Massimo FERRI 9th COSMO General Meeting

Slides:



Advertisements
Similar presentations
Recent & planned developments to the Met Office Global and Regional Ensemble Prediction System (MOGREPS) Richard Swinbank, Warren Tennant, Sarah Beare,
Advertisements

Ensemble Forecasting of High-Impact Weather Richard Swinbank with thanks to various, mainly Met Office, colleagues High-Impact Weather THORPEX follow-on.
Nowcasting and Short Range NWP at the Australian Bureau of Meteorology
COSMO-SREPS COSMO Priority Project C. Marsigli, A. Montani and T. Paccagnella ARPA-SIM, Bologna, Italy.
SPC Potential Products and Services and Attributes of Operational Supporting NWP Probabilistic Outlooks of Tornado, Severe Hail, and Severe Wind.
Di1a: 1 UFFICIO GENERALE PER LA METEOROLOGIA Short term plans of activities related to NWP at UGM Zurich Sept Massimo Ferri.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss The Latent Heat Nudging Scheme of COSMO EWGLAM/SRNWP Meeting,
Eidgenössisches Departement des Innern EDI Bundesamt für Meteorologie und Klimatologie MeteoSchweiz Institut für Physik der Atmosphäre On the Value of.
Slide 1 EUMETNET SRNWP Interoperability Workshop 2008 Slide 1 Interoperability with regard to Boundary Conditions Alfred Hofstadler Meteorological Applications.
Hongli Jiang, Yuanfu Xie, Steve Albers, Zoltan Toth
Francesca Marcucci, Lucio Torrisi with the contribution of Valeria Montesarchio, ISMAR-CNR CNMCA, National Meteorological Center,Italy First experiments.
SLEPS First Results from SLEPS A. Walser, M. Arpagaus, C. Appenzeller, J. Quiby MeteoSwiss.
Numerical Weather Prediction at DWD COSMO-EU Grid spacing: 7 km Layers: 40 Forecast range: 78 h at 00 and 12 UTC 48 h at 06 and 18 UTC 1 grid element:
Short-Range Ensemble Prediction System at INM José A. García-Moya & Carlos Santos SMNT – INM COSMO Meeting Zurich, September 2005.
NWP Activities at INM Bartolomé Orfila Estrada Area de Modelización - INM 28th EWGLAM & 13th SRNWP Meetings Zürich, October 2005.
10° COSMO GENERAL MEETING Plans and State of Art at USAM/CNMCA Massimo Ferri.
1 Requirements for hurricane track and intensity guidance Presented By: Vijay Tallapragada and Sam Trahan (NWS/NCEP) Contributors: HWRF Team at EMC, NHC.
Инвестиционный паспорт Муниципального образования «Целинский район»
赴国际水稻所访学情况汇报 长江大学农学院 邢丹英 2010 年 6 月. 学习目的 学习时间、地点 学习内容 学习收获 几点体会 汇报提纲.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss SPM report / Science Plan COSMO General Meeting, 10 September.
(x – 8) (x + 8) = 0 x – 8 = 0 x + 8 = x = 8 x = (x + 5) (x + 2) = 0 x + 5 = 0 x + 2 = x = - 5 x = - 2.
Interoperability at INM Experience with the SREPS system J. A. García-Moya NWP – Spanish Met Service INM SRNWP Interoperability Workshop ECMWF –
Plans for Short-Range Ensemble Forecast at INM José A. García-Moya SMNT – INM Workshop on Short Range Ensemble Forecast Madrid, October,
COSMO – 09/2007 STC Report and Presentation by Cosmo Partners DWD, MCH, USAM / ARPA SIM, HNMS, IMGW, NMA, HMC.
NWP Activities at INM José A. García-Moya SMNT – INM 27th EWGLAM & 12th SRNWP Meetings Ljubljana, October 2005.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss Science Plan, PPs, PTs, and more … COSMO General Meeting,
NWP at the Italian Weather Service: CURRENT STATUS AND PERSPECTIVES Massimo Bonavita, Lucio Torrisi, Fabrizio Ciciulla and Antonio Vocino UGM-CNMCA, Rome.
Activities of the new WG7 Chiara Marsigli. WP Development of COSMO-LEPS Maintenance and updates of the operational suite at ECMWF (A. Montani) Study,
Vincent N. Sakwa RSMC, Nairobi
PP CONSENS Merging COSMO-LEPS and COSMO- SREPS for the short-range Chiara Marsigli, Tiziana Paccagnella, Andrea Montani ARPA-SIMC, Bologna, Italy.
COSMO - ROmania Liliana VELEA National Meteorological Administration, Bucharest, Romania.
Status of the NWP-System & based on COSMO managed by ARPA-SIM COSMO I77 kmBCs from IFSNudgingCINECA COSMO I22.8 kmBCs from COSMO I7 Interpolated from COSMO.
南水北调东线第一期工程山东段 情况简介. 主要汇报内容 二、南水北调山东段工程总体布置 三、山东段工程项目划分及工程主 要建设内容 一、南水北调东线工程概况 四、前期工作及工程建设进展情况 五、工程总投资.
照片档案整理 一、照片档案的含义 二、照片档案的归档范围 三、 卷内照片的分类、组卷、排序与编号 四、填写照片档案说明 五、照片档案编目及封面、备考填写 六、数码照片整理方法 七、照片档案的保管与保护.
공무원연금관리공단 광주지부 공무원대부등 공적연금 연계제도 공무원연금관리공단 광주지부. 공적연금 연계제도 국민연금과 직역연금 ( 공무원 / 사학 / 군인 / 별정우체국 ) 간의 연계가 이루어지지 않고 있 어 공적연금의 사각지대가 발생해 노후생활안정 달성 미흡 연계제도 시행전.
Жюль Верн ( ). Я мальчиком мечтал, читая Жюля Верна, Что тени вымысла плоть обретут для нас; Что поплывет судно громадней «Грейт Истерна»; Что.
INSTYTUT METEOROLOGII I GOSPODARKI WODNEJ INSTITUTE OF METEOROLOGY AND WATER MANAGEMENT TITLE: IMGW in COSMO AUTHOR: Michał Ziemiański DATA:
Xuexing Qiu and Fuqing Dec. 2014
Met Office Ensemble System Current Status and Plans
European Centre for Medium-Range Weather Forecasts
The impact of moist singular vectors and ensemble size on predicted storm tracks for the winter storms Lothar and Martin A. Walser1) M. Arpagaus1) M. Leutbecher2)
Earth Observation System Sensors capabilities – Denel’s Offering Patrick Musa Ndlovu General Manager: Denel Spaceteq AfriGEOSS Symposium April.
BACY = Basic Cycling A COSMO Data Assimilation Testbed for Research and Development Roland Potthast, Hendrik Reich, Christoph Schraff, Klaus.
Italian Meteorological Service Pratica di Mare, Rome, Italy
Center for Analysis and Prediction of Storms (CAPS) Briefing by Ming Xue, Director CAPS is one of the 1st NSF Science and Technology Centers established.
Introduction to ACCESS NWP
COSMO CONSORTIUM OF SMALL-SCALE MODELLING
Daniel Leuenberger1, Christian Keil2 and George Craig2
Overall Statistics RMSE WRF-UA: 159 W m-2 WRF-UCSD: 171 W m-2 STDERR
The ECMWF weak constraint 4D-Var formulation
COSMO-DE-EPS Susanne Theis, Christoph Gebhardt, Michael Buchhold,
Ensemble tropical cyclone and windstorm forecast applications
AGREPS – ACCESS Global and Regional Ensemble Prediction System
Preliminary test for the development of a 2.8km ensemble over Italy
ECMWF activities: Seasonal and sub-seasonal time scales
HELLENIC NATIONAL METEOROLOGICAL SERVICE
COSMO GENERAL MEETING HELLENIC NATIONAL METEOROLOGICAL SERVICE (HNMS)
High resolution NWP in Australia
NWP Strategy of DWD after 2006 GF XY DWD Feb-19.
Огторгуй ба амидрал Cosmos and life

42h forecast HIRLAM 50km 24h accumulated precipitation.
SRNWP-PEPS COSMO General Meeting September 2005
Selected Priority Projects
Strategy for the coming years
Introduction to ACCESS NWP
NWP activities in Austria in 2006/2007 Y. Wang
Guidelines for future developments Tiziana Paccagnella, ARPA-SIM
The Impact of Moist Singular Vectors and Horizontal Resolution on Short-Range Limited-Area Ensemble Forecasts for Extreme Weather Events A. Walser1) M.
Activities of WG7 Chiara Marsigli.
Presentation transcript:

Massimo FERRI 9th COSMO General Meeting Plans at USAM/CNMCA Massimo FERRI 9th COSMO General Meeting

  VISION Need to develop probabilistic forecast-system for the short term and (if affordable) the very short term forecast range. Need to continue the development of models capable to properly resolve and initiate the convective scale motions to be implemented operationally in the very short term forecast range. The unified approach to the problems of data assimilation and probabilistic forecast should be pursued.

Relocatable & on demand MID-TERM PLANS 2011 Model Deterministic Probabilistic Data assimilation Physics Ext. Short Range Use of ECMWF products - Short Range COSMO-ME & HRM (probabilistic)   7 km/50 levels (14 km./50 levels) 20 members (HRM) Hybrid 3d-var + ETKF Very Short Range Relocatable & on demand COSMO-xx 2.8 km/60 levels Nudging UTCS  

Exploitation of COSMO Model Implementation of a Mediterranean Wave Model driven by COSMO-ME In the framework of HSAF it will be implemented the RTOVS 8 package in order to simulate AMSU and MW sensors.