DOE Status Meeting of the LCLS Project

Slides:



Advertisements
Similar presentations
US CMS DOE/NSF Review: May 8-10, US CMS Cost & Schedule Mark Reichanadter US CMS Project Engineer DOE/NSF Review 8 May 2001.
Advertisements

M. Reichanadter, SLACLCLS FAC Meeting - April 29, 2004 LCLS Organization & Execution M. Reichanadter LCLS FAC Meeting April 29, 2004 LCLS.
Richard M. Boyce FAC Review – Accelerator Installation October 29-31, Installation – Accelerator Systems Installation Planning.
FAC, 4/20/06 D. Schultz 1 e-Beams System Update Linac System Preparing for downtime installation. Injector System Installation has started. Undulator System.
John N. Galayda LCLS FAC 20 April Linac Coherent Light Source Overview and Charge Facility Advisory Committee John.
Mark Reichanadter LCLS FAC October 29-31, 2007 Report to the LCLS Facilities Advisory Committee Project Management Project.
Mark Reichanadter LCLS FAC April 20-21, 2006 Meeting of the LCLS Facilities Advisory Committee LCLS Project Management M.
FAC, 4/16/07 D. Schultz 1 e-Beams Systems Update People ARR Linac Installation Undulator Production MMF Operations David Schultz.
John Arthur Photon October 29, Photon Systems Update FAC recommendations Current status New plan for Photon Systems.
Jess Albino Facility Advisory October 29, 2007 FACILITY ADVISORY COMMITTEE PLENARY CONVENTIONAL FACILITIES UPDATE October.
M. Reichanadter LCLS Project June 2008 FAC Meeting Report to the LCLS Facilities Advisory Committee Project Management.
Richard M. Boyce FAC October 29-31, Installation Planning Integration process – IMT update Installation Planning &
John N. Galayda LCLS FAC October Linac Coherent Light Source Overview and Charge Facility Advisory Committee.
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
John N. Galayda LCLS Facility Advisory 29 October 2007 Linac Coherent Light Source Overview 29 October 2007  Project.
Mark Reichanadter LCLS FAC April 16-17, 2007 Report to the LCLS Facilities Advisory Committee LCLS Project Management M.
Mark Reichanadter LCLS FAC Oct12-13, 2004 Meeting of the LCLS Facilities Advisory Committee LCLS Organization & Execution.
1 BROOKHAVEN SCIENCE ASSOCIATES Project Performance & Risk Management Aesook Byon, Deputy Project Director NSLS-II PAC Meeting February 8-9, 2011.
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck NLSL II Deputy Director (Project Management)
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Status Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Accelerator.
W.J. Foyt LUSI DOE Review July 23, 2007 Project Management 1 Project Management W. J. Foyt Project Scope Timeline Cost Estimate.
M. Reichanadter LCLS Project November 2008 FAC Meeting Slac National Accelerator Laboratory Report to the LCLS.
Mark Reichanadter LCLS FAC October 12-13, 2006 Report to the LCLS Facilities Advisory Committee LCLS Project Management.
David Saenz Readiness for Oct 12, 2006 # Meeting of the LCLS Facilities Advisory Committee LCLS Conventional Facilities.
Mark Reichanadter LCLS October 9-11, 2007 LCLS BCR Overview and EIR LOIs Project Progress / Status Revised Project Baseline.
Cost and Schedule Paul Weinman Pacific Northwest National Laboratory.
Project Management W. J. Foyt
LCLS-II Cost Details E. Daly / C. Hovater / M. Wiseman with help from Accel Ops and Engineering 03-AUG-2017.
Meeting of the LCLS Facilities Advisory Committee
CF Organization & Schedule
Injector –Linac Status & Schedule E. Bong LCLS FAC October 12, 2006
LTU/Undulator Installation Status
Meeting of the LCLS Facilities Advisory Committee
Linac Ops Budget Review LCLS Overview / Org Structure / Legacies
Linac Ops Budget Structure & Approach WBS 1 – LCLS Mgmt & Admin
John N. Galayda – Director of LCLS Construction March 30, 2009
Far Experimental Hall Hutches Civil Construction
CONVENTIONAL FACILITIES STATUS
Electron Beam Systems ETC and Methodology
Thomas Fornek Project Manager July 15, 2009
CONVENTIONAL FACILITIES LCLS Office Space
DOE Mini-Review of the LCLS Project
LCLS Project Management
Details supporting the increase
DOE Review of the LCLS Project
Project Management Issues John N. Galayda, SLAC April 24, 2002
DOE Review of the LCLS Project
LCLS-II Cryoplant Controls Workshop.
Linac Coherent Light Source (LCLS)
LTU/Undulator Installation Status
CONVENTIONAL FACILITIES
Linac Coherent Light Source (LCLS)
DOE Review of the LCLS Project
Installation Status & Operational Readiness Process
DOE Review of the LCLS Project
Department Of Energy Review Linac Coherent Light Source Project
Conventional Facilities
Project Status John N. Galayda.
DOE Mini-Review of the LCLS Project
Electron Beam Systems ETC and Methodology
DOE Review of the LCLS Project
Injector/Linac Design Status C. E
LCLS e- Beams System Overview
Undulator Alignment Plan
CF Scope, Management & Organization
e-Beams Systems Update
LCLS e- Beams Systems Manager
SNS-PPU upgrades the existing accelerator structure
Presentation transcript:

DOE Status Meeting of the LCLS Project LCLS Cost and Schedule Status Mark Reichanadter LCLS/SLAC

Project Performance (TEC) m/e June 2006 EV data LCLS showing steady progress 32% TEC comp 29% TPC comp SPI = 0.91 CPI = 0.96 $ burn rate ~$5-6M per/mo Labor burn rate ~$2.5M/mo At SLAC ~165 FTE’s ~350 heads on LCLS

LCLS June 06 Performance Injector 96% complete in Jan07. PM and IN ETC’s are complete. LN, XT and XE ETC’s approved. In next month’s business.

Contingency Allocation CD-2b - Present To date, project has been able to find offsets for CF increases in other parts of the project while maintaining functionality.

Contingency Performance (TEC) July Projection ~$18M BCR, CF-54 approved in July. Projected draw down on Cont/ETC ~20% after Group #1 bids are rolled into baseline.

Major Schedule Variances Linac System: SPI = 0.72, CPI = 1.09 Linac (and Injector) controls hardware behind schedule but recovering. Effort is focused on hardware for current installation and commissioning schedule. Linac controls, RF waveguides and vacuum hardware for 2007 installation deferred to support immediate needs. Undulator System: SPI = 0.85, CPI = 0.92 ANL’s Single Undulator Test (SUT) delayed due to a larger test plan than anticipated. SUT is nearing completion. SLAC’s Magnetic Measurement Facility (MMF) not yet prepared for undulator segment tuning. Undulator alignment monitoring (HLS) also showing some delays. Closely monitoring this work to recover schedule. XES Controls System: SPI = 0.72, CPI = 1.07 XES Controls Systems delayed to focus on preparations for the upcoming Injector installation and commissioning period.

Schedule Status Project critical path (CP) - CLOC B.O. 111d float to CD-4. Commissioning controlling path (CCP) - Und B.O. – install – FEL commission. Total float 213d to CD-4. Received updated Turner schedule. Current BO milestones ~firm. “Co-occupancy” Target dates allow LCLS to install ahead of BO. Near CCP – Undulator vacuum system, Undulator testing, Near-term L3 milestone performance 6/2/06 – 1st Article Undulator 1 Rcvd @ SLAC. Done – 6/12/06 7/10/06 – Award CF subcontracts Done, Group #1 packages out, NTP to Turner on Aug 1 7/28/06 – MMF Qualified & Ready to Measure Prod Undulators ~Aug 28. Benches are installed and measuring the first magnets. 8/21/06 – FY06 Shutdown: HW Reqd for Installation Aug 16 Conducted Installation Readiness Review 11/15/06 – Start Drive Laser Commissioning. On schedule

Integration Status August shutdown underway Schedule shifted and lengthened (Aug 21st - Jan 5th) All LCLS activities integrated into SLAC shutdown activities. Hardware readiness review on August 16 ~OK (some items tight). Fabrication BOA’s helping with last minute items Expediter and facilitation process in place Controls readiness review next week Late delivery of controls hardware may require workarounds (ROD’s). Global Installation / Integration Planning Formulating integration team under direction of RM Boyce CF-Technical interface and leads identified during construction Installation readiness & planning conducted weekly APD Engineer to facilitate inter-lab integration

LCLS Issues Overall Project Budget (see John’s Talk) CF Bid Group #1 & #2 significantly over estimates. CF Bid Group #3 & #4 (2-floor CLOC) out for bid. Due Sep28/Oct5 Turner working to improve bidder turnout ETC updates needed for Controls, Undulator and CF ~$2M FY06 BA shifted to undulators Tight FY08 & FY09 obligations (depending on CLOC bids/schedule) Civil Construction Management Team Strengthened LCLS CF Team APD Civil Constr, Turner Exec, Jacobs T3 CA, LCLS Procurement Phase 2 NTP issued to Turner, mobilize mid-Sep Controls cost and schedule performance ETC is showing cost growth (scrubbing back in box) Controls (cabling) is CP or near-CP in many areas.

Obligation and Cost Projections (Assumes 50% over budget on CLOC) Projected Obl profile with CF cost growth FY06, advanced ~$2M budget for undulators FY08 is tight. Delay CLOC schedule can free up contingency if needed.

LCLS OPC Profile Prior to Oct06 Lehman review, LCLS will update pre-ops planning to provide a smooth segue into SLAC Ops and LUSI. 45 FTE’s 44 FTE’s 46 FTE’s Annualized

Summary LCLS Construction Near-Term Timeline FFTB soil removal underway ~complete Award 8/9 Group #1 Packages (~$69M) Notice to Proceed with Construction to TCCo, August 1 Conducted Review of Emergency Mgmt Procedures CF Process Review planned, Early September Negotiate/award Bid Group #2, Sep 15 Turner subcontractors mobilize at SLAC, Sep 15 Safety is a pre-condition Receive/evaluate Bid Group #3 & #4 (2-f CLOC), Oct 15 With firm pricing on 2f CLOC, determine affordability, and award, or pursue D-B option, Dec 15.

Summary-2 LCLS Technical Scope Near-Term Timeline Execute Aug06 shutdown, Aug21 Begin Laser commissioning, Jan07 Finalize integration team/procedures, Sep 15 Identify Integration POC’s LCLS Management Near-Term Timeline Select and hire APD-Engineering, Sep 15 Finalize ETC (EVM CAP), Sep30 Update LCLS OPC, Oct 15 Prepare for DOE Lehman Review, Oct 24-26