SC-10 Oil Well Cements WG-08; Static Gel Strength Testing

Slides:



Advertisements
Similar presentations
2007 CAH HF Program Group 2 Roadmap Next Steps for Phase II January – March 2007 JANFEBMARAPRMAYJUNJULAUGSEPOCTNOVDEC Engage Internal Stakeholders Plan/Educate.
Advertisements

1 Introductions and Review of Agenda Lester McKee (Chair) Sources Pathways and Loadings Workgroup December 8, 2008 Item #1.
Copyright Reserved GreenTech Malaysia PROJECT:IGEM 2013 REPORTING PERIOD: AUG Project Brief/Summary The region’s largest green technology and eco.
Dynamic Settling/Stability Workgroup – Summer 2013
2013 Exploration & Production Standards Conference Subcommittee 10 June 25 & 26, 2013 Capitol Hyatt Regency Washington D.C.
HOW TO MAKE A CLIMATE GRAPH CLIMATE GRAPHING ASSIGNMENT PT.2.
1 As Class Convenes u Determine your team from the list at the front of the room u Find your team’s table; sit down & introduce yourself u Open up your.
Phase Shifts of Sinusoidal Graphs. We will graph sine functions of the following form: The amplitude A =  A  The period T = 22  The phase shift comes.
2015 Exploration & Production Winter Standards Meeting SC10 & SC13 Updates January 27-29, 2015 Intercontinental Hotel New Orleans, LA.
Part 2.  Review…  Solve the following system by elimination:  x + 2y = 1 5x – 4y = -23  (2)x + (2)2y = 2(1)  2x + 4y = 2 5x – 4y = -23  7x = -21.
Carleton College Science Building Addition & Renovation January 26, 27, 28 & 29, 2015 © Copyright EYP Architecture & Engineering. All rights reserved.
Status of Collaborative Team work on H.IDscheme, H.ID-RA and H.IRP Chiaki Ishikawa (TTC)
API S64, 3 rd Edition. 18 Dec 2013 Update. API S64 Chair – Tony Hogg Co-Chair – Open Current Edition – 2nd Edition, November 2001 Listing of Meetings.
Progress update on developing Health Sector Strategic Plan (HSSP IV) Joint Annual Health Sector Review Technical Review Meeting Wednesday 5 th.
WLE Operations Team Planning Meeting 2 nd February 2015, Water’s Edge.
This is an example text TIMELINE PROJECT PLANNING DecOctSepAugJulyJuneAprilMarchFebJanMayNov 12 Months Example text Go ahead and replace it with your own.
2015 Exploration & Production Standards Conference Subcommittee 10 June 23-25, 2015 Hyatt Regency San Francisco, CA.
Implementing SB 1525: An Update Cheyenne Walsh Squire Sanders (US) LLP Government Finance Officers Association of Arizona Winter Conference Prescott, Arizona.
Subcommittee on Oil Well Cements (SC10) Wednesday June 18 th, 2014: General Meeting  Publication of API Specification 10A “Cements and Materials for Well.
LINE GRAPHS HOW TO BE SUCCESSFUL WITH GRAPHING!.
This is an example text TIMELINE PROJECT PLANNING DecOctSepAugJulyJuneAprilMarchFebJanMayNov 12 Months Example text Go ahead and replace it with your own.
TST WG Progress Report at TP #20 Group Name: TP Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP20, Item.
Copyright Reserved GreenTech Malaysia PROJECT: MyHIJAU LABELLING REPORTING PERIOD: 1 – 31 AUGUST Project Brief/Summary MyHIJAU Labelling is a program.
SMIng 55th IETF Chair: David Durham. Agenda Agenda bashing; All; 5 mins. Status update; Chair; 15 mins. Charter & milestone revision discussion; Chair;
SRG Gantt Chart Template
2017 Exploration & Production Winter Standards Meeting Subcommittee 10
IT Strategy Roadmap Template
Timeline Roadmap Template
Support- IRDiRC Proposed Work Plan And Communication Strategy
API SC 10, Work Group 3 Update:
Task Group API 19SS Sand Screens
2017 Exploration & Production Winter Standards Meeting
Student Assignment Review Advisory Committee
DG Environment, Unit D.2 Marine Environment and Water Industry
API S64 Summer Conference Update.
SC-10 Oil Well Cements WG-08; Static Gel Strength Testing Phase IV
How to improve learning and teaching? Updated version
2016 Exploration & Production Standards Conference Subcommittee 10
SOCIAL DIALOGUE TIMELINE
Due Dates subject to change. Watch for dashboard updates.
API SC 10, Work Group 3 Update:
2016 Exploration & Production Winter Standards Meeting Subcommittee 10
Expedited Policy Development Process on the Temporary Specification for gTLD Registration Data Name of Presenter Event Name DD Month 2018.
Sunnybrook Academic Family Health Team
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
TGac Status and Timeline
Next Steps Advisory group debrief call Circulate meeting summary
2016 Exploration & Production Summer Standards Conference
X Strengths Weaknesses Correct Answer Your Answer Question # Cross-Test Score Difficulty Subscore.
Back-End Payor Sub-Group
PLANNING LOOKING AHEAD…. Long Term Goals (Assigned to…)
Agricultural Marketing
Month Rainfall (mm) Temp Jan Feb March 34 April 38 May June July
Scatterplots, Association and Correlation
Illinois SMART School Academy
XRN Nov 19 Release - Status Update
Tuesday September 30-Friday October 3
XRN Nov 19 Release - Status Update
The future of education
2012 Safety Group Advantage Program Timeline
2012 Safety Group Advantage Program Timeline
XRN Nov 19 Release - Status Update
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
2013 Safety Group Advantage Program Timeline
PBIS Update January 2006.
XRN 4927 – MiR Drop 4 - Status Update
Student Assignment Review Advisory Committee
Calendar Overview – Phase I – REVISED April 2019
Presentation transcript:

SC-10 Oil Well Cements WG-08; Static Gel Strength Testing CSEOM – Winter Meeting - SAT Ramy Eid Work-Group Chair January 23, 2018

Update since Calgary – June, 2017 July 2017 – Contract API/NETL is approved and signed from API side – and waiting on NETL to sign. Aug 2017 – Initiated Phase IV-B testing amongst all labs. (10 labs participating – 1 new – Grace Instruments) Sept 2017 – Received 2 lab results - WG conference call for updates – let alone confirmation on NETL NDA’s Oct 2017 – Barbara received internal approval of funding (from DoE) towards SGS. (Still waiting on API contract) Nov 2017 – Ramy goes to Pittsburgh to meet NETL team and bring them upto speed on WG (since initiation) Dec 2017 – Received 3 more lab results for Phase IV-B. Working with NETL for 2018 Roadmap.

Phase IV-B Testing Guideline As a positive outcome from Phase IV, the WG decided to continue testing (Phase IV-B) - however this time, more monitored, eliminating some of the variables (psi, degF, conditioning, etc).. Same volumes of water/cement/batch used in Phase IV Test pressure to be set for 500 psi. Test Temp to be kept at ambient (or 80F) 3 tests; ATM Conditioning… Condition to ambient/80F temp in 20 min.. then transfer to SGS machine (temperature / pressure will be RAMPED up in 10 min, (JPT) – and then SGS-mode will initiate). 3 tests; In-machine Conditioning… will be done for 30 min where both temp and pressure will be ramped up (JPT) – and then SGS mode will initiate (**) JPT time will not be reported as part of SGS time Conditioning speed to be set for ALL machines (including SGSM) – at 150 rpm Do not alter current settings for SGS mode   ** In case of SGSA – the  “in-machine” conditioning will be substituted by “straight from blender” (as before)