SMPTE D-Cinema (21DC) Status Report IEC TC100 AGS Dallas meeting

Slides:



Advertisements
Similar presentations
What is problem-solving? A decision making process that uses data 1. Problem Identification 2. Problem Analysis 3. Plan Development 4. Plan Implementation.
Advertisements

SUPPORTED BY THE EUROPEAN UNION’S OBNOVA AND PHARE PROGRAMMES EIA TRAINING RESOURCE MANUAL FOR SOUTH EASTERN EUROPE Scoping.
Scoping in the EIA process Proposal Identification Screening
Process of Making Multimedia
Managing the Information Technology Resource Jerry N. Luftman
לירן קציר Connectivity in Computers IEC TC 57 - Power system management and associated information exchange Established in 1964 – with focus.
2013 Spring Business Meeting San Francisco, California WESTAR Planning Committee Report.
ETICS2 All Hands Meeting VEGA GmbH INFSOM-RI Uwe Mueller-Wilm Palermo, Oct ETICS Service Management Framework Business Objectives and “Best.
Yang Shi, Chris Elliott, Yong Zhang IETF 73 rd 18 Nov 2008, Minneapolis CAPWAP WG MIB Drafts Report.
SMPTE D-Cinema (21DC) Status Report IEC TC100 AGS Madrid meeting Hideki Ohtaka 26 April 2011.
Lead from the front Texas Nodal 1 Texas Nodal Energy Management System Requirement Documents December 5, 2006 Jay Dondeti EMS Project.
Introduction Project Management. Projects A unique process, consisting of a set of coordinated and controlled activities with start and finish dates,
SMPTE D-Cinema (21DC) Status Report IEC TC100 AGS Melbourne meeting Hideki Ohtaka 25 October 2011.
Instructions[delete this after reading] Use Title and #hashtag slide [next] — insert your event title Use appropriate Theme slide, Partner slide — delete.
Additional Clauses For Consideration To TC100 Guidelines and Procedures Based on Stage 0 Project on Audio, Video, and Multimedia Systems and Equipment.
AMENDMENTS TO CDRH LASER STANDARD. TEPRSSC ‘99 Revisited. Presentation Summary. Discussion Summary.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
Successfully Managing Customer Expectations Change is expected to occur during the life of any project, but this change must be controlled and managed.
8.04 Utilize project-management skills to start, run, and end projects
Devin Rauss Building California’s Flexible Grid October 27, 2018
ISO/IEC JTC 1/SC 7 Working Group 42 - Architecture Johan Bendz
GCSE REVISION LEADING FOR THE GEOGRAPHY GCSE EXAMINATION
Resolution CEN/TC 154/SC6 234/2005 (Bratislava)
EVALUATION RESEARCH Research Methods
OASIS Electronic Trial Master File Standard Technical Committee Meeting Agenda June 20, :00 – 9:30 AM PDT.
SC 6 Task Group 1 Pipeline and Valve Standards Status Report
Accredited Standards Committee C63® - EMC
Requirement Change Control Procedure
3.01 Understand Diagnostic and Therapeutic Services
Objective 3.01 Understanding Diagnostic and Therapeutic Services
Mastering Change Control
Project Plan Template (Help text appears in cursive on slides and in the notes field)
<month year> doc.: IEEE < e> <May 2018>
IEEE SC 2 May 12, 2014 Robert Konnik
Management Frame Protection Study Group Request
Presenter: Peter Heidrich, FRCC – BES Drafting Team Chair
CLINICAL INFORMATION SYSTEM
Joint WG on Guidance for an Integrated Transport and Storage Safety Case for Dual Purpose Casks TM TM to Produce Consolidated Drafts of the IAEA’s.
Objective 3.01 Understanding Diagnostic and Therapeutic Services
Research and Test Reactor Safety: The Regulatory Perspective
<month year> doc.: IEEE < e> <May 2018>
CIS work programme Ad-hoc activity on Economics
Data Management Planning
Project Management Process Groups
SMPTE D-Cinema (21DC) Status Report IEC TC 100 AGS Berlin meeting
Presentation title Date of presentation.
doc.: IEEE <doc#>
Management Frame Protection Study Group Request
CS577a Software Engineering ARB #2 Workshop
Objective 3.01 Understanding Diagnostic and Therapeutic Services
Lesson 10: IT Project and Program Management
Proposed Specification Framework for TGac – Introductory Comments
5/6/2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Response to WG request regarding TC ERM requested.
5/12/2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Response to WG request regarding TC ERM requested.
Objective 3.01 Understanding Diagnostic and Therapeutic Services
Objective 3.01 Understanding Diagnostic and Therapeutic Services
Hydrographic Services and Standards Committee
$25,000 Pyramid Game.
Objective 3.01 Understanding Diagnostic and Therapeutic Services
Objective 3.01 Understanding Diagnostic and Therapeutic Services
9th meeting of the Expert Group on Reporting (22 March 2011)
Beyond SMPTE Time Code The TLX Project.
TC 310 The Computer in Technical Communication
IEEE RS Standards Status and Descriptions
ma to NesCom Bob Heile Chair, IEEE802.15
ma to NesCom Bob Heile Chair, IEEE802.15
Response to PAR/CSD Comments Bob Heile Chair, IEEE
Ad Hoc Team (AHT) Lifecycle
Presentation transcript:

SMPTE D-Cinema (21DC) Status Report IEC TC100 AGS Dallas meeting Hideki Ohtaka 15 May 2012

Recent work & Topics High Frame Rates for 3D / 2D D-Cinema (Study Group) Project scope - Create a report describing the elements of the D-cinema distribution system impacted by high frame rate - Recommend new and possible modified standards Short term work in progress Evaluate the feasibility of high frame rate playback on existing equipment Long term work in progress Evaluate compression bit rates to ensure there are no visible artifacts

Documents in Publication Cycle Documents published since last report Suite Number Title DCP D-Cinema Packaging ST 430-5 DCP – Security Log Event Constraints Amendment ST 429-2 DCP – Operational Constraints Revision Note) ST xxx: SMPTE standard