Tentative timeline for 2014 SIDS Conference

Slides:



Advertisements
Similar presentations
Doc.: IEEE /1514r0 Submission November 2014 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG November 2014 Closing Report Date: Authors:
Advertisements

Doc.: IEEE /0173r0 Submission January 2015 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG January 2015 Closing Report Date: Authors:
Doc.: IEEE /1301r0 Submission September 2014 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG September 2014 Closing Report Date: Authors:
WSIS Preparatory Process and PrepCom 2 Amarendra Narayan Secretary General Asia-Pacific Telecommunity.
A surprise presentation by Jan-Gustav. The intergovernmental system The intergovernmental system is surprisingly open and accessible The system is meaningful.
HFA Progress Monitoring and 10 Year Review ISDR Asia Partnership (IAP) Meeting Bangkok, April 2014.
Final Deadlines for students aiming to graduate in November 2013 April 4th PGR4 submitted to Registry (to approve examiners at next GSB) July 8 th Submission.
International Year of SIDS 2014 and The Third International Conference on SIDS.
CSTD Working Group on Enhanced Cooperation Peter Major Chairman, CSTD WGEC CEPT COM-ITU Meeting Copenhagen, March 2014.
Caribbean Workshop on SAICM and related chemicals and hazardous waste management instruments Bridgetown, Barbados, March 2009 Preparations for the.
Document CWG-SFP-1/2-E Proposed Process for The elaboration of the ITU STRATEGIC and financial PLANs for st Meeting of the Council Working.
SOS Substitute Jobs Available
Teacher Evaluation Timeline
GCOS IP and Update on CEOS Response
and Loudoun County School
Dates for Stop Smoking Courses 2013
The Project – Eportfolio Build
Updates on Preparations for CPM19-2, RA-19 and WRC-19
IEEE TGa Project Timeline
Art Awareness Q1 – ARTIST
Tge draft ballot information
16 ARC hosted by CTGS Date: October 21-25, 2019
The Sixth Committee Bradford Smith 11/10/2018.
All Wales Safeguarding Procedures Review Project
FBC Code Development 6th Edition (2017).
Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May Jun
Key Dates-Odd Days April 26th-Lottery April 28th-Draft & Work Day
[ENTITY NAME] [FUNCTION CERTIFYING] Certification
[ENTITY NAME] [FUNCTION CERTIFYING] Certification Review
Document CWG-SFP-3/8-E 5 December 2017 Original: English
Revision 1 to Document CWG-SFP-2/7-E 12 September 2017 Original: English Process and timetable for The elaboration of the ITU STRATEGIC and financial.
Project Nexus Workgroup AQ Correction Process Timeline
P802.11aq Report to EC on approval to forward draft to RevCom
P802.11aq Report to EC on approval to forward draft to RevCom
2018/2019 School Calendar July August September October November
Luxembourg Presidency Presentation Human Resources Working Group
Revised engagement approach for draft GTAC
SOCIAL DIALOGUE TIMELINE
Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May Jun
As needed for progress monitoring
Proposed Strategic Planning Process for FY 2013/14 thru FY 2015/16
PCS Day - Feedback 23th November 2016, Vienna.
SOCIAL DIALOGUE WITHIN EUPAN
SOCIAL DIALOGUE WITHIN EUPAN
The way foward Maria Martinho Secretariat of the convention
Success is a reason to celebrate!
WRC-19.
October 2004 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [SG3c Project Timeline] Date Submitted:
TGs Process, November Date: Author: November 2009
IEEE IMT-Advanced Review Process
Statewide Accountability
SOCIAL DIALOGUE WITHIN THE SCOPE OF EUPAN
Chair: Petter ÅSMAN Secretary: Thomas VERCAMMEN
ESS Resource Directors Group Luxembourg
IEEE SGa Project Timeline
SADC 5TH WRC – 15 PREPARATORY MEETING
October 2014 Star Data Prior to the C.A.F.E. Reading Initiative these were the results attained.
may Test 3 Review Test 3 Test 3 Activity
Update on the country reporting process for FRA 2010
PLAYMATES LEARNING CENTER CALENDAR
HRb SG Status and Information
Document CWG-SFP-2/7-E 4 August 2017 Original: English
P802.11aq Report to EC on approval to forward draft to RevCom
Training timeline Train the trainer RFC 1st round RFC 3rd round
Kardale coaching schedule - FINAL
May 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Project Plan] Date Submitted: [15 May.
IEEE aj May Closing Report
Jella Kandziora, JUELICH Oslo, January 29th, 2019
July 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Project Plan] Date Submitted: [ July.
TGax November 2017 Closing Report
Presentation transcript:

Tentative timeline for 2014 SIDS Conference GA-68 2nd GA modalities resolution Addressing rules of procedure and any other outstanding issues 3rd Prepcom followed by SIDS CONFERENCE Date and venue to be determined 3 days final prepcom at conference venue, immediately before conference GA-67 1st GA modalities resolution Submission of draft (31 October deadline) Conclusion of negotiations (30 November deadline) SG synthesis report issued Oct 2012 May 2013 Oct 2013 Jan 2014 1st half 2014 2nd half 2014 Regional preparatory meetings (through the year) GA-69 Adoption of Conference Outcome 1st prepcom CSD-20 (6-10 May) SIDS day within CSD-20 session Two day prepcom meeting (immediately following CSD-20) 2nd prepcom Venue to be determined One day inter-regional meeting Three-day prepcom meeting 1