Achieving Nominal Ion Beam PS Ion Progress

Slides:



Advertisements
Similar presentations
LHC-MAC, 15 th June, 2006 LEIR CommissioningC. Carli 1/15 LEIR Commissioning Introduction –Recap on LEIR –General comments –Situation at the time of the.
Advertisements

Thomas Roser Muon collaboration meeting February 8-10, 2002 AGS beam intensity upgrades What has been achieved Sextupole power supply upgrades Bunch manipulation.
Preliminary results and ideas for the SPS upgrade MDs on LHC beams in 2011 G. Rumolo on behalf of all the MD team (Elena, Thomas, Karel, Christina, Holger,
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
First measurements of longitudinal impedance and single-bunch effects in LHC E. Shaposhnikova for BE/RF Thanks: P. Baudrenghien, A. Butterworth, T. Bohl,
LHC beams in the SPS in 2014 H. Bartosik, G. Rumolo, G. Iadarola With the help from K. Kornelis, V. Kain and SPS OP crew.
07-JUL-2003LEADE / JW1 Satellite bunches in the LHC Satellite “definition” Satellite luminosity Satellite detection & tolerances J. Wenninger AB/OP.
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
NA61 11 October 2010Light Ion for NA61/ S. Maury1 Light Ion in SPS Foreseen to have primary Ar beam physics in 2012 Nothing runs in 2012 NA61 duty cycle.
Session 7: I-LHC Organization: Chamonix Summary Session7; Oliver Brüning 1 -session organized in collaboration with D. Manglunki and all speakers.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
Preliminary MEIC Ion Beam Formation Scheme Jiquan Guo for the MEIC design study team Oct. 5,
News on TMCI in the SPS: Injecting high intensity bunches Benoit for the MD team: T. Bohl, K. Cornelis, H. Damerau, W. Hofle, E. Metral, G. Rumolo, B.
SPS proton beam for AWAKE E. Shaposhnikova 13 th AWAKE PEB Meeting With contributions from T. Argyropoulos, T. Bohl, H. Bartosik, S. Cettour.
Crossing transition at RHIC V.Ptitsyn, N.Abreu, M. Brennan, M.Blaskiewicz, W. Fischer, C. Montag, R. Lee, S.Tepikian.
Beam-beam compensation at RHIC LARP Proposal Tanaji Sen, Wolfram Fischer Thanks to Jean-Pierre Koutchouk, Frank Zimmermann.
ELENA: Commissioning & operation ELENA beam commissioning Operation 12/11/2015T.Eriksson CERN BE/OP/AD1.
CONTENT: Beam characteristics and MP concerns BI configuration Operational settings Collimators Planning Shift breakdown Thanks to: P.Baudrenghien, G.Bellodi,
Villars, 26 September Extra Low Energy Antiproton Ring (ELENA) for antiproton deceleration after the AD Pavel Belochitskii for the AD team On behalf.
LIU-Ions overall status and outlook: LEIR H. Bartosik for the LIU-IONS LEIR team* with lots of material from “Beam dynamics studies on LEIR”, H. Bartosik,
Summary of ions measurements in 2015 and priorities for 2016 studies E. Shaposhnikova 3/02/2016 Based on input from H. Bartosik, T. Bohl, B. Goddard, V.
HP-PS beam acceleration and machine circumference A.LachaizeLAGUNA-LBNO General meeting Paris 18/09/13 On behalf of HP-PS design team.
LEIR re-commissioning and other operational aspects First ideas for new tools and organization First draft re-commisisoning plan H. Bartosik, A. Huschauer,
PS - SPS Day 18-Jan-2006 PS Ring by Ray Brown.. 2.
A RHIC Low-Energy Test Run With Protons Todd Satogata (W. Fischer, T. Roser, J. DeLong, M. Brennan, D. Bruno, and others) April 11, 2006 Driven by discussions.
Beam Manufacture in PS2 M. Benedikt, S. Hancock. LHC Beams in the PS by 2015 Typeh injε l inj [evs] h ejN bunch ej RF ej [MHz] ε l ej [evs] τ ej [ns]
A preliminary overview on the 2014 Scrubbing Run II The scrubbing team, i.e. H. Bartosik, G. Iadarola, K. Li, L. Mether, A. Romano, G. Rumolo, B. Salvant,
LIU Day 2014 – M.Bodendorfer - LEIR model. LEIR model A plan for understanding/upgrading the LEIR performance limitations M.Bodendorfer BE/ABP & LEIR.
ICE SECTION The coolest place to be! Elias Métral
Lead performance throughout the injector chain with focus on LEIR
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Installations up to Start of Commissioning
Alternative/complementary Possibilities
Alternative/complementary Possibilities
Plans for ions in the injector complex D
ELENA Overview and Layout Start of ELENA Commissioning Next Steps
Summary of the dedicated MD on July 4th 50ns in SPS with nominal and low γt optics – transverse aspects T. Argyropoulos, H. Bartosik, T. Bohl, A. Burov,
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Longitudinal beam parameters and stability
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Update on the HiLumi/LIU parameters and performance ramp up after LS2
Summary Friday h38: Ramp down and pre-cycle.
Acknowledgments: LIU-PT members and deputies, H. Bartosik
How to run ions in the future?
PSB rf manipulations PSB cavities
New AD Production Beam in the PSB
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
The SPS 800 MHz RF system E. Shaposhnikova for BE/RF
D. Manglunki with input from C. Carli, K. Cornelis, T. Dobers, I
Beam requirements and operational scenarios in 2010
Scrubbing progress - 10/12/2012
Introduction to LHC beam production in PSB and PS
Saturday 7th May Sat – Sun night
LEIR Presented by M. CHANEL PSDAYS: EVIAN 2001.
Accumulation in the LEIR Ring
News on TMCI in the SPS: Injecting high intensity bunches
Beam dynamics requirements after LS2
Generation of Higher Brightness Beams for LHC
I-LHC NOMINAL ions beam in 2007
Collective effects in the SPS and LHC (longitudinal plane)
Summary of session 9: "LHC Injectors Upgrade"
PSB magnetic cycle 900 ms MeV to 2 GeV
Another Immortal Fill….
LHC Machine Advisory Committee, CERN 12th June 2008
ELENA beam commissioning
Some Thoughts on the JLEIC Ion Injector
Plans for future electron cooling needs PS BD/AC
Updated MEIC Ion Beam Formation Scheme
JLEIC Ion Beam Formation options for 200 GeV
Presentation transcript:

Achieving Nominal Ion Beam PS Ion Progress C. Carli and D. Manglunki on behalf of the I-LHC team Status: LEIR PS SPS In view of the Early LHC Ion Beam: Actions In view of the Nominal LHC Ion Beam: Present Planning LHC Machine Advisory Committee, Dec 8th, ‘06 C. Carli & D. Manglunki

Status (LEIR) Comments on the autumn 2006 run: Vacuum leaks during preparations for the run: (leak of high voltage feed through, exchange of electron cooler gun, bake-out incident, leak on cooler collector, … finally fixed with UHV varnish), Thanks for all the efforts (workshop, AT/VAC teams, e-cooler team) Magnetic cycle generation: temp. difficulties to make new lattice data available Solved thanks to efforts from the LSA team. Low level RF re-commissioning (during “normal” start-up, had been considered an issue), continuous development during run. Very limited support from OP AD run extended throughout PS commissioning Strong perturbations of the start-up (and the run). Early beam available without particular difficulties: Apart injection efficiency fluctuations due to PS stray field (-> LEIR performance depending on PS cycle) Some diagnostics missing/difficult: ionisation profile monitors, profiles in ejection line, “old” system for Schottky diagnostics…. LHC Machine Advisory Committee, Dec 8th, ‘06 C. Carli & D. Manglunki

Status (LEIR) In view of the nominal beam (schedule: “first exploratory studies”): Nominal intensity accumulated, Losses (not understood) at beginning of ramp, emittances NOT measured !! Further studies (availability of measurements) required !! Best we could obtain with the available resources. 80% of nom. intensity accelerated on Oct. 13th Nom. intensity at end of accumulation on Oct. 13th LHC Machine Advisory Committee, Dec 8th, ‘06 C. Carli & D. Manglunki

Status (LEIR) LEIR operational status reasonably reproducible (say like the PSB), apart technical problems (vacuum ..), reasonably smooth start-up, “early” beam for the PS provided without particular problems, vacuum upgrades successful: studies on nominal beam not limited by life-time (small margin? – intensity saturated at less than twice the nominal one), electron cooler works well (gun/collector spare situation is a concern). Needs for consolidation/completion (emittance and other measurements, hardware, RF low level …) Still some way to have the nominal LEIR beam available: we did the best we could with the resources and time available, (probably) not exhaustive list of issues: improve accumulation rate (injection, Linac 3 current …), better understanding of transverse damper, understand losses at beginning of ramp (acceptances/emittances in all three planes, tune spreads ? …) LHC Machine Advisory Committee, Dec 8th, ‘06 C. Carli & D. Manglunki

PS status Planned (Aim at Early Beam, but hope to produce “quasi-nominal” beam): 21 days of parallel MD time (daytime only) 5 (out of 6 requested) periods of 8 dedicated hours Achieved: 15 days of parallel MD time In spite of difficult startup, LEIR beam only delayed by 2 days 4 days lost by subsequent breakdowns/faults from LINAC 3, LEIR, MPS 5 periods of 6 dedicated hours Interventions inside PS (+30’ cooldown) needed for PI.SMH26 cooling and outside PS for F16.QFO205 control at beginning and end of each MD (see below) Issues and Problems encountered: SEMgrids in PS and TT2 (OK now) Doubt on stripper movement (see shutdown work) Recheck quadrupole polarities in TT2 (done during MD) Insufficient current from one power supply (F16.QFO205) for low-b scheme 440A needed, 330A available, 400A available for dedicated MDs (see shutdown work) New extraction optics from 2007 onwards (no PE.QKE58) Java console Manager problems with PPMcopy, polluted CCVs No Automatic Beam Steering (ABS) in TT2 Only 2 users (LHCION and MDION), 3 needed (Early, Nominal , Flat) Resources mobilised by LHC proton beamS LHC Machine Advisory Committee, Dec 8th, ‘06 C. Carli & D. Manglunki

PS status: Early beam [1] Injection (in parallel) First time right with computed currents Lifetime measurements (in parallel) Excellent vacuum + ion species => t>>700ms LEIR-PS matching (2 dedicated MDs) Still some V mismatch Acceleration/Transition/Synchro Only losses (25-50%) at field rise All done in parallel whilst providing MD&OP beams Ejection with old then new optics LHC Machine Advisory Committee, Dec 8th, ‘06 C. Carli & D. Manglunki

PS status: Early beam [2] (Limited) Low-b validation and Matching to TT2 (3 dedicated MDs) Bonus: Transport through TT10 at the end of last dedicated MD Thanks to LSA, no instrumentation Design parameters practically achieved for Early Beam, but more stability needed H=10.2 m V=6.9m Parameter Design Achieved Unit I 9.80 9.00 E9 charges N 1.20 1.1 E8 ions eH 0.55 0.47 p.mm.mrad eV 0.40 e*H 1.00 0.85 mm e*V 0.73 e// 0.025 0.012 eVs/u tB 4.00 3.80 ns Dp/p 0.65 0.30 E-3 LHC Machine Advisory Committee, Dec 8th, ‘06 C. Carli & D. Manglunki

PS status: Nominal beam (RF) Reminder: same intensity/bunch as Early, but lots of gymnastics: Batch expansion H16 -> H14 -> H12 Splitting H12 -> H24 Batch expansion 24 -> H21 Transition crossing, synchro to SPS and rebucketing at H169 as for Early Beam Insufficient pick-up sensitivity to permit the radial loop to be closed until ~100ms after injection. One 80MHz cavity is required for rebucketing, tuned to a different frequency from that for LHC protons. (i.e. no spare cavity for p+) Sampled measurement of harmonic number did not work at the very lowest energies (realtime task?). Splitting difficult at chosen energy (short bunches due to proximity to transition ). Good measured lifetime indicates we can lower it for the next attempts in 2007 Control of the relative phasing between the different harmonic components of the 10MHz system is an issue that must be addressed Several more MDs will be required to complete the work on the nominal beam. LHC Machine Advisory Committee, Dec 8th, ‘06 C. Carli & D. Manglunki

SPS Status Early beam was sent to the entrance of the machine in November Commissioning of the LHC ion beam planned for autumn 2007 Early LHC ion beam seen just upstream from SPS injection Issues: Complete the low level RF system on time for next autumn Resources: time and manpower for ions while preparing LHC proton startup LHC Machine Advisory Committee, Dec 8th, ‘06 C. Carli & D. Manglunki

In view of the Early LHC Ion Beam (List of Actions) The Early beam has been produced in LEIR Improve intensity reliability/reproducibility Upgrades in the PS (planned for shutdown 06-07): RF: radial loop pick-up sensitivity boost by 12dB (most probable cause of the ~30% losses seen at the start of acceleration) Controls: ABS, PPM copy Power supply for F16.QFO205 in TT2 Cooling water for PI.SMH26 Modification of stripper movement acquisition (outside vacuum) SPS: beam knocked at the door but everything remains to be done; extensive dedicated MD period scheduled for autumn 2007 Inject on flat bottom, measure lifetimes Accelerate through transition, synchronize on external frequency Extraction LHC Machine Advisory Committee, Dec 8th, ‘06 C. Carli & D. Manglunki

In view of the Nominal LHC Ion Beam (List of Actions) Produce the Nominal beam in LEIR: Improved diagnostics: Renovate emittance measurement in the ring (ionization profile monitors), Renovate emittane measurements of the LEIR to PS transfer line, Verification of transverse dampers (and maybe other systems), Increased Linac 3 current will help Thorough (needs sufficient resources) optimizations (electron cooling, injection ……) and investigations to: Produce the nominal LEIR beam and/or, Understand and cure limitations. Nominal scheme in the PS: Complete the setting-up of the RF gymnastics (many harmonic number changes, “re-bucketing”, bunch splitting): Can mostly be done with lower intensity, Verification that it works with the nominal parameters (measure ejected beam). SPS: Investigate limitations (tune spreads, IBS) as soon as possible (autumn 2007) with “early beam” (nominal bunch population, just a longer plateau needed), Leaves time to implement cures, in case limitations are encountered, Setting up of accumulation of up to 52 LHC ion bunches of the nominal beam. LHC Machine Advisory Committee, Dec 8th, ‘06 C. Carli & D. Manglunki

In view of the Nominal LHC ion Beam (Present Planning …) Autumn 2007: In draft 2007 Accelerator Schedule: Commissioning of the early beam in the SPS MDs to investigate limitations of the SPS (IBS, DQSC) with the nominal beam scheduled MDs to investigate limitations of the LHC (collimators) with the nominal beam proposed/scheduled. In addition: Studies in view of the nominal LHC Ion beam in LEIR, Work on nominal scheme in the PS (resources ?) MDs to be planned for 2008 First LHC ion run with early scheme in 2009 LHC Machine Advisory Committee, Dec 8th, ‘06 C. Carli & D. Manglunki