THEMIS Introduction Nov 6, 2007.

Slides:



Advertisements
Similar presentations
THEMIS & RHESSI NRC Irvine 2/01/2005 RHESSI and THEMIS PI Mode Experience Feb
Advertisements

SMART About NASA’s Magnetospheric Multiscale Mission (MMS) MAGNETIC RECONNECTION is a little-understood physical process at the heart of space weather.
THEMIS INSTRUMENT PER 1 UCB, May, 2005 EMC / Mag Instrument Test Plan & Results Michael Ludlam University of California - Berkeley.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Integration and Test Critical Design Review Rick Sterling University of California – Berkeley Thm_CDR_IT_Revc.
AIAA Panel on Small, Distributed, Fractionated Spacecraft 1 Long Beach, CA Sept. 18, 2007 Introduction THEMIS Overview Lessons Learned Importance of a.
THEMIS FRRSC - 1 KSC, Feb 12, 2007 SPACECRAFT OVERVIEW/STATUS Peter R Harvey THEMIS Project Manager.
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
THEMIS-SCM THM – SCM – CDR – 08-April-2004 in Velizy
THEMIS/GBO CDR Peer Review 1 Univ.of Calgary, Apr , 2004 Ground Based Observatories (GBO) CDR Peer Review S. B. Mende University of California -
National Aeronautics and Space Administration Goddard Space Flight Center MISSION READINESS REVIEW THEMIS Cynthia M. O’Carroll GSFC Public Affairs Office.
THEMIS SRR Requirement Overview - 1 UCB, 07/08/2003 REQUIREMENT DEVELOPMENT OVERVIEW Ellen R. Taylor Mission Systems Engineer Space Science Laboratory.
4 th NASA Space Weather & Robotic Mission Operations Workshop, NASA/GSFC, Greenbelt, MD, September 27, THEMIS Operations & Anomalies Manfred Bester.
STEREO - Solar Terrestrial Relations Observatory Mission STEREO STEREO Science Team Meeting May 2, 2005 Presented by Edward Reynolds APL STEREO Project.
THEMIS : RESOLVING THE PHYSICS OF ONSET AND EVOLUTION OF SUBSTORMS OBJECTIVE: Study energy releases from Earth’s magnetosphere known as substorms (magnetic.
Aurora, Substorms, and THEMIS D. G. Sibeck NASA/GSFC THEMIS Project Scientist.
FM4/FM5 PSRSCM - 1UCB, May 5 th, 2006 THEMIS FM4/FM5 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) SEARCH COIL MAGNETOMETER (SCM) Michael Ludlam University of.
THEMIS INSTRUMENT TEST REVIEW 1 UCB, December 9, 2004 THEMIS Instrument Test Review Instrument Verification Program Overview Ellen Taylor University of.
Polar Gateways 2008THEMIS Constellation Operations − Jan 2008 THEMIS Constellation Operations Dr. Manfred Bester University of California at Berkeley.
1 THEMIS Inner Magnetosphere Review, Dec 20, 2008 Summary of THEMIS results in the inner magnetosphere Future mission operations discussion: –Science targets.
THEMIS SRR MO-1UCB, July 8-9, 2003 THEMIS Mission Overview Peter R. Harvey Project Manager Space Sciences Laboratory University of California, Berkeley.
THEMIS Mission PDR/CAR 1 UCB, November 12-14, 2003 Instrument Integration & Test Dr. Ellen Taylor University of California - Berkeley.
TIM 1 UCB, 8/15/2007 Electric Field and Waves Instrument (EFW) Technical Interchange Meeting Dr. John Wygant, UMN Dr. John Bonnell, UCB Peter Harvey, UCB.
THEMIS Project Management 1 UCB, June 14-16, 2004 THEMIS Mission CDR Project Management Peter R. Harvey University of California - Berkeley.
Magnetospheric MultiScale Mission (MMS) Overview
ARTEMIS from a Planetary Perspective 1 September 9, 2008 THEMIS Extended Phase = THEMIS baseline + ARTEMIS Vassilis Angelopoulos, and the ARTEMIS team.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Overview and Status Keith Goetz University of Minnesota.
Mission Operations –Launch February 15, 2000 at 22:02:15 UTC = 14:02:15 PST –41 Days IOC and antenna deployment period –2 year science mission operations.
THEMIS MCRR GSFC 2/4/2004 THEMIS Mission Confirmation Readiness Feb
THEMIS/GBO 1 Banff, March 29, 2006 Agenda – GBO Review.
EGU General Assembly 2006, 2-7 April, 2006, Wien ST6 Multi-point measurements of solar-terrestrial plasma: results and future perspectives Scientific objectives.
LiteBIRD US Team Meeting 10/13/2015 Team Meeting at UCB SSL1 Intro to SSL.
THEMIS INSTRUMENT PDROVERVIEW- 1 UCB, October 15, 2003 THEMIS SYSTEM OVERVIEW Dr. Vassilis Angelopoulos, Science Overview Dr. Ellen Taylor, Mission and.
S. Frey, UCB, THEMIS 1 25th ISSFD, Munich, Germany, Oct.19-23, 2015 ARTEMIS THEMIS ARTEMIS The Revised Concept of the THEMIS and MMS Coordination Sabine.
SWGTemplate- 1 UCB, Nov 15/16, 2006 THEMIS SCIENCE WORKING TEAM MEETING Search Coil Magnetometer (SCM) team Co-i: A. Roux, O. Le Contel Technical Manager(*):
SWT Overview 1 UCB, Nov15/16, 2006 THEMIS SCIENCE WORKING TEAM MEETING Mission Overview Peter R. Harvey Project Manager University of California - Berkeley.
FM1 Instrument Suite Pre-Ship Review (PSR)INT- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) INTEGRATION AND TEST PLANS Jeremy.
How ARTEMIS Contributes to Key NLSI Objectives C.T. Russell, J. Halekas, V. Angelopoulos, et al. NLSI Lunar Science Conference Ames Research Center Monday,
THEMIS MPDR / CAROR-1UCB, November 12-14, 2003 THEMIS T IME H ISTORY OF E VENTS AND M ACROSCALE I NTERACTIONS DURING S UBSTORMS RESOLVING THE MYSTERY OF.
FM2/FM3 PSR FM4/FM5 PERSCM - 1UCB, November 10, 2005 THEMIS FM2/FM3 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) THEMIS FM4/FM5 INSTRUMENT SUITE PRE- ENVIRONMENTAL.
SPACECRAFT OVERVIEW/STATUS
THEMIS MRRI&T − 1GSFC, January 5, 2007 Integration and Test.
PARTNER / MAJOR CONTRACT Swales Aerospace MISSION MANAGER Frank Snow PRINCIPAL INVESTIGATOR Vassilis Angelopolos (UCB) UPN: Time History of Events.
MPEREnvironmental Test OverviewUCB, June 23, 2006 THEMIS MISSION PRE-ENVIRONMENTAL REVIEW Environmental Test Overview and Logistics Rick Sterling University.
THEMIS Instrument Pre-Environmental Review 1 UCB 5/02/2005 THEMIS Instrument Pre-Environmental Review Project Status May 2, 2005 Peter R. Harvey THEMIS.
Lessons Learned Project Overview 1 Jan 29, 2008 THEMIS Introduction Jan 29, 2008.
THEMIS MRRSystems - 1 GSFC, Jan 5, 2007 Systems Engineering.
FM1 Instrument Suite Pre-Ship Review (PSR)AGENDA 1 UCB, September 21, 2005 THEMIS T IME H ISTORY OF E VENTS AND M ACROSCALE I NTERACTIONS DURING S UBSTORMS.
FM1 Instrument Suite PSRSCM - 1UCB, September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) SEARCH COIL MAGNETOMETER (SCM) Michael Ludlam.
FM4/FM5 IPSRSYS - 1 UCB, May 5, 2006 THEMIS INSTRUMENT SUITE FM4/FM5 PRE-SHIP REVIEW SYSTEM OVERVIEW Ellen Taylor University of California - Berkeley.
THEMIS Mission PDR/CAR 1 UCB, November 12-14, 2003 THEMIS Confirmation Assessment Project Overview Peter R. Harvey University of California - Berkeley.
FDMO Peer Review RFA Summary
THEMIS THEMIS MPDR Nov 12-14, 2003 University of California, Berkeley
UCLA Support for THEMIS
FIELDS Mission Assurance Manager University of California, Berkeley
Spacecraft Interface and I&T
Solar Probe Plus FIELDS
INSTRUMENT DATA PROCESSING UNIT (IDPU)
THEMIS MISSION PRE-SHIP REVIEW
Mission overview: two spacecraft that target key radiation belt regions with variable spacing
University of California - Berkeley
THEMIS THEMIS SRR July 8-9, 2003 University of California, Berkeley
Project Overview and Status
THEMIS Mission Confirmation Readiness
THEMIS program: an Overview
ACS UC Berkeley Space Sciences Laboratory
SDO Flight Dynamics Subsystem
THEMIS First Results and near future
THEMIS baseline + ARTEMIS
Response to Comment on “Tail Reconnection Triggering Substorm Onset”
Presentation transcript:

THEMIS Introduction Nov 6, 2007

Agenda Agenda Organization Schedule Mission Implementation Mission Objectives Organization Schedule Mission Implementation S/C & Instrument Description Ground Systems Mission Operations

Substorms

Earth and Space Platforms Aurora Current disruption Reconnection

Organization Program Organization PI Mode Cost and Schedule Caps PI Team Provides Space, Ground, Data Segments PI Team Provides Cost, Schedule, Performance Assurance PI Team Provides Education/Public Outreach Cost and Schedule Caps Single Cost Cap for the Mission $180M (FY07) Launch no later than March 2007 (Launch Feb 2007) Performance Assurance MIDEX Quality Requirements Implementation Strategy Use Heritage Instrumentation Coordinate Common Buy Parts Keep Probe/Probe Carrier Simple and Robust Leave Complexity on the Ground Build & Verify Probe 1, then Probes 2-5

Mechanical/ Thermal Systems Organization Mission Manager Frank Snow, GSFC Financial Mgr K. Harps, UCB Launch Vehicle G. Skrobott, KSC Project Scientist D. Sibeck, GSFC THEMIS PI V. Angelopoulos, UCB Project Manager P. Harvey, UCB Science Co-I’s EPO N. Craig, UCB Subcontracts J. Keenan, UCB Scheduling D. Meilhan, UCB Quality Assurance R. Jackson, UCB Mission Systems E. Taylor, UCB Mechanical/ Thermal Systems P. Turin, UCB C. Smith, UCB Mag Cleanliness C. Russell, UCLA Probe/Probe Carrier Management UCB Oversight: D. King Swales Mgr: M. Cully Instruments P. Berg, UCB Operations M. Bester, UCB Software Systems D. King, UCB Mission I&T J. McCauley, UCB R. Sterling, UCB

Organization Instruments P. Berg Electric Field Instrument (EFI) J. Bonnell Electrostatic Analyzer (ESA) C. Carlson Solid State Telescope (SST) D. Larson Data Processor Unit (IDPU) M. Ludlam Fluxgate Mag (FGM) U. Auster Search Coil (SCM) A. Roux Forrest Mozer Greg Delory Art Hull Bill Donakowski Greg Dalton Robert Duck Dan Schickele Stu Harris Hilary Richard Robert Abiad Peter Berg Heath Bersch Dorothy Gordon Selda Heavner Jim Lewis Jeanine Potts Nestor Castillo C. Scholz M. Marckwardt Bill Elliott Ron Canario Robert Lee T. Moreau Hari Dharan Tien Tan Bill Tyler TUBS/IWF Uli Auster K. Glassmeier W. Magnes CETP Alain Roux Bertran de la Porte Olivier Le Contel Christophe Coillot A. Bouabdellah LASP Robert Ergun Aref Nammari Ken Stevens Jim Westfall Booms

Organization Ground Segment Mission Ops Science Ops Flight Dynamics Ground Based Observatories Manfred Bester Mark Lewis Tim Quinn Sabine Frey Tai Phan All Sky Imagers Ground Magnetometers Fielding & Operation (UC&UA) Stephen Mende Stu Harris Harald Frey UCLA Chris Russell Joe Means Dave Pierce Bob Snare UC Eric Donovan GSFC/GCND David Sibeck Mark Beckman Bob DeFazio Rick Harman UA J. Samson

Mission Overview Launch Space Segment Ground Segment Operations Vehicle: Delta II, Eastern Range Apogee: 91845.2 km ± 9567 km Perigee: 435 km ± 10 km (500 km ± 7 km on or after 3/1/2007) Inclination: 16.0 deg ± 0.5 deg Date: February 17, 2007 Space Segment Spacecraft: 5 Spinning Probes with Fuel for Orbit & Attitude Adjust Instruments: 3-Axis Electric Field, Magnetic Field 3-D Ion & Electron Particle Detectors Spin Rate: 20 RPM Orbit Period(s): 1, 2 and 4 days Orientation: Ecliptic Normal Ground Segment Observatories: 20 Northern with All Sky Imagers and Magnetometers Control Facilities: Mission and Science Operations Centers Operations Phases: L&EO, Cruise, Ascent, Campaigns, De-orbit Lifetime: 2.5 years

Instrument Configuration IDPU: Instrument Data Processor Unit SPB : Spin Plane Booms (4x) AXB : Axial Booms (2x) SST : Solid State Telescope (2x) ESA : Electrostatic Analyzer FGM : Fluxgate Magnetometer SCM : Search Coil Magnetometer

Probe Configuration Antenna EFI Axial Booms (2, Stowed) ESA Miniature Sun Sensor Fuel Tank IDPU EFI SPB Repress Tank Fuel Tank Transponder Thruster A2 Thruster T1 EFI SPB Thruster A1 BAU Battery Gyros EFI SPB Thruster T2 AEB 11

Launch Vehicle

Mission Data Flows THEMIS Probe TDRS Berkeley Ground Station Wallops Ground Station KSC & Astrotech (1) (3) Merritt Island Ground Station UCB I&T Facility JPL I&T Facility Compatibility Test Van White Sands Complex (3) (3) Secure Intranet Santiago Ground Station Secure VPN Tunnel via Open Internet (2) GSFC NMC Open IONet Dial-up ISDN Line Berkeley Mission Operations Center Notes: Open (1), Restricted (2) or Closed (3) IONet Hartebeesthoek Ground Station Different Routes for End-to-end Data Flows Between Probes and GS Elements

Ground Based Observatories UCB/UCLA Delivered All 20 GBO (GMAG and ASI) units Automatic Data Collection and Archiving in Progress Remote Commanding and Diagnostics Working Courtesy H.Frey, UCB Geographic Longitude 324° Longitude 195° Geomagnetic North Pole

Ground Based Observatories GBO Sites EPO Sites

Ground Based Data Flows

Schedule

Major Reviews

Probe 2 I&T F2 I&T at UCB Magnetics at JPL EMC at JPL VIB at JPL TV at JPL Probe Fit Check

FM2/FM3 Thermal Vacuum Probes 1,3,4,5 I&T FM4/5 in Thermal Vac Bus Assembly Probe I&T FM2/FM3 Thermal Vacuum

JPL2 PCA Buildup PCA Assembly and Test

FM2/FM3 Thermal Vacuum JPL2 Environments Acoustics & Shock Vibration Spin Balance Thermal Vacuum FM2/FM3 Thermal Vacuum Storage

Solar Array Illumination ASO Probe Processing Delivery to ASO Bolt Cutter Installation Performance Tests Solar Array Illumination

ASO Probe Fueling Vibration Acoustics Spin Balance Dry Weigh & Pressurize Fueling Thermal Vacuum Storage

ASO PCA Processing Final checks Acoustics Spin Balance PCA Integration SSS Installation Ready for Probes Vibration Fairing Installation Spin Balance Storage

Ground Based Observatories Production line @ UCB Fort Yukon, AK, site GMAG ASI EPO GMAG

Flight Profile

Mission Profile 81

Coast Placement Tail 1 Orbit Plans http://sscweb.gsfc.nasa.gov/tipsod/

Probe Placement Decision Assigned Constellation IDs (P1−P5) to Probe Buses THEMIS A −> P5 THEMIS B −> P1 THEMIS C −> P2 THEMIS D −> P3 THEMIS E −> P4 Decision Based on Probe Bus and Instrument Performance Also Included Performance Details Found During Ground Testing Only Differences Noted Are in Telecom System Team Members Involved in Probe Placement Decision PI, PM, MSE, MOM, MDL, Swales Probe Bus Systems Lead, Instrument Scientists, GSFC Program Manager and GSFC Project Scientist

Year at a Glance Predicted conjunctions exceed 188hrs/season with ~50% margin