Hall A Collaboration Meeting

Slides:



Advertisements
Similar presentations
Hall A collaboration meeting, January 4-5, 2007, 1 Operated by the Jefferson Science Associates for the U.S. Department Of Energy Thomas Jefferson National.
Advertisements

Hall A collaboration meeting, June 22-23, 2006, 1 Operated by the Jefferson Science Associates for the U.S. Department Of Energy Thomas Jefferson National.
Hall A collaboration meeting, Junr 21-22, 2007, 1 Operated by the Jefferson Science Associates for the U.S. Department Of Energy Thomas Jefferson National.
Deeply Virtual Compton Scattering on the neutron Slides by Malek MAZOUZ June 21 st 2007 Physics case n-DVCS experimental setup Analysis method Results.
Hall A collaboration meeting, Junr 21-22, 2007, 1 Operated by the Jefferson Science Associates for the U.S. Department Of Energy Thomas Jefferson National.
Measuring the Neutron and 3 He Spin Structure at Low Q 2 Vincent Sulkosky College of William and Mary, Williamsburg VA Experimental Overview The.
BigBite K.Egiyan Probabilities of SRC in Nuclei Measured with A(e,e / ) Reactions K. Egiyan (Yerevan Physics Institute, Yerevan, Armenia and Jefferson.
Introduction Glasgow’s NPE research Group uses high precision electromagnetic probes to study the subatomic structure of matter. Alongside this we are.
Jin Huang PhD Candidate, MIT For MENU 2010 May 31, Williamsburg.
Hall A Status Hall A Collaboration Meeting June 9, 2011 Robert Michaels Acting Hall A Leader Recent Activity Publications (please write archival papers.
DVCS collaboration meeting, December 15-16, 2008, 1 Operated by the Jefferson Science Associates for the U.S. Department Of Energy Thomas Jefferson National.
Jefferson Lab Status Bob McKeown July 17, April 2015 Outline 12 GeV Project and Commissioning PAC Budgets and Schedule LERF Planning MOLLER, SoLID.
Jefferson Lab Status Hall A collaboration Dec. 16, 2013 R. D. McKeown Deputy Director For Science.
Proton Form Factor ratio GEp/GMp with polarization method --on behalf of Jefferson lab GEp3 collaboration Wei Luo Lanzhou University, China April
LEDA / Lepton Scattering on Hadrons Hypernuclear Spectroscopy: 12 C and 16 O, 9 Be(preliminary) high quality data available. First publication soon. Extension.
12 GeV Science Program R. D. McKeown JSA Science Council January 7, 2011 Thanks to A. Lung, L. Cardman, others.
UK Hadron Physics D. G. Ireland 10 October 2014 NuPECC Meeting, Edinburgh.
Jin Huang PhD Candidate, MIT For Hall A Collaboration Meeting June 10, JLab.
Hall A Collaboration, June 10, 2010, 1 Operated by the Jefferson Science Associates for the U.S. Department Of Energy Thomas Jefferson National Accelerator.
Thomas Jefferson National Accelerator Facility R. D. McKeown Slide 1 R. D. McKeown Jefferson Lab College of William and Mary The 12 GeV Science Program.
Precision Measurement of R L and R T of Quasi-Elastic Electron Scattering In the Momentum Transfer Range 0.55GeV/c≤|q|≤1.0GeV/c* Yan Xinhu Department of.
Jefferson Lab Update R. D. McKeown Jefferson Lab HPS Meeting June 16, 2014.
Hall A Status Hall A Collaboration Meeting June 7-8, 2012 Robert Michaels Acting Hall A Leader for 3 more weeks, and then: new Hall A Leader Cynthia Keppel.
Vina Punjabi Norfolk State University Hall A Collaboration Meeting June 10-11, 2010 GEp-V Experiment to Measure G Ep /G Mp.
MOLLER Collaboration Meeting May 2014 Hall A Update Thia Keppel 1.
Measuring the Spin Structure of 3 He and the Neutron at Low Q 2 Timothy Holmstrom College of William and Mary For the Jefferson Lab Hall A Collaboration.
Jefferson Lab Overview Bob McKeown April 20, 2015.
The 12 GeV Physics Program at Jefferson Lab R. D. McKeown Jefferson Lab College of William and Mary PTSP 2013 – Charlottesville, VA September 9, 2013.
GEp-III in Hall C Andrew Puckett, MIT On behalf of the Jefferson Lab Hall C GEp-III Collaboration April 15, 2008.
Thomas Jefferson National Accelerator Facility PAC-25, January 17, 2004, 1 Baldin Sum Rule Hall C: E Q 2 -evolution of GDH integral Hall A: E94-010,
E97-110: Small Angle GDH Experimental Status Report E97-110: Small Angle GDH Experimental Status Report Vincent Sulkosky Massachusetts Institute of Technology.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Anthony.
Hall A collaboration meeting, june 13-15, 2002, 1 Operated by the Southeastern Universities Research Association for the U.S. Department Of Energy Thomas.
Hall A Status Hall A Collaboration Meeting Dec 15, 2011 Robert Michaels Acting Hall A Leader Recent Activity Future Projects Scheduling Process Publications.
6 GeV Program Overview Rolf Ent PAC38 Meeting August 22 nd 2011 HallPhysics Began Experiments Completed (full/partial) Experiments Completed (equivalent.
PAC37 Charge 1 1.) Review new proposals, previously conditionally approved proposals, and letters of intent † † for experiments that will utilize the 12.
JLab, October 31, 2008 WACS in 12 GeV era 1 GPDs Wide-Angle Compton Scattering pi-0 photo-production in 12 GeV era B. Wojtsekhowski Outline WACS and other.
1 Melynda Brooks, “Understanding the Origin of the Nucleon Spin” Understanding the Origin of the Nucleon Spin Andi Klein, P-23, Melynda Brooks P-25, Pat.
Thomas Jefferson National Accelerator Facility Page 1 IPR September 28-30, 2010 John LeRose Independent Project Review of 12 GeV Upgrade Jefferson Lab.
E97-110: Small Angle GDH Experimental Status Report E97-110: Small Angle GDH Experimental Status Report Vincent Sulkosky Massachusetts Institute of Technology.
Hall A collaboration meeting, December 3-5, 2008, 1 Operated by the Jefferson Science Associates for the U.S. Department Of Energy Thomas Jefferson National.
Hall A Update Thia Keppel User Group Board of Directors January 2015.
Pb-Parity and Septum Update Presented by: Luis Mercado UMass - Amherst 12/05/2008 Thanks to Robert Michaels, Kent Pachke, Krishna Kumar, Dustin McNulty.
Status of Polarimeters and Polarized Targets: what are the plans for development of polarized targets to meet the needs of the Day 1 and future experimental.
In the SM to the first order x: variable relevant to the nucleon internal structure Q 2 : Four-momentum transfer squared between the electron and the target.
Jefferson Lab PAC 30 1 August 23, 2006 PR (Hall A) ● PR (Hall C) Measuring the Neutron g 2 and d 2 at 12 GeV PR (Hall A) ● PR
Timelike Compton Scattering at JLab
L. Tang Hampton University / JLAB On behalf of Hall A collaboration
Jefferson Lab Overview
PAC44 Results NUMBER TITLE CONTACT PERSON HALL DAYS REQUESTED
PAC45 Results NUMBER TITLE CONTACT PERSON HALL DAYS REQUESTED
Report to UGBOD Bob McKeown January 14, 2016.
Sanghwa Park (Stony Brook) for the PREX/CREX Collaboration
PAC38 Charge 1.) Review new proposals, previously conditionally approved proposals, and letters of intent† for experiments that will utilize the 12 GeV.
Higher twist effects in polarized experiments
Wide Angle Compton Scattering
Jefferson Lab Status Bob McKeown May 6, 2016.
Accelerator Issues Raised in Hall A Parity Collaboration Meeting, April B-Team Meeting April 29, 2009.
LEDA / Lepton Scattering on Hadrons
presented by Werner Boeglin Florida International University Miami
Jefferson Lab Status Bob McKeown October 21, 2015.
LEDA / Lepton Scattering on Hadrons
University of New Hampshire Nuclear & Particle Physics Group
View from Lab Management HPS Collaboration Meeting
Schedule Rolf Ent HPS Meeting, May 22, 2018.
Science Overview and the Experimental Program
SOLID Collaboration Meeting
Parity – Violating Neutron Density Measurements : PREX, C-REX
Life Cycle of a Nuclear Physics Experiment
PAC47 Charge Robert McKeown PAC47 July 29, 2019.
Presentation transcript:

Hall A Collaboration Meeting HALL-A STATUS REPORT Hall A Collaboration Meeting June 12-14, 2008 KEES DE JAGER JEFFERSON LABORATORY Our wine-and cheese gathering is in A110 on Friday evening, starting at 6:00 pm. Dennis has graciously agreed to chaperone us. If you attend (most of you, I hope) please pay Stephanie the standard 9 $ contribution

Achievements 2008-I Successfully ran Dec/Jan E05-110 Coulomb Sum Rule Zein-Eddine Meziani Jan E06-002 PREx tests Kent Paschke Jan E06-007 208Pb(e,e’p) addition Arun Saha Feb-Mar Installation of BigBite Ed Folts Apr E04-007 Threshold πo Electroproduction Richard Lindgren May Installation of electron package Guy Ron June E08-007 GEp/GMp at Low Q2 Doug Higinbotham 13(!) proposals submitted to PAC-33 for a total of 281 days with an allocation of 101 days 4 proposals approved with A rating, 3 with B, 2 with C3 rating Backlog to 5.1 years Essential whether new proposals can run in parallel with Qweak GEp and N->Δ definitely can DVCS can if it accepts a hit in beam energy (polarization?) x > 2, deuteron threshold probably can for most of their time 4He(e,e’p) definitely can not

Hall A Approved Proposals PAC 4-33 46 Experiments completed 165/115(!) days scheduled for the next 12 months Backlog ~5.3 years (annual average for Hall A is ~60 days at 80% funding)

Publications (incl. submissions) in 2008-I M. Iodice et al., High Resolution Spectroscopy 12Bλ by Electroproduction, PRL 99, 052501 (2007), nucl-ex/0705.3332 R. Shneor et al., Investigation of proton-proton short-range correlations via the 12C(e,e’pp) reaction, PRL 99, 072501 (2007), nucl-ex/0703023 G. Ron et al., The Proton Elastic Form Factor Ratio µpGEp/GMp at Low Momentum Transfer, PRL 99, 202002 (2007), nucl-ex/0706.0128 M. Mazouz et al., Deeply Virtual Compton Scattering off the Neutron, PRL 99 2420501 (2007), nucl-ex/0709.04501 K. Slifer et al., He-3 Spin-Dependent Cross Sections and Sum Rules, submitted to PRL, 0803.2267 [nucl-ex] P. Solvignon et al., Quark-Hadron Duality in Neutron (3He) Spin Structure, submitted to PRL, 0803.3845 [nucl-ex] R. Subedi et al., Probing Cold Dense Nuclear Matter, Science 320, 12XX (2008) A. Shahinyan et al., The Electromagnetic calorimeter in JLab Real Compton Scattering Experiment,
arXiv:0704.1830 Total number of Hall A publications: Science 1, PRL+PLB 35(+2), PRC 17, NIM 14(+1). Average time from completion of experiment to submission 20 months with 75% within 3 years. At present 5 experiments that have not submitted a manuscript more than 3 years after completion Hall A has been running now for 11 years, with an average publication output of 4+. Essential that more effort goes into publications, especially archival pubs Top cited Hall A publications: 2 250+, 2 100+, 11 50+ Please enter all publications into the JLab publication data base on submission

PUBLICATIONS-II Archival papers promised to be completed LAST year: E89-044 3He(e,e’p) complete L/T separation E91-026 deuteron A and B next spring E93-050 VCS E94-010 GDH only introduction needed E99-007 GEp-II E99-114 WACS Achievements to date: E89-003 16O(e,e’p) published E91-010 HAPPEx-I published E91-011 N->Δ published E93-027 GEp-I published E94-012 H(γ,p)πo published E94-104 γn -> π-p published E95-001 GMn published E99-117 A1n published Standard publications in draft form for too long: Kaon electroproduction Transverse SSA 16N hypernuclear spectroscopy

Scheduled Experiments in Hall A Exp Title Contact persons Jun-Oct Installation of Polarized 3He target Oct-Feb/May run BigBite plus polarized 3He experiments E06-010 transversity Xiaodong Jiang E07-013 normal SSA Tim Holmstrom E06-014 d2n Brad Sawatsky E05-015 3He SSA Todd Averett E08-005 Target SSA Vince Sulkosky E05-102 Quasi-elastic 3He Doug Higinbotham 2009 HAPPEx-III, DIS-Parity 2010 Lead Parity Schedule through summer 2009 will be posted soon. However, there are significant uncertainties about the budget (continuing resolution expected until April 2009, we might not get the President’s budget,…). Even if we do get the PB08 after the end of the CR, the present budget allocation to Physics is dollar flat for Hall A, where the FY08 budget was already so bad that it had significant impact on user support. Under that scenario, JLab management has decided to terminate running after Feb 22 (the completion of d2n) until mid August, the start of HAPPEx-III. This has the consequence that the three last polarized 3He experiments will not run in the foreseeable future.

Long-Term Schedule CEBAF will be limited to ~33 weeks of beam on target in FY10 and following FYs as long as the budget continues as expected. This corresponds to a total of 4 months accelerator down per year, with as much as possible during the summer. Accelerator needs 6 month down prior to the 12 GeV installation The long-term schedule is locked by the start of Qweak, scheduled for May 21, 2010. Qweak will run at a fixed energy/pass of 1.165 (possibly 1.185) GeV and maximum polarization, severely restricting the available energy selection, current and polarization. Also, resources, both capital and designers, will become scarcer as the 12 GeV activities increase. The three Hall A parity experiments can not run in parallel with Qweak, thus have to be scheduled starting mid August 2009, in the order HAPPEx-III, PVDIS and PREx. The g2p experiment requires a very large installation effort, optimally in parallel with the 6 month accelerator down in 2012. Tony Thomas will present the long term schedule at the User Group meeting, next week.

Hall A Schedule (Very Tentative!)

Long Range Schedule: assumes FY09 PB plus constant effort in outyears

Draft Schedule – Hall A 1 of 3 Year Experiment Major Installation Tasks Special Accel. Requirements Scientific Rating PAC Days 2008 E05-110 Done Coulomb Sum Rule Calorimeter in HRS FP E0 < 800 MeV A- 26 E06-007 208Pb(e,e’p) Standard makeup a few days missing from 2007 run E04-007 Running Threshold π0 electro-production – Chiral dynamics BigBite B+ 16 E08-007 Low Q2 GEp/GMp 14 2009 E06-010 Transversity Polarized 3He, BigBite A 29 E07-013 Normal SSA in DIS on pol. 3He B 0 (parasitic on E06-010) E06-014 d2n 13 E05-015 E08-005 3 Experiments Dropped if FY09@26 weeks Pol. 3He target SSA 8 E05-102 QE 3He 15 E05-109 HAPPEx-III Møller and Compton upgrade Small helicity correlations (~ 1/20*HAPPEX I) 30 (start) Done Done 3 Experiments Dropped if FY09@26 weeks Enhanced Parity Quality

Draft Schedule – Hall A 2 of 3 Year Experiment Major Installation Tasks Special Accel. Requirements Scientific Rating PAC Days 2010   E05-109 HAPPEx-III Completion Small helicity correlations (~ 1/20*HAPPEX I) A- Complete E08-011 DIS-parity High-speed DAQ 32 E06-002 PREx: Lead Parity Room-temperature septa Møller and Compton upgrade A 30 E07-007 DVCS on the proton PbF2 calorimeter 23 E08-025 DVCS on the neutron B+ 17 2011 DVCS on the proton and neutron A, B+ 40 E07-006 Short Range Correlations via (e,e’pN) BigBite E08-008 Deuteron electrodisintegration near threshold B+ (C3) 18 E08-010 N-D Coulomb quadrupole amplitude at low Q2 3 E08-014 Three-nucleon correlations 12 Requires equipment $$ early in FY09 to meet schedule

Draft Schedule – Hall A 3 of 3 Year Experiment Major Installation Tasks Special Accel. Requirements Scientific Rating PAC Days 2012 E08-027 g2p and the LT Spin polarizability? Septa + beamline chicane Polarized target A- 24 E07-012 Hypernuclear 16O and production Septa B+ 12 E08-009 4He(e,e’p) B+ (C3) 20.5

6 GeV Experimental Equipment: Hall A FY08 FY09 FY10 FY11 FY12 FY13 FY14 PLAN ITEM Polarized 3He Target $135 Parity Instrumentation $117 $170 BigBite $100 High-Speed Data Acq. System (On-going) Compton Polarimeter $155 $50 Transversity Coulomb Sum Rule $18 DVCS $30 $80 $300 Moller Polarimeter $150 DIS Parity deltaLT $630 General Capital (Long-Term Maintenance) -$31 $200 Totals - Hall A $554 $600 $930 $500

12 GeV Schedule On track for CD-3 review this summer Hall A scheduled to start commissioning in Fall 2013 Plans for large instrumentation developments starting: PV-DIS at 12 GeV Møller at 12 GeV Super BigBite HES/HKS in Hall A

12 GeV UPGRADE SCHEDULE

Summary Hall A continues to have a very active and successful research program, but running the 6 GeV program will continue under serious pressure. A first draft of a long-term schedule for the 6 GeV program will be presented at the User Group meeting next week. Vocalize your concerns when you feel the need. Also, make our achievements known to the scientific community through timely publications.