MRV system budget and scheduling Short overview installation

Slides:



Advertisements
Similar presentations
Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
Advertisements

Vacuum Vessel Production Readiness Review
High Power Hg Target Conceptual Design Review Equipment Installation at CERN V.B. Graves P.T. Spampinato T.A. Gabriel Oak Ridge National Laboratory February.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
LINACs Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
R. Rinaldesi, K. Kershaw – HE Group
The ESS vacuum team has overall responsibility for all technical vacuum systems used on the: Accelerator, Target and Neutron Scattering Instruments and.
June 2004 Andrea Gaddi, PH-CMI USC Installation Commissioning Task Force 1st Run Meeting, June 3rd, 2004.
K. Alam, CLIC workshop, October 16-18, CLIC workshop, October 2007 Working group “ Two beam hardware and integration” Test module in the two.
Edgar L. Black MUCOOL ADVANCED M.T.F. & M.I.C.E. LAYOUTS August 12-13, 2002 Edgar L. Black IIT.
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
Spectrometer Solenoid Schedule MICE Schedule Review May 23 rd 2011 Roy Preece (STFC RAL, LBNL)
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
Progress on Remote Handling Systems TAC 12 Magnus Göhran – WPM 15 th October 2015.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Spreaders & Recombiners Beam Transport Michael Bevins May 30, GeV Upgrade - Beam Transport Spreader/Recombiner Dipoles and Layout, & Installation.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
ESS Vacuum Standardization
Update on the ESS monolith design Rikard Linander Monolith and Handling Group ESS Target Division TAC 10, Lund, Nov 5,
HTS-2 – FY17 Budget Request Joe Ozelis, Sr. Eng. Physicist PIP-II Budget Retreat 26 April, 2016.
PRELIMINARY VERSION Mechanical integration in the ESS Accelerator tunnel HENRY PRZYBILSKI.
Instrument Construction Phase 1 and beyond Rob Connatser Chief Instrument Project Engineer September, 2014.
DTU A VISION OF SUPPORTING NEUTRON CHOPPER ESS PT 1 - BUNKER SYSTEMS Discussion Document.
Introduction to the Accelerator layout February 2016 Nick Gazis Mechanical Integration Lead Engineer.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
The ESS Target Station Eric Pitcher Head of Target Division February 19, 2016.
ELENA installation progress F. Butin / ELENA collaboration.
Slides for TAC meeting Oct/2015 Marcelo juni Ferreira Vacuum section leader October,
Bill Raynor Naval Research Lab
Making Difficult Decisions in a Transparent Way –
ProtoDUNE – DSS Installation, Alignment and QA
Brief Status SPS Prototype PSB Prototype Installed in LS1
Configuration Management and Layout Database ELENA Project
LHC Experimental Vacuum Systems Status October ‘07
Spoke CDS PDR Closeout J. G. Weisend II June 10, 2016.
<Location> – <Project Name>, Sponsor: <name>
TEST PLANS for HL LHC IT STRING
Optimum cryomodule length at the ESS
Anthony DiPette Installation / Vacuum Group Leader 7/17/2015
Experimental equipment Edgar L. Black February 17, 2019
ESS Project Status Roland Garoby – Technical Director August 2018.
ESS Installation Binders Readiness Reviews Work Orders Mikael Jakobsson ESS Installation Manager Sep , 2018.
Installation of Photon Beam Transport to FEH
Installation Binder / IRR – an example
Cryomodule Assembly Plan
Operations, Risks & Hazards
Injector / Linac Installation Current Status
The Bunker Project Overview Zvonko Lazic
Mechanical Engineering & Technology (MET)
Introduction and Overview
Primary Spectrometer & Sample Environment
SNS PPU Helium Vessel Design and Assembly
Imaging & Engineering STAP Meeting 12th-13th of April 2018
RSFs & categorisation 20 May, 2019.
Bunker -Target interfaces
APTM and GRID interface requirement PBIP and PBW
Bunker Wall Design Wall ESS
Czech in kind contribution – target technologies
Welcome Update on ESS Construction Project
NSS integrated installation plan workshop Introduction
Bunker Project Operation aspects
Michail Anastasopoulos Lead Detector – Design Engineer
Executive Project Kickoff
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
Vacuum Control System for Monolith Vacuum
SAR MEBT Bilbao March Mats Lindroos
SNS-PPU upgrades the existing accelerator structure
Vacuum System Design for the Target Monolith System
Overview of the TARGET Monolith Rough Vacuum
General Overview of WP 12 ESS Vacuum System
Presentation transcript:

MRV system budget and scheduling Short overview installation Dr. Marcelo juni Ferreira ESS Vacuum Section Leader European Spallation Source ERIC 28/05/2019

Outline Background of ESS monolith solution, Introduction to ESS Vacuum System, Vacuum Standardization Vacuum requirements: TARGET Monolith Rough Vacuum System specifications and interfaces,

ESS Monolith Vacuum System Brief history: cost/budged April/2014 Cost/budged was planned as He solution only (pump/purge). Jun/2017 Service Level Agreement Vac-TARGET Div. for the Monolith Vacuum system solution Feb/2019 Formal responsibility transfer of the Monolith Rough Vacuum System to the ESS Vacuum Section on the original cost/budged from He solution (≈ 1.1 M€ no-labor only), May/2019 Monolith Rough Vacuum CDR (alignment of scope for Vacuum Section responsibilities)

Original Vacuum solution budged Item Value [k€] Monolith rough vacuum, 2 bar gauge pressure operation General activities and tasks related to vacuum systems for target including travel 165.4 k€ Design and fabrication support both at ESS and partner facilities (labor) 133.8 k€ Eng: 1.2 FTE Designer: 0.5 FTE Tech: 0.25 FTE Assembly and integration of all target systems and final leak tests and vacuum acceptance tests at ESS (labor) 250 k€ Eng: 0.8 FTE Designer: 0.6 FTE Tech: 2.75 FTE Monolith Vacuum Hardware, rough vacuum All hardware 2 bar radiations resistant. 300 k€   Instrumentation feed-throughs and windows 30.0 k€ Delta vacuum equipment cost for upgrading 2 bar gauge pressure operation + radiation resistant 80 k€ Vacuum support equipment 100 k€ Vacuum Control System (non-labour and labour) 90 k€ Eng: 0.25 FTE Tech: .50 FTE Total cost rough vacuum, 2 bar gauge pressure operation 1 149.2k€ Eng: 3.35 FTE Tech: 3.50 FTE Monolith high vacuum up-grade to allow removal of PBW Delta vacuum equipment cost for upgrading to high vacuum 350 k€ Required upgrades to accelerator Including the Pressure code compliance Steady state operation includes: 0.5 FTE Eng + 1 FTE tech Operational Spares Operational year 2021 2022 2023 2024 2025 Value [k€] 105.0 95.0 115.0 145.0 135.0

MRV System as CDR version Total labour (20192-022): Eng: 6 FTE (include designer) Tech: 9 FTE (installation) Total hardware (20192-022): Service: 280 K€ (contractors) Mat: 875 k€ (equip+controls)

Early schedule for Monolith installation Only high level milestone available from P6 First time we need vacuum tests during installation of monolith 7th of Feb 2020. - Leak test of the Proton Beam Vessel Monolith rough vacuum system fully functional (System test performed), 1st march 2022 - First pump down fully loaded and leak tested

Top view Dec -19 (Temp crane op.) Temp crane 65 ton

Monolith Vessel installation Access route for portblock installation

High bay Crane for Target installation period Preferred solution 2 x 65 Ton Temporary cranes Temp. crane 65 ton Operational jan -20 Temp. crane 65 ton Operational dec -19 Or Permanent crane 95ton Cleanliness during installation inside monolith (same requirements for temp. Crane as for permanent crane) Speed (traverse and hoist) suitable for installing heavy sensitive components True vertical lift (might not be a requirement for temp. crane, Allow to have parallel work on both area (building won’t be fully close during the installation inside monolith)

Thank you! Tack!