802.11 TGn Editor Report Sept 2007 Date: 2007-09-12 Authors: Sept 2007 May 2006 doc.: IEEE 802.11-06/0528r0 Sept 2007 802.11 TGn Editor Report Sept 2007 Date: 2007-09-12 Authors: Adrian Stephens, Intel Corporation Bruce Kraemer, Marvell
May 2006 doc.: IEEE 802.11-06/0528r0 Sept 2007 Abstract This document summarises editorial activities on the TGn Draft since the July 2007 meeting Status of D2.07 Guidelines to submission authors - new Status of ad-hocs and assignments D3.0 process and timing Editorial motions A lot of this submission is similar to previous sessions, and is provided for reference only. Adrian Stephens, Intel Corporation Bruce Kraemer, Marvell
Acknowledgements PHY co-editor Working draft D2.06 review John Ketchum May 2006 doc.: IEEE 802.11-06/0528r0 Sept 2007 Acknowledgements PHY co-editor John Ketchum Working draft D2.06 review Volunteer review panel, consisting of: Bjorn Bjerke, Bruce Kraemer, Eldad Perahia, George Vlantis, Solomon Trainin, Tomoko Adachi, Yuichi Morioka, Matt Fischer Adrian Stephens, Intel Corporation Bruce Kraemer, Marvell
May 2006 doc.: IEEE 802.11-06/0528r0 Sept 2007 LB97 Documents TGn DRAFT and redlines (members’ area of 802.11 website) Draft-P802.11n D2.07.pdf 11-07-2387-00-000n TGn redline D2.07 CMP D2.05 insertions.pdf 11-07-2388-00-000n TGn redline D2.07 CMP D2.05 insertions & deletions.pdf Word conversion Not available. If anybody needs big tables in word format, ask. LB97 implemented resolutions 11-07-0366-07-000n-tgn-lb97-editor-comments.xls LB97 composite comments (all ad-hocs) 11-07-0336-07-000n-tgn-lb97-comments.xls Adrian Stephens, Intel Corporation Bruce Kraemer, Marvell
Draft Numbering History (D2.0+) May 2006 doc.: IEEE 802.11-06/0528r0 Sept 2007 Draft Numbering History (D2.0+) D2.0, February 2007 TGn and WG approved draft for balloting D2.01-D2.02, April-May 2007 D2.02 approved by TGn D2.03, D2.04, D2.05 June-July 2007 D 2.05 approved by TGn D2.06, Aug 2007 Draft for editorial panel review D2.07, Sept 2007 Current reviewed draft Contains some EMR resolutions (D2.08, Sept 2007) Following discussion and resolution of EMR comments draft will be updated to agree with outcome TBD - Will ask for draft to be approved by TGn (D3.0, Sept 2007) Draft for Letter Ballot Adrian Stephens, Intel Corporation Bruce Kraemer, Marvell
Process for Draft D2.07 Working version D 2.06 Review D2.07 May 2006 doc.: IEEE 802.11-06/0528r0 Sept 2007 Process for Draft D2.07 Working version D 2.06 The 778 approved technical resolutions were (attempted to be) implemented This working draft and the comment resolutions/edit notes were sent to review Review A review panel of volunteers checked resolutions/edit notes against draft D2.06 and reported any defects of editing A total of 86 defects were reported D2.07 The defects were addressed by editing the TGn draft and updating the comment resolutions/edit notes Unapproved Draft 2.07 was released and the edit notes in 11-07-0366 were published in early September Adrian Stephens, Intel Corporation Bruce Kraemer, Marvell
Status of comments approved in May doc.: IEEE 802.11-06/0528r0 Sept 2007 Status of comments approved in May Status as in 11-07-0366-07-000n-tgn-lb97-editor-comments.xls In tab “Edited in D2.06” EI (implemented as specified in the resolution): 90 EM (edited with modifications noted in the editor’s notes): 43 Resolution of conflicts Editorial changes – e.g. terminology, grammar EN (nothing to do - covered by another resolution): 469 e.g. when the same resolution is cut and paste to multiple resolutions Recycled comments (now owned by own ad-hocs): EMR (edit with mods, recycle - speculative edits require consideration by TGn): 21 ER (recycle - could not action resolution): 5 e.g. conflict with no obvious resolution that keeps the intention of the resolution Or, the editor’s can’t understand how to implement the resolution Doesn’t include 2 comments recycled earlier in the process to the Coex group In tab “Approved Rejects” All approved rejects (181 technical approved in Sept) A “reject” comment implies no work for the editor! Nothing entered in “edit status/notes” for these comments Adrian Stephens, Intel Corporation Bruce Kraemer, Marvell
Guidelines for Submission Authors May 2006 doc.: IEEE 802.11-06/0528r0 Sept 2007 Guidelines for Submission Authors Use the latest available draft (D2.07) If your submission is based on an earlier draft – revise it now Pay attention to the CID “flags” (e.g., #1234) in nearby text. Check that your proposed resolution does not create a conflict. If it does, provide a new resolution for that CID. Clearly highlight in your submission any editing instructions Some submissions have mixed editing instructions with comment resolutions (e.g. “Accept”) and some edits were missed in D2.06 as a result Use TGn Editor for edit instructions to me, and colour highlight/fill table cells that imply any further editing. I need all actions to be taken by me to be painfully obvious. Stick to the standard editing instructions: Delete, Insert, Change (followed by change-marked text). Change tracking has been used for multiple purposes in the same submission (i.e., showing edits following a “change” instruction, and showing the history of changes in the submission.) This creates ambiguity and possible conflict. Be consistent – either use change tracking to show edits, or use it to show the history of changes in a submission – but not both! Adrian Stephens, Intel Corporation Bruce Kraemer, Marvell
Editorial activities this week May 2006 doc.: IEEE 802.11-06/0528r0 Sept 2007 Editorial activities this week Motion to resolve two CIDs transferred to EDITOR TBD - Update the draft to reflect the resolution of the EMR comments TBD - Issue D2.08 in time for voting this session TBD - Motion to approve D2.08 Adrian Stephens, Intel Corporation Bruce Kraemer, Marvell
Summary of the status of the ad-hoc groups May 2006 doc.: IEEE 802.11-06/0528r0 Sept 2007 Summary of the status of the ad-hoc groups Sept 12th Sept 17th Adrian Stephens, Intel Corporation Bruce Kraemer, Marvell
Current Assignees Sept 2007 May 2006 doc.: IEEE 802.11-06/0528r0 Adrian Stephens, Intel Corporation Bruce Kraemer, Marvell
May 2006 doc.: IEEE 802.11-06/0528r0 Sept 2007 D3.0 Process & Motion We are operating as a comment resolution group in recirculation – i.e., we approve changes/resolutions, not drafts. There may be (TBD) a requirement to have a procedural confirmation ballot because of lack of quorum at this meeting. Motion: “approve the comment resolutions in document 11-07/0336rX, instruct the TGn editor to prepare draft D3.0 and send D3.0 to working group letter ballot when ready asking the question ‘Shall this draft be sent to sponsor letter ballot?’” Adrian Stephens, Intel Corporation Bruce Kraemer, Marvell
D3.0 Timing Caveats: 15-day Confirmation Ballot required May 2006 doc.: IEEE 802.11-06/0528r0 Sept 2007 D3.0 Timing Caveats: 15-day Confirmation Ballot required Continuous review process Adrian Stephens, Intel Corporation Bruce Kraemer, Marvell
Continuous review process May 2006 doc.: IEEE 802.11-06/0528r0 Sept 2007 Continuous review process Two editors Four reviewers Continuous review and feedback of defects Offline process operated across 4 timezones Goal: no review delay, editing defects identified and resolved Adrian Stephens, Intel Corporation Bruce Kraemer, Marvell
May 2006 doc.: IEEE 802.11-06/0528r0 Sept 2007 Editorial Motion #1 Move to accept the comment resolutions in document 11-07/0366r7 on the “Transferred” tab. Adrian Stephens, Intel Corporation Bruce Kraemer, Marvell
May 2006 doc.: IEEE 802.11-06/0528r0 Sept 2007 Editorial Motion – TBD Move to approve IEEE P802.11n D2.08 as the TGn draft Yes No Abstain Adrian Stephens, Intel Corporation Bruce Kraemer, Marvell