NAVSEA 05L4 Damage Control USS COLE DDG67
Mess Decks MAIN DECK Frame 220 Looking forward on Mess Decks
MAIN DECK Frame – 220 Port side Looking forward Mess Decks
Galley MAIN DECK Frame 215 Looking into Galley
MAIN DECK Frame 215 Looking Stb to Port At serving line
MAIN DECK Frame 206 DCRS 5 DCRS 5
Looking Aft on Port side Galley CPO Mess MAIN DECK Frame 174 Looking Aft on Port side
Galley CPO Mess MAIN DECK Frame 174 Looking aft
Into Oil Lab and General Galley CPO Mess MAIN DECK Looking down into The access 2-183-2-T Into Oil Lab and General Work shop access
Galley CPO Mess CPO MESS Frame 174 Looking outboard Towards port side
Shop is normally at waterline, after blast 3’ of water in space General Workshop Port side Ground ZERO for blast Shop is normally at waterline, after blast 3’ of water in space HT Shop
HT Shop
MER1 Upper level SCU 1
MER1 Frame 219 Looking aft by General Workshop
MER1 Port side Between HT shop And air lock
MER1 Mid level Looking towards aft
Looking towards port side Supply Support Looking towards port side Frame 220 Supply Support MER 1
MER 2 OVBD valve removed Hole cut in Hull To dewater Supply MER2 MER 1
MER1 Lower level Looking Aft towards Escape trunk
AUX2 Frame 220 Port side AUX 2 MER 1
MER 2 STB shaft at Bulkhead seal to AUX 2 AUX 2 MER 1 MER2
MER 2 STB shaft at Bulkhead seal to AUX 2 AUX 2
MER 2 STB shaft at Bulkhead seal to AUX 2 AUX 2 MER 1