Weekly Status Report Week of

Slides:



Advertisements
Similar presentations
Webtrain Decoupling Adam Kadolph EE451 Bradley University Advisors: Dr. Irwin, Dr. Schertz Week 3 Tuesday 10/24 – Monday 10/30.
Advertisements

AME Senior Design Group E3: Hewlett-Packers January 29, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
Information Architecture Week 15. Information Architecture CALENDAR.
SD Dec Team Members Client / Advisor Acknowledgements Victor Villagomez Cpr E Joe Grady E E Dr. Gary Tuttle Leland Harker Prakalp Sudhakar E E James.
Life Groups Online Creating Groups Orientation 2013 Christ's Church.
EPICS Presentation Template. Note Slide (WILL NOT BE INCLUDED) Numbers in () mean slide length.
Senior Design 1 Project Dynamite Team Untraceable –James Ailes –Muhammad Al-raddadi –Kai Jorgensen University of Portland School of Engineering Advisor.
EE/CS 480/ /16/2015 9:02:14 PM University of Portland School of Engineering Project Yew Inline Power Monitor with Cost Analysis Team Zubin Bagai.
06/02/02CERN - LARG meeting1 CALIBRATION BOARD STATUS  Status of the DMILL chips used on the calib. boards  Low Offset Op Amps: Offset measurements 
WEEK 1 You have 10 seconds to name…
In and Out Line Monitoring System for Volleyball Kelley White Advisor: Professor Buma.
CS-EE 480 Fall November 2004 Project Grey Wolf Digital CMOS “Memory” Game Team Lindsay Megyesi Taya Campagna Mason Tabata Weston Kurisu Advisor Dr.
Math Facts Single Digit Addition ©
Force 11/25. LT: I will be able to apply Newton’s laws of pHysics Vocabulary: Newton’s three laws Free body diagram Finish Newton Law activities and have.
© Hamilton Trust Keeping Up Term 2 Week 2 Day 1 Objectives: Know by heart pairs with a total of every number up to 20 Add three single digit numbers using.
MATT DIXONARCHITECT CANDACE REMALYPROJECT MANAGER SPENCER SMITHBUSINESS ANALYST BRYAN LINTHICUMDEVELOPER ADAM STERNFELDTESTER Not Even Funny [Property.
Directions For Accessing Your “Moodle” Team Account 1 Step 1: Use your team Moodle account to access Technology Challenge Louisiana High School Technology.
CS-EE 480 Spring January 2005 Project Grey Wolf Digital CMOS “Memory” Game Team Lindsay Megyesi Taya Campagna Mason Tabata Weston Kurisu Advisor.
FSAE Engine Management System Adolfo Pereira Donald Zucaro Lee McDade Jeremy Belge Sun-Jet Liu Marcin Trelinski Advisor: Dr. Alan Nye Sponsor: FSAE Formula.
CS-EE 481 Spring January, 2004 University of Portland School of Engineering Project Lamprey A CMOS Traffic Light and Intersection Control circuit.
CS-EE 481 Spring February, 2004 University of Portland School of Engineering Project Lamprey A CMOS Traffic Light and Intersection Control circuit.
In-Delta Storage Program Environmental Evaluations Stakeholders Committee Meeting January 22, 2003 Leslie Pierce.
URL://icee.usm.eduURL://icee.usm.edu Phone: (601) 266 A Construction Engineering Scheduling Simulation through the.
BUS 611 Week 5 Assignment Monthly Status Reports To purchase this material link Monthly-Status-Reports.
Week-4-Learning-Team-Presentation-Website- Development Check this A+ tutorial guideline at 352/BSHS-352-Week-4-Learning-Team-
BSHS 382 Week 3 Learning Team Research Proposal Check this A+ tutorial guideline at 382-Week-3-Learning-Team-Research-Proposal.
BIO 101 Week 5 Learning Team Food Web Diagram Check this A+ tutorial guideline at 101/BIO-101-Week-5-Learning-Team-Food-
BIS 220 Week 4 Learning Team Wireless Technologies Proposal Check this A+ tutorial guideline at 220/BIS-220-Week-4-Learning-Team-
Designing a Fast Defroster for the Forgetful Chef
AIXM – Work in Progress AIXM CCB – Webex, 07 FEB 2014.
Media and Management Keaton Mantz Gabby David Harry Smith Pam Barclay
How To Update Adobe Flash Player On MAC.
Project Owyhee Digital Lock
Team 1: 32 responses Team 2: 55 responses Team 3: 29 responses
Quicken Problems with Application Data
Garmin Connect IQ Support Service Call for
Quicken Update Problem With Bank
Garmin Software Update Support Call for
WEB 236 Education for Service-- snaptutorial.com.
دانشکده سرمایه گذار مبانی و مدل
Graduate Research Support Program (GRSP)-TRESS
Project Status Review Purpose: To anticipate prototype performance
Write less; please more pictures! Remove this box!
Team member1 Team member2 Team member3 Team member4 17 September 2009
Website Call
3D Vizualization Engine For Location Based Information
ECE 477 Design Review Group 10  Spring 2005 I, Robotic Waitress
ECE 477 Design Review Group 10  Spring 2005 I, Robotic Waitress
Call : Website: -
Reviewing Course Outlines for C-ID Designation
Warm-up August 28, 2017 Solve all (and graph number 1): 12 + (-5) =
To start Affiliation of your members go to
Employee On-Line: Expenses User Guide
C.2.10 Sample Questions.
NDIA Intent Guide Update for EVMIG.
C.2.8 Sample Questions.
Graduate Research Support Program (GRSP)-TRESS
C.2.8 Sample Questions.
Math Facts Single Digit Addition
Diagram Recognition Tuan Van Tony Vigil Jack Herbert Beau Crawford.
Project BoG Wireless Breath-Analyzer to Key-Lock
 WEBSITE:
 WEBSITE:
Project Grey Wolf Digital CMOS “Memory” Game
The prospecting rulebook, A 4-WEEK strategy document
Preparing for the future …
Project Nutria Web-based Class Forecaster
1 Directions For Accessing Your “Moodle” Team Account
Engineering Design Process
Request Limited RII Notice of Authorization in Learning Hub
Presentation transcript:

Weekly Status Report Week of 11-03-07 Team Indigo S. MacNaughton, C. Downs, D, DeMeo This Week Project Plan due 11-10 by C. Downs Ready Project Status Report by 11-9 S. MacNaughton System Engineering Diagram R2 by 11-9 by D. DeMeo Website Updated and Digital Drop Box created by D.DeMeo and S. Mac www.ece.tufts.edu/~ddemeo01 http://drop.io/dcsindigo Password: design Meet with Project Advisor 11-14 – all Re: Current source and parasitic capacitance Prototype by January Next Week Further Howland Current Source and Capacitance research by C. Downs by 11-16 Part list for current source by 11-16 by C. Downs Order chip(AD8302) by D. DeMeo by 11-16 Project Proposal R3 if necessary by S. MacNaughton by 11-16 Long Term Research Sensing Coils by 11-30, Design Coils by approx. 12-20 Finish Specifications on Chip Set so able to Order Sample Parts by 11-30