Aldine Westfield Stormwater Harris County Flood Control District

Slides:



Advertisements
Similar presentations
On-site Sewage Facility (OSSF) Trends in Texas
Advertisements

Timeline of Key Milestones and Dates DateKey Milestone February 2007Washtenaw County Drain Commissioner’s Office authorizes a project to identify opportunities.
Water for Texas 2012 State Water Plan. Water Planning: Legislative Response to Drought  Late 1950s Drought of Record – 1957: Creation of TWDB – $200.
Carson City Freeway Paul M. Frost, P.E. Principal Hydraulic Engineer Nevada Department of Transportation Mark E. Forest, P.E. Executive Vice-President.
Locating and Eliminating Illicit Connections June 28, 2006 James Walls.
US Army Corps of Engineers BUILDING STRONG ® FOLSOM DAM MODIFICATIONS APPROACH CHANNEL EIS/EIR Major Robert Dion and Cameron Sessions Project Managers.
TRLIA Certification of Environmental Impact Report and Selection of Project for Feather River TRLIA Board Meeting: February 6, 2007 Briefer: Paul Brunner,
1 Purpose  Summarize Monday’s workshop  Update on the Radio System – confirm staff’s recommendation  Jail Expansion – discussion/direction  Discussion.
2015 Legislative Session Update: Tax Relief, Tax Law Changes & Tax Credits and Exemptions June 25, 2015 Ryan Rauschenberger Tax Commissioner.
Tropical Storm Allison & its impact on Harris County
THE BOROUGH OF HIGHTSTOWN ENVIRONMENTAL COMMISSION STORM WATER MANAGEMENT DEMONSTRATION AT THE HIGHTSTOWN HOUSING AUTHORITY.
Bridge Building Timelines Presented by The Richland County Engineers Office Thomas E. Beck, PE, PS 77 North Mulberry Street Mansfield, Ohio Jan.
2014 City Budget August 6 – Public Hearing Budget Overview 2014 City Budget of $130,785,167 (including the CIP Reserve Fund) Budget increase of.
Developing Final Phase II WIPs and Milestones Katherine Antos Chesapeake Bay Program Office Jenny Molloy Water Protection Division DC Draft Phase II WIP.
1 U.S. ARMY CORPS OF ENGINEERS AND ST. JOHNS RIVER WATER MANAGEMENT DISTRICT Indian River Lagoon North Restoration Feasibility Study Public Meeting September.
Budget Committee Workshop February16, Oregon’s local budget law is a group of statutes that require local governments to prepare and adopt annual.
NRCS NRCS Watershed Program In Texas. Water Resources AuthoritiesAuthorities Project ActivitiesProject Activities RehabilitationRehabilitation FundingFunding.
Sept. 23 NWC Boston Yes We Can! (We already have in Texas)
Monterey Peninsula Water Management District 1 Confirm Scope of Work and Description for MPWMD ASR Project Item 13 April 18, 2005 Regular Meeting Staff.
Alachua County Community Development Block Grant Application for Funding 1 st Public Hearing June 28, 2011.
SMALL CONSTRUCTION STORMWATER PERMITTING. STORMWATER GENERAL PERMIT FOR SMALL CONSTRUCTION ACTIVITIES Construction activities regulated under this permit.
Construction Report November 17, Projects Site Improvements –In close out Track replacement and turf –Last phase (track) Generators –In close.
Shoreline & Waterway Management Section Regulations Governing Beach Protection and the Use of Beaches December 27, 1983 Beach – is that area which extends.
February 20, 2007 Macon County Planning Board. Structure Height Ordinance Allows construction to 4 stories or 48 feet, whichever is greater Measured from.
Riverside County Flood Control and Water Conservation District Murrieta Creek Flood Control, Environmental Restoration and Recreation Project June 2006.
Lake County Watershed Management Board Funding Program Mike Prusila, CFM, Watershed Planner.
Three Rivers Levee Improvement Authority June 8, 2007 Presentation to the State Reclamation Board Proposed Feather River Setback Levee.
Click to edit section. Needs for a Stormwater Management Program NFIP/CRS Emergency Response Flood Protection TMDLs Water Quality NPDES Development Review.
Comprehensive Policy Plan Amendments Wekiva Parkway and Protection Act December 18, 2007 Comprehensive Policy Plan Amendments Wekiva Parkway and Protection.
Board of County Commissioners PUBLIC HEARING June 29, 2010.
ESD 112 Land Acquisition. Review of Activities to Date Identified a variety of properties Conducted Board presentations/tours Conducted “level 1” due.
TIF 9 (Trinity River Vision) Expansion and Updated Project and Financing Plans Jay Chapa, Director Housing and Economic Development.
City Council March 4, Introduction The UCRA recommends the development of a storm water storage basin just to the east of FM 1223, south of Avenue.
Update on the Richland Creek Reservoir and Water Supply Program Paulding County, Georgia Board of Commissioners Workshop Briefing May 26, 2015.
Why the Need for Increased Stormwater Funding? Citizens expect a higher level of protection from flooding Increased development.
STORMWATER MASTER PLAN TASK FORCE November 20, 2006.
City of Fort Collins REGULATORY CHANGES AFTER A NATURAL DISASTER Susan L. Duba Hayes, PE, CFM CASFM 2005.
1 TIF 9 (Trinity River Vision) Expanded and Updated Project and Financing Plans December 8, 2009 Presented to the City Council Jay Chapa Housing & Economic.
Hillsborough County Public School Siting MPO SCHOOL TRANSPORTATION WORKING GROUP
North Dakota League of Cities- City Auditor Workshop 2016
Economic Development Council Broadband Report
Flood Hazard Area, Flood Insurance and Stormwater Management
In This Week’s “The EDGE”
It’s The Final Countdown To The Mid-point Assessment:
GOVT 2306, Module 11 Special Districts.
Cottonwood Recycled Water Pipeline (West)
CDBG-DR Public Meeting Thursday September 14, 2017
LOW-IMPACT DEVELOPMENT
John Martin Reservoir Master Plan Revision
Bay Ridge & Gum Bayou P.E.R.
Kitsap County 2019 Annual Budget
MPO School Transportation Working Group
Local Bridge Hydraulics 101 Planning & Funding Considerations
Urban Land Bank Demonstration Program
Chapter 4 Osceola County Land Development Code (LDC)
Six Year Improvement Program Public Hearings
SEQRA as a Tool to Review Energy Projects
Tulsa's Risk MAP Program Goals
Los Angeles County Department of Public Works
MDE’s Phase III WIP Inventory 2018 Fall Regional WIP Meetings
Agency Logos. Hazard Mitigation Grant Program Summer 2018 California Wildfires and High Winds DR-4382.
FLOODPLAIN MANAGEMENT BEFORE AND AFTER A CATASTROPHIC FLOOD EVENT
Preliminary Draft 2019 Operating and Capital Budgets
Draft FY Six Year Program
Rain Garden Project Class xxxv wants you to Dig In Let’s put an end to Houston’s flooding problem.
One Company. Unlimited Potential.
Sacramento Environmental Commission January 2019.
Chino Basin Water Bank Development
Bay Area Watershed Network
Planning Partner Adoption Multi-Jurisdictional Hazard Mitigation Plan
Presentation transcript:

Aldine Westfield Stormwater Harris County Flood Control District June 18, 2019 Aldine Westfield Stormwater Detention Basin Marcus Stuckett, P.E. Engineering Division Director Harris County Flood Control District

Harris County Flood Control District A special purpose district created in 1937 by the Texas legislature. In response to floods that devastated the Houston-area in 1929 and 1935. Serves as a local partner to leverage federal tax dollars for flood damage reduction. Harris County Commissioners Court serves as our board of directors or governing body. Over 80 years and billions in infrastructure improvements in the ground

OUR MISSION Provide flood damage reduction projects that work, with appropriate regard for community and natural values. The mission of the Harris County Flood Control District is to provide flood damage reduction projects that work, with appropriate regard for community and natural values. One of the most difficult challenges we face is constructing effective projects that are sensitive to community and natural values in a highly urbanized area. Harris County is the third most populous county in the United States with nearly 4 million people.

Jurisdiction

Bond Approved on August 25, 2018 237 projects across all watersheds 38 projects added based on community input ($400M+) $2.5B Bond funds + $2.3B Partner opportunities = ~$4.8B+ Total Projects will be phased in over the next 10-15 years The actual timing of individual projects will depend on a variety of factors including: Environmental permitting Right-of-way acquisition Utility relocation Etc. Project lists and projected schedules will be published each year (with updates as needed)

Aldine Westfield Stormwater Detention Basin 2018 Bond Program – Greens Bayou Community Engagement Meeting June 16, 2018 HCFCD requested public input 44 public comments received 27.5% 25.0% 22.5% Note that comments may request more than one thing. Note that based on the public comments, we’re building what’s being requested

Aldine Westfield Stormwater Detention Basin Isabel S. Fung , P.E., P.M.P. Project Manager Harris County Flood Control District

Aldine Westfield Stormwater Detention Basin DEFINITIONS What is a stormwater detention basin? Stormwater detention basins are places to store damaging flood waters temporarily until the channels can safely carry the water away. What is meant by the term 10% (10-year) or 4% (25-year) storm event? The 10% (10-year) storm is a rain event having a 10% chance of being equaled or exceeded in any given year, whereas the 4% (25-year) rainfall event has a 4% chance of being equaled or exceeded in any given year.

Aldine Westfield Stormwater Detention Basin INTRODUCTION Target: Provide approximately 1,250 acre-feet (407.3 million gallons) of stormwater detention volume. Design Consideration: Dry basin is being recommended due to proximity to Bush Intercontinental Airport.

Aldine Westfield Stormwater Detention Basin INTRODUCTION The site has been part of the HCFCD’s Excavation & Removal (E&R) Program since 2005. Approximately 533,000 cy excavated to date. A pipeline corridor is bisecting the property.

Aldine Westfield Stormwater Detention Basin Project Outlook & Next Steps

Aldine Westfield Stormwater Detention Basin Current Outlook Construction of Phase 1 began in May 2019. Phase 1 will provide approximately 667 acre-ft (217+ million gallons) of stormwater detention volume. Construction cost is $6.85 M and will take 370 calendar days to complete.

Aldine Westfield Stormwater Detention Basin Long Term Outlook Phase 2 is under design. Plans are about 50% complete. An Individual Permit has been submitted to the US Army Corps of Engineers for approval. Phase 2 will provide approximately 600 acre feet (190 million gallons) of stormwater detention volume.

Floodwater is contained within channel banks during 10-year and 25-year storm events

Floodwater is contained within channel banks during 10-year and 25-year storm events

We want to hear from you. Please visit HCFCD.org/C-33 to learn more about the ALDINE WESTFIELD STORMWATER DETENTION BASIN, ask questions and sign up for our mailing list.