Access Hatch Replacement Phase 4

Slides:



Advertisements
Similar presentations
Pedestrian Considerations in Work Zones… St. Peter Main Street Reconstruct.
Advertisements

11 Grant Park Sewer Rehabilitation Project BES Project #E10346 Bid # SCOPE: Rehabilitation, Replacement, or Relocation of Sanitary & Combined Sewers,
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Herndon Station - North Pavilion Construction Town of Herndon – Town Council August 6, 2014.
6 th Street Water Main And Street Reconstruction 2013.
Lake Park North Lion Bridge Rehabilitation Milwaukee, Wisconsin Darrell Berry, PE, SE Approaches to Historic Bridge Rehabilitation Case Study #2 1.
Borough of Madison Green Avenue Reconstruction Engineering CY2012 Existing Conditions Underground Infrastructure Municipal Aid Application Reconstruction.
Pavement Preservation Preventive Maintenance
Disclaimer – Any and all information contained herein is subject to change without notice 1 O’Hare Airfield Configuration EXISTING Airfield Configuration.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
New Bangkok International Airport Progress Information & Schedule Analysis KOICA(NESDB) FOR Air traffic Control Tower.
This certificate is awarded to _____________________ on this 31 st day of May, _____________________.
1 CV4902- Construction Methods Dr David Chew. 2 Construction Considerations Site layout plan Outline of entire construction process Details of temporary.
PVHS Offsite Parking – Action Item (June 10, 2015) Change order #3 – Stand along Action Item, as it will cause the project contract cost to increase to.
1 Galileo Research and Development Activities GALILEO GALILEO 6 th Framework Programme Aeronautics & Space November 2003.
CITY OF RAINIER RAILROAD CROSSINGS 1. Project # 2 Team Members PSU City of Rainier Lars Gare, City Administrator ODOT Rail David Lanning, Crossing Safety/Compliance.
CO# OS POSITIVE TRAIN CONTROL PROJECT Change Order #4 October 17, 2013 Related to Agenda Item 11.
Bridge Abutment Repair Old King’s Road Location; Old King’s Road N
State Road 5 over Eel River Bridge Rehabilitation DES# South Whitley Community Public Library Thursday, February 5, :30 p.m. Please silence.
N. Hancock Road Traffic Signals October 14 th, 2014 Presentation Prepared By Lake County Public Works Department.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
23 rd Avenue Corridor Greenway Community Open House November 6, 2013.
Melbourne Airport – Delta Infill GSE AustStab Awards of Excellence 2014 Negri Contractors VIC Innovation or Excellence in Sustainability Sponsored by.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
Item 6b. Project Vicinity Park Ave Bridge Existing Park Avenue Bridge.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
PORT OF TACOMA. Contract Increase & Award Pier 7 Structural Repairs Request authorization to expand the scope of existing A/E Contract No and.
BS0502 Flood Protection Erie Street Valve Chamber Platform TS-2575 Prebid Meeting – Technical Presentation May 8 th, 2013.
st significant figure Significant figures Significant figures 1 st significant figure.
MARCH 18, :00 A.M. CITY COUNCIL CHAMBERS 2016 TRAFFIC SUMMIT HOSTED BY: CITY OF LANSING DEPARTMENT OF PUBLIC SERVICE.
A presentation by Kittelson & Associates, Inc. Broward Boulevard Presentation to the Broward MPO TCC and CIR March 2012 Agenda Item NA-1, Attachment.
Near Hit Program Marty White February 22, LBNL Near Hit Program Office of Contract Assurance Meeting with all Divisions to benchmark programs.
Strategies for IT Adoption in the Building Industry © 2002 Prof. C.M. Eastman & Dr. R. Sacks Planning the next steps…
Evergreen Highway Corridor Update Planning Commission Workshop March 22, 2016 Jennifer Campos, Senior Planner.
PORT OF TACOMA. Agreement Lincoln Avenue Grade Separation – Utility Relocation Request authorization for the Executive Director to Execute an Agreement.
RTD Board Update October 8, 2013 US 36 Bus Rapid Transit.
Item 9D Backup Power for Pearson Lane Pump Station.
Reconstruction of Beach Drive Reconstruction of Beach Drive National Park Service U.S. Department of the Interior Rock Creek Park National Park Service.
CITY OF BELLEVILLE ROAD IMPROVEMENTS PROGRAM
White Pigeon Community Schools
Gladewood Bridge Summary: Built in 1920 Crosses the Yellow Creek
Project Purpose and Objective
Manchester’s CSO Program: A Look Behind and a Look Ahead
Project General Data Beneficiary: Rosenergoatom
City of Bloomfield Hills
I-84 Waterbury Project Project Overview July 2017.
PROJECT NO. T SE Adams Street - SE 29th Street to SE 33rd Terrace
Highway 169 Bridge Replacement & Pavement Resurfacing
Project Scope of Work Project Contacts
25th Avenue Grade Separation
25th Avenue Grade Separation
Orange Grove Boulevard Complete Streets Project
Natural Science Building East Ramp Bottom: Existing Sign
Change Order 4 Contract J06026C01 JIWRF Nonhazardous Site Lighting Upgrade Restore ED Original Delegated Authority Approve Changes to Total Contract.
Award of Contract M06013C04 Project Management Information System (PMIS) Licensing, Maintenance and Service Agreement Commission Agenda Item #13.
Sludge Dewatering Filter Press Controls Upgrade at SSWRF
Asset Management Plan Development and Implementation Support
Access Hatch Replacement Phase III
Hoops, haddock, cascade, oriole, Ervin and valley view heights paving
Ethiopia Operational Hub (ETOH)
Jones Island Water Reclamation Facility
Commission Agenda Item # 17
Commission Agenda Item #8
Design and Engineering Services
KK River Flood Management Community Outreach Services
Building 360 Freight Elevator Rehabilitation at SSWRF
Ethiopia Operational Hub (ETOH)
National Organization of Minority Engineers Leadership Summit
Commission Agenda Item #1
Commission Agenda Item #2
Presentation transcript:

Access Hatch Replacement Phase 4 Award Contract C98047C04 Access Hatch Replacement Phase 4 Commission Agenda Item #1

Access Hatches Underground structures in conveyance system built with access hatches Subject to vehicle traffic Over time, hatches and supporting concrete structure deteriorate and could fail Failed structure is safety hazard to pedestrian and vehicular traffic

Project Purpose Restore integrity of 7 structures where there is significant deterioration

7 Locations W. McKinley and N. Dr. MLK Jr. Dr. W. State St., east of N. 3rd St. Alley between N. Plankinton and Milwaukee River W. Michigan St., 120’ east of N. Plankinton W. Michigan St., 160’ east of N. Plankinton W. Michigan St., 200’ east of N. Plankinton E. Michigan St., west of N. Water St.

Project Scope Remove concrete from top of structure Reconstruct top of structure Install new precast concrete cover Restore pavement around structure

Project Cost/Schedule Project within budget Contract duration 10 months

QUESTIONS?