Txdot field inspection

Slides:



Advertisements
Similar presentations
MATERIALS ACCEPTANCE. LPA Construction chapter -2 paragraphs on -Materials Quality Control -Materials Finalization -andAppendix J -LPA materials acceptance.
Advertisements

Construction Contracting
GEORGETOWN COUNTY STORMWATER DIVISION Breakfast Series #3 How to Prepare a Stormwater Pollution Prevention Plan January 14, 2009.
DISTRICT FIVE CONSTRUCTION CONTRACT ADMINISTRATION UPDATE TRAINING Submission of Working Schedule Specification SP A.
District 8-0 QA Review Trends Summary Documentation and Certification Project certifications for materials should be reviewed as they.
Project Startup Hmwk Due 10/11/ # 1,3,7,8 8.9 #1 9.7 #1,3,4,5, #1,2,3,4,10.
Activities CTC-415. Activity Consumes Time Usually consumes resources (cure time for concrete) Definable start and finish Assignable – V. important –
SIGN MANAGEMENT UPDATE Tracy Nowaczyk Pavement Management and Operations Section Engineer Meeting Fall 2013.
Office of Traffic, Safety and Technology Module 6 Specifications and Special Provisions Traffic Control Plan Development Course.
2015 Traffic Signals 101 Topic 12 Special Provisions.
SPDES General Permit for Stormwater Discharges During Construction Activity GP Mike Jurkowski, CPESC, NYSDOT - Summary of Changes From GP
Overview of Environmental and Social Safeguards Environmental Management Plan Checklist for Simple Civil Works Zagreb, May 6-8, 2009 Presenter: Natasa.
Jason Martin February 2013 Design Section Engineer’s Manual 1.
PUBLIC WORKS DEPARTMENT Environmental Streamlining Taskforce Meeting July 20, 2011.
Project Diary Missouri Local Programs How to Develop and Use the Daily Diary and Payment Diary for LPA Inspectors.
Mn/DOT AUDIT COUNTY HIGHWAY ACCOUNTANTS SINGLE AUDIT DISCUSSION.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Pacific Air Forces 1 Preconstruction Orientation HQ PACAF/LGC.
VI. Developing a VSMP Program General Stormwater Training Workshop.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Construction Notes Amer Bata, Area Construction Manager.
Project Schedules The Cabinets New Categories of Scheduling.
Maintenance Specifications For Jan and beyond.
Managing Construction Chapter 16. Contractor Projects are overseen by a contractor who owns and operates a construction company. Projects are overseen.
Office of Traffic, Safety, and Technology February 2012 Arden Hills, Minnesota Minnesota DOT Intelligent Transportation Systems Project Management Design.
MnDOT Intelligent Transportation Systems Project Management Design Course Section 5: Special Provisions.
Resident Engineer Panel Discussion Jack Stone, P.E. District 2 Engineer, Casper Chad Aagard, P.E. District 2 Engineer, Casper Pete Hallsten, P.E. District.
An Overview Of The MBP CM Leadership Manual Presented by: Robert J. Carter, CCM Robert M. Pfeiffer, CCM.
ITS Device Standards & Procurement Project PURPOSE  Develop a series of Standards & Strategies designed to guide and provide consistency across the development.
PROJECT DEATH Stephanie Rich. Corrective Work Punch List Punch List Work Complete Date Work Complete Date Request Final(s) Request Final(s) Comprehensive.
CONDUCTING BUSINESS WITH THE TOWN OF MIAMI LAKES Construction Services October 28, 2013.
May 4, 2011 Jenefer Youngfield Utah State Office of Education Utah K-12 Public School Construction Education and Training.
MnDOT AUDIT 2016 COUNTY HIGHWAY ACCOUNTANTS CONFERENCE ANNUAL FEDERAL CITY COUNTY AUDIT DISCUSSION.
IT-4135/EN Supply of Air Handling Units for Industrial HVAC Projects at CERN Technical Specification Paul Pepinster / EN-CV.
ALL GROWN UP PROJECT ADULTHOOD Matt Looney Section Engineer’s Meeting Spring 2014.
SCHEDULE MANAGEMENT MODULE 8. Required by Specification City/Caltrans Level 1 schedule – simple Less than $1 million, less than 100 working days Advanced.
QUALITY ASSURANCE MODULE 3. Definitions Quality Assurance - A process/effort that ensures that processes are followed, that the processes of doing right.
Class Synopsis This presentation will summarize the oil and gas well supplements, proration schedule, and online research queries associated with the Well.
Installation Procurement Package
OFFICE OF THE CITY CLERK OCTOBER 24, 2016 CALLING OF THE MARCH 7, 2017 CITY AND PUSD CONSOLIDATED PRIMARY NOMINATING ELECTION AND THE APRIL 18, 2017.
Chapter 8 Specifications & Special Provisions
Inspector's Role and Responsibilities
Administration of a FIDIC Contract - Project Control
INSPECTION POLICIES AND, PROCEDURES CLASS A CERTIFICATION REQUIREMNTS
Bidding resources CIP Workshop 2/23/2017.
Inspector's Role and Responsibilities
CONTRACT DOCUMENTS & CONSTRUCTION
Chapter 8 Specifications & Special Provisions
* Topic 12 Special Provisions
Grant Orientation Session
TPDES Construction Management at the City of Laredo
Inspector's Role and Responsibilities
State Aid Construction
Community Aids Reporting System (CARS): Federal Reporting Requirements
Quality Management Systems – Requirements
Classroom Enclosure – Phase II Bonnie Beard Agriculture Center
FBC Code Development 6th Edition (2017).
Uploading Data in the Staff Interchange
Administrator of Construction Todd Wilson Senior Project Manager
General comments: These projects are locally owned and the LPA should be involved and informed throughout the project. The project agreement is between.
OFFICE OF THE CITY CLERK OCTOBER 24, 2016 CALLING OF THE MARCH 7, 2017 CITY AND PUSD CONSOLIDATED PRIMARY NOMINATING ELECTION AND THE APRIL 18, 2017.
Prime Contractor Performance
Emulsion Task Force (ETF) Meeting
Grant Orientation Session
IT OPERATIONS Session 7.
Filing the FCC Form 470 Special thanks to Julie Trent Schell (E-rate PA) and Anne Perloff (E-rate ME)
State Aid Construction
Construction Management Services April 16, 2018
Diversity management system (DMS)
Curricular Practical Training
Business & Finance Policies & Procedures Training
Presentation transcript:

Txdot field inspection Jimmy Davis & Gerald Waltman 6/20/19

TxDOT Field Inspection 1 Safety 2 SW3P (Storm Water Pollution Prevention Plan)

Safety Something Everyone Can Live With

SAFETY Traveling Public & Worker Safety Traffic Control Dallas District S.O.P. Worker Safety Proper PPE Housekeeping General Appearance of Project (Safety and SW3P)

SAFETY

SAFETY

SW3P Storm Water Pollution Prevention Plan Inspection Form 2181 Low: Address within 7 days or before next rain event. Medium: Address as soon as practical or as directed. High: Must be addressed immediately, all work to cease until corrections are made.

SW3P

SW3P

SW3P

TxDOT FIELD INSPECTION OF CONSTRUCTION 1 Spec. Book 2 Plans 3 General Notes 4 Proposal 5 Shop Drawings 6 Materials 7 Communication

TxDOT FIELD INSPECTION OF CONSTRUCTION Spec. Book STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MAINTENANCE OF HIGHWAYS STREETS, AND BRIDGES Current Version Adopted November 1, 2014 Contains: Description, Materials, Construction, Measurement, Payment Online version can be found online at: https://www.txdot.gov/business/resources/txdot-specifications.html Read and understand applicable specs to work being performed

TxDOT FIELD INSPECTION OF CONSTRUCTION Plans: Table of contents Project Layout Quantity summaries for project items Traffic Control Plan / Project Phasing SW3P May contain notes or specifics that are not found in the Spec. Book May contain Miscellaneous Standards that apply to certain areas of work specifically for that project Typical TxDOT Standards

TxDOT FIELD INSPECTION OF CONSTRUCTION General Notes: General Notes are found in the Proposal as well as in the Plans. District specific details Will contain information specific to that item number. Information pertains to methods, payment, materials, etc. This information is not found in the Spec Book.

TxDOT FIELD INSPECTION OF CONSTRUCTION General Notes

TxDOT FIELD INSPECTION OF CONSTRUCTION General Notes Date

TxDOT FIELD INSPECTION OF CONSTRUCTION Proposal Schedule of Bid Items Contains Project General Notes per Item Number List of all Specifications and Special Provisions applicable to that project Contains Special Provisions per item number that override Spec Book sections as noted Contains Special Specifications

TxDOT FIELD INSPECTION OF CONSTRUCTION

TxDOT FIELD INSPECTION OF CONSTRUCTION Hierarchy : Special Specs /Special Provisions Plans & General Notes Standard Specifications (Spec. Book)

TxDOT FIELD INSPECTION OF CONSTRUCTION Shop Drawings 2014 Spec. Book Article 5.2 Supplements the plans with necessary details not included in contract plans

TxDOT FIELD INSPECTION Material Producer List https://www.txdot.gov/inside-txdot/division/construction/producer-list.html Each file contains: Products Materials Manufacturers Producer Codes Files are updated often

TxDOT FIELD INSPECTION OF CONSTRUCTION Have a schedule 2014 TxDOT Spec. Book article 8.5.5 Preliminary Schedule: submitted 7 days before Preconstruction Meeting. Baseline Schedule: develop and submit within first 45 calendar days from the work start date. Progress Schedule: submit monthly no later than the 20th calendar day of the following month. Some Districts may differ on Progress submission date

TxDOT FIELD INSPECTION OF CONSTRUCTION Communication Daily Schedule (Provide the day before) Talk to TxDOT Inspector Discuss expectations Discuss potential issues Notify of any change of daily plan

Summary Know Your Project Have a set of Plans/Proposal Know what kind of Certification is needed (example: flagging) Approved Materials: https://www.txdot.gov/inside-txdot/division/construction/producer-list.html Approve submittals (mix designs, shop drawing) Have a schedule: 2014 TxDOT Spec. Book 8.5.5 Preconstruction Meeting: Encourage for everyone to go

TXDOT Contact Jimmy Davis (214) 320-4409 Jimmy.Davis@txdot.gov Gerald Waltman (972) 542-2345 Gerald.Waltman@txdot.gov

Questions?? Thank you