List of IPAC19 papers with reference to HL-LHC

Slides:



Advertisements
Similar presentations
1 RHIC – p+p and p+Au projections for March 2014 STAR meeting.
Advertisements

1 Accelerator Physics Aspects LHCb Accelerator Physics Aspects LHCb CERN SL/AP n Layout n Crossing Scheme n Luminosity n Collision.
Machine Detector Interface for the HL (MDI) CERN, April 15, 2011 Austin Ball, Helmut Burkhardt, Marzio Nessi.
The LHC: an Accelerated Overview Jonathan Walsh May 2, 2006.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
Hollow Electron Lens Update
UKNF OsC RAL – 31 st January 2011 UKNF - Status, high lights, plans J. Pozimski.
Paris 5 September 2005 HHH Status progress W. Scandale CERN Accelerator Technology Department CARE-HHH Network: coordinators: F. Ruggiero and W. Scandale.
ILC Beam Delivery System / MDI Issues for LCC-phase (~
1 BNL LARP Accelerator Physics Program Resources BNL role in national program BNL Accelerator Physics Program.
1 CC & MP - CC10 - CERN Crab LHC J. Wenninger CERN Beams Department for the LHC Machine Protection Panel.
AT-MEI-PE, RD, LIUWG 31-JUL R. Denz AT-MEI-PE LHC Luminosity Upgrade Protection of the Inner Triplet, D1, Correctors and Superconducting Links/Leads.
JRA on Development of High Temperature SC Link Motivation Work Packages Partners & resources Amalia Ballarino Esgard open meeting CERN,
Education Thesis: Layout and design of a high accuracy magnetic field measurement system for superconducting undulators. Thesis: Phase error reduction.
HIGHLIGHTS OF LAST MONTHS OF HSS ACTIVITIES AN EXCITING AND HECTIC PERIOD WITH THE LHC BACK IN OPERATION… ABP General Group meeting - HSS1.
Technology Department CERN-GREECE INDUSTRY DAY Monday, 31 March 2014 TECHNOLOGY DEPARTENT 2 In the frame of the Accelerators & Technology Sector at CERN,
MeRHIC Internal Cost Review October, Dmitry Kayran for injector group MeRHIC Internal Cost Review October 7-8, 2009 MeRHIC: Injection System Gun.
1 Task particle simulations studies: progress report M. Giovannozzi Objectives To study the field quality tolerances for new magnetic elements for.
BEAM INSTRUMENTATION AND DIAGNOSTICS FOR HIGH LUMINOSITY LHC Rhodri Jones CERN Beam Instrumentation Group.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Impedance Working Group Update ICE meeting June 12 th 2013.
LIU-Ions overall status and outlook: LEIR H. Bartosik for the LIU-IONS LEIR team* with lots of material from “Beam dynamics studies on LEIR”, H. Bartosik,
Collimation design considerations at CERN (with some applications to LHC) R. Bruce on behalf of the CERN LHC collimation project R. Bruce,
Summary WG 9 Instrumentation and Control 1 session: 2 presentations 1 contribution discussion Oct 12, 2014 M. Minty, H. Schmickler.
Logo area HL LHC IT STRING M. Bajko CERN TE-TM and QXF Review.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
ENERGY DEPOSITION AND TAS DIAMETER
CERN – ENGINEERING DEPARTMENT: A. Dallocchio on behalf of EN-MME
Alignment systems in ATLAS: Monitoring of the bedplates
Beam Instability in High Energy Hadron Accelerators and its Challenge for SPPC Liu Yu Dong.
contribution to the round table discussion
Instrumentation for Accelerators Technologies for the HL-LHC
M.J. Barnes : Canadian Involvement with LHC
J. Alexander + Cornell accelerator group Cornell University
Advanced collimation design studies (TCT with wire, hollow e lens)
Perspective on future challenges for very high energy hadron colliders
M. Alcaide Leon, Paolo Fessia
Potential failure scenarios that can lead to very fast orbit changes and machine protection requirements for HL-LHC operation Daniel Wollmann with input.
M. Alcaide Leon, Paolo Fessia
HL-LHC-UK: UK contribution to HL-LHC Crab Cavities and evolution
19th Hadron Synchrotron Incoherent effects section meeting
M.Jonker CTC MPO-WG status
HIGHLIGHTS OF LAST MONTHS OF HSS ACTIVITIES
Adriana Rossi, Sergey Sadovich
Follow-up of HL-LHC Annual meeting
Lecture 2 Live Feed – CERN Control Centre
Why Study Electron Clouds? Methods and Tools to Study Electron Clouds
CLIC-ILC BDS & MDI work.
Summary on SPPC Accelerators
Beam Gas Ionization Monitor (BGI)
Rhodri Jones (CERN BEAM INSTRUMENTATION GROUP)
LHC status Benoit Salvant (Beams department, Accelerator and Beam Physics group) for the LHC complex teams With many thanks for their inputs to J. Boyd,
Machine Protection Xu Hongliang.
CSP Meeting CERN CERN Accelerators in th November 2010
Scrubbing progress - 10/12/2012
C.Octavio Domínguez, Humberto Maury Cuna
HIGH ENERGY LHC E. Todesco CERN, Geneva Switzerland
INFN and the ILC S. Bertolucci, INFN.
CLIC damping rings working plan towards the CDR
FEL-Beam-Dynamics Group
Collimators: Operations - Baseline Assumptions
ACCELERATORS AND DETECTORS
LCLS Injector/Diagnostics David H. Dowell, SLAC April 24, 2002
High Energy High Intensity Hadron Beams
Review of Quench Limits
LHC Machine Advisory Committee, CERN 12th June 2008
Crab Crossing Named #1 common technical risk (p. 6 of the report)
WP13 outsourcing: Hollow Electron Lens
R. Denz, TE-MPE-EP Acknowledgements: J. Steckert
Operational Results of LHC Collimator Alignment using Machine Learning
Presentation transcript:

List of IPAC19 papers with reference to HL-LHC C. Noels HL-LHC TCC – 9th May 2019

BE Department Group Title Main Author Presenter Presentation type BE-ABP First Machine Development Results with HL-LHC Crab Cavities in the SPS L. R. Carver   Electron cloud build-up simulations in the two-beam common chamber of the HL-LHC TDIS with nonuniform surface properties G. Skripka Poster Numerical optimization of DC wire compensation in HL-LHC K. Skoufaris G. Sterbini Beam-based measurement of the skew-sextupolar component of the radio frequency field of a HL-LHC-type crab-cavity M. Carla Collimation system upgrades for the High Luminosity Large Hadron Collider and expected cleaning performance in Run 3 A. Mereghetti N. Fuster Martinez K-Modulation for future High Energy Colliders M. Hofer Smooth and beta-beating-free optics transitions for HL-LHC R. De Maria HL-LHC optics and layout V1.4 LHC Run 2 optics commissioning experience in view of HL-LHC R. Tomas Garcia BE-BI-BL Measuring beam size with the LHC Beam Gas Vertex detector B. Würkner The Beam Gas Vertex profile monitoring station for HL-LHC R. Kieffer Presentation and Poster BE-BI-EA Electron beam dynamics simulation for electron lenses S. Sadovich BE-OP-LHC Effect of Ground Motion introduced by HL-LHC CE Work on LHC beam operation M. Schaumann BE-OP-PS Transverse emittance measurement in the CERN Proton Synchrotron in view of beam production for the High-Luminosity LHC E. Senes TCC 9 May 2019

EN Department Group Title Main Author Presenter Presentation type EN-MME Ultra-High Vacuum characterization of Molybdenum‑Carbide Graphite for HL-LHC collimators C. Accettura   The development programme of cathodes and electron guns for the hollow electron lenses of the High Luminosity LHC project D. Perini Numerical and experimental evaluation of the DQW crab cavity cryomodule thermal budget E. Cano Pleite Mechanical robustness of HL-LHC collimator designs F. Carra EN-SMM HL-LHC Full Remote Alignment Study A. Herty Design and study of a 6 degree-of-freedom universal adjustment platform for HL-LHC components M. Sosin EN-STI Run 2 prompt dose distribution and evolution at the Large Hadron Collider and implications for future accelerator operation G. Lerner TCC 9 May 2019

TE Department Group Title Main Author Presenter Presentation type TE-ABT Machine Protection Aspects of High-Voltage Flashovers of the LHC Beam Dump Dilution Kickers C. Wiesner   Operational Experience of a Prototype LHC Injection Kicker Magnet with a low SEY coating and Redistributed Power Deposition M. Barnes Transverse impedance measurements and simulations of the LHC injection kicker magnets V. Vlachodimitropoulos Studies towards the new beam screen system of the LHC injection kicker magnet for HL-LHC operation TE-EPC Impact of flux jumps on high-precision powering of Nb3Sn superconducting magnets M. Martino TE-MPE Beam Impact Experiment of 440GeV/p Protons on Superconducting Wires and Tapes in a Cryogenic Environment A. Will Machine Protection Experience from Beam Tests with Crab Cavity Prototypes in the CERN SPS B. Lindstrom Characterisation of the Radiation Hardness of Cryogenic Bypass Diodes for the HL-LHC Inner Triplet Circuit D. Wollmann Quench Detection and Diagnostics Systems for the Superconducting Circuits of the HL-LHC R. Denz TCC 9 May 2019

Thanks a lot for your collaboration! Next actions WPLs/GLs: Check that the HL list is complete with your group secretariat. In any papers are missing, the authors shall send the latest version to Lucio and Oliver (cc me) by Friday evening. Ask the authors to send me the final version (PDF format) for archiving Thanks a lot for your collaboration! TCC 9 May 2019