementation of the beam extraction for future XFEL upgrade and/or test beam area. Integration, Installation and Design studies ongoing. | F. Burkart | XFEL MAC | LUXE

Direct comments from MAC – report under preparation Very interesting project. Timeline to be evaluated. Difficult modification of the beam line!! Check ”standard” beam parameters (14 GeV, 0.25 nC) More studies needed – full start to end simulation, background studies. | F. Burkart | XFEL MAC | LUXE