Saturday Luminosity production 1380 bunches

Slides:



Advertisements
Similar presentations
PROFIBUS controller problem (SEU) on cryo valve on DFBMH (600 A circuit RQ6.L7B1/2). Loss of cryo maintain ==> Beam dump. End of fill #1975 after ~2.5.
Advertisements

21/05/2012LHC 8:30 meeting Overview Week 20 Injectors, LHCb polarity, Beam-Beam Coordinators: Bernhard Holzer, Jan Uythoven.
Saturday 25/11/10 & Night 12:24 Dump fill #1523 after more than 8 hours in physics It takes some time to get back:  Parallel sequences: Fewer clicks to.
LHC 8:30 meetingEBH 1  Cryogenics recovery in point 8  Meanwhile a couple of accesses:  MKI investigation on noise in IP2  Insulation Vacuum.
07:00 Dump fil #2219, 123 pb -1 delivered. Trim TDI parking position to +/- 55 mm in the collimator BP trimmed the temperature kicker limit to 62 degrees.
LHC Status Fri Morning 3-June
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
LHC Status Tue Morning 22-Aug
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Wed 27/7 – Thu 28/7 09:00 LHC Controls problems
Saturday 24 March 2012.
Friday 15th June 01:11 Injection.
Wednesday September 14th
Tuesday Nov 16th Fill 1492 into physics around 07.30
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
Monday fill with 1092 bunches (6 h stable beams)
Wednesday 17th August Rocky, short fills, initial luminosities are good LHCb polarity change to negative seems ok 18/08/2011 LHC 8:30 meeting.
Thursday 09:30 VdM scan for CMS, standard ADT gain.
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Tue :25 Beams dumped due to RF vacuum interlock
Saturday 12:00 Fill 1992 in stable beams.
Monday 6th August & night
Summary of Week 11: 14 – 21 March
LHC Status Su Morning 17-April R. Assmann, B. Holzer et al
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
BLM changes HV software interlock (SIS)
Friday 31st August & night
Wednesday 8th August & night
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
LHC Operations overview Week 28 – Getting back
Sunday morning Recovering from 400 kV disturbance.
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Saturday – Morning 7:36 beams dumped
Finally.... We had to wait a long time.... We had many problems....
Friday Morning 7:30 injection for fill 2908
Sunday
Wednesday 03/11 – The Plan Finish electron-cloud program:
Wednesday 9:08 Fill 3214 dumped by OP after 5:26 hours in stable beams
Tuesday Access for RF & QPS (others in the shadow) until ~18:00.
Sunday/Monday & :30 Stable beams. Fill #1851.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Monday – Morning Fill 3265 stable beams since 1:31
Aims for the week Recover from technical stop and precycle at 10A/s
Thursday morning 08:45 Stable beams fill 2855 for ATLAS/CMS VdMs.
Monday 14:00 beam dump Access:
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
Summary week 18 Intensity ramp up & production
Saturday Nov Stop proton operation. Switch back to ions
Thursday – Morning Energy matching at injection with H CODs
Fill 1743 Peak luminosity ~6.7 e32 Integratated lumi ~20 pb-1
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
LHC Status Tue Morning 22-Aug
07/08/2010 Fill #1264 dump at 02:14:38.
Thursday 22 September 2011.
Saturday :42 stable beams fill 3541
Monday Fill 1803 into stable beams at 9:30. Dump at 19:45.
LHC Morning Meeting - G. Arduini
Sat 15/10 New record bunch population profiting of the scrubbing period on Friday. Nb~1.42x1011p/bunch  110 MJ at 3.5 TeV. Filling slowed down by ZS sparking.
Thursday
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Friday h55 Stable beams. Fill #1841. Lumi ~1.2e33.
Monday 27th August & night
Wednesday 26 October 2011.
Saturday 28th 08:17 Fill #1812: Stable beams, peak luminosity ~1.1x1033 cm-2s-1 19:00 Go to adjust for RF-checks; Record fill lumi of 31.7 pb-1 for CMS.
Friday During the night from Thursday to Friday: by mistake, SPS longitudinal blow-up was not active  Smaller transverse emittance from the.
Saturday 26 November 2011.
Tuesday
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

Saturday 23.7.2011 Luminosity production 1380 bunches Alice: main bunch – main bunch collisions

Fill 1967 in stable beams since 2:01 Previous night: 22.7. 23:00 BLM high voltage software interlock SIS: changed the delay time before beam dump from 10s to 1 minute for two crates: IP3 and IP7 central crate  no more disabling when going into collision 12:21 Orbit corrected (re-centered with 2 Hz) + lumi scan 13:24 Dump: Loss of cryo maintain in ITR1 QPS circuits tripped due to bad manipulation with sequencer 14:18 cryo conditions back 15:38 QPS recovered

losses in IP7 when bringing LHCb into collisions

Fill 1966 for comparison

Fill #1968 18:25 stable beams fill #1968: Bunch intensity 1.2E11 beam intensity 1.64e14 93 MJ/beam Atlas/CMS luminosity: 1.67/1.65 Hz/nb Emittance ~2.4 um into collisions 19:07 Dump: Glitch on the electrical network (EDF) seen by the FMCM on many warm magnets. RQ10.R4B1 and RQ10.R4B2 tripped as well.

Fill #1968

Fill # 1969 20:23 injection pilots Bunch intensity B1: ~1.25E11 B2:~1.2E11 beam intensity B1: 1.72E14 B2:1.70E14 B1: 96.7 B2: 95.5 MJ Atlas/CMS luminosity: 1.80 Hz/nb Emittance in collision: ~2.4 um 22:14 Dump: BLM TCTVB.4L8 integration time 1.3 sec (due to vacuum activity). Jorg noticed that a bump of around 1 mm had appeared at point 7, at the position of the collimators (the origin is not clear).

Vacuum spike 4L8 during BLM beam dump

Fill 1970 23:16 injecting probe beam During injection (40%) and during ramp (60%): BLM TCTVB.4L8 of threshold and vacuum spikes L8 up to 1E-6 mbar Bunch intensity: 1.2E11 Atlas/CMS luminosity: 1.76/1.74 Hz/nb Try to bring up LHCB lumi with the leveling program At first it does not work due to the vacuum spikes When the spikes calmed down, LHCb lumi brought up Now also BLMs of TCTH.4L1 and TCTH.4L8 in warning and 93% on TCTVB 2:19  stay at 270 for LHCb Beam life time ≥25 hours 2:50 LHCb brought up to target luminosity of 301 Hz/ub 3:12 Dump: BLM TCTVB.4L8 1.3 s RS (spike in vacuum/losses after a period of calm)

Fill 1970

Fill 1970

Fill 1970 BLM Post Mortem

Fill 1971 04:01 injecting probe beam 5:41 stable beams (turn around 2h 29’) Bunch intensity: 1.2E11 Atlas/CMS luminosity: 1.63/1.62 Hz/nb Slowly going up with lumi in LHCb Life time ≤ 25h Vacuum in L8 much better than previous fill, still a few big spikes in collision; no warnings on BLMs 6:49 Dump Cryo S56 ITR5 lost