Tuesday End of fill 1393 Movement of suspicious Roman pots OK

Slides:



Advertisements
Similar presentations
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
Advertisements

Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
Tuesday 17 th April 04:00 Prepare second fill for v/d Meer scans. 06:22 Stable beams, v/d Meer scans for Alice and LHCb. 13:20 End v/d Meer scans.Dump.
● Morning: Physics fill with 25 bunches: – 07:00: Injection; – 07:25: Start ramp; – 09:00: End of squeeze and stable beams; – Emittances:  x1 = 3.0 
Goal of the week: Stable beams with trains of 200 & 248 bunches 1 OP summary of week 40 R. Bailey, J. Uythoven & J. Wenninger.
07:27 Beams dumped in ramp  Energy error… SIS  The telegram information on the energy was missing for a few seconds, effectively freezing the energy.
LHC Status Fri Morning 3-June
LHC Wire Scanner Calibration
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
LHC Status Tue Morning 22-Aug
Wednesday 3rd October - morning
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Monday Recover after trip of RB.A81  Cause of the trip not clear. MP3? 09:00-13:00 Re-inject and Injection verification. In parallel investigations on.
Sunday 28 Nov. 00h00: Stable beams # x 121 b. Peak lumi 2.0e e25 cm-2 s-1. 09h52: Dump fill # delivered 440 (mb)-1. RCBCH8.L5B1 trip.
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Tuesday Nov 16th Fill 1492 into physics around 07.30
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
LHC Status Wed Morning 13-April R. Assmann, B. Holzer et al
Monday 11/07: Recovery Plenty of accesses.
LHC Operation Week 41 Coordination G.Arduini, M. Lamont
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Tue :25 Beams dumped due to RF vacuum interlock
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
LHC operation in week 42 Coordination:, Malika Meddahi, Joerg Wenninger Thanks to OP crews, HW and SW teams + experiments Aims for the week Cure aperture.
Saturday 1.3 e32 Overnight Morning
Summary of Week 11: 14 – 21 March
Summary of week 44 Aims of week 44 J. Wenninger & J. Uythoven
LHC operation in week 39 Coordination: Mike Lamont, Jan Uythoven, Malika Meddahi Thanks to OP crews, HW and SW teams + patient customers Aims for the week.
Tuesday Fill 1494 dumped by operations at (~ 0.25 ub-1 in ~6.5 h): LSS6 BPM interlock test 13:00 Fill 1495 dumped by RF dump (cavity quench) 14:00-17:30.
Lost at 12:05 to power converter (RTQX2.R1) problem
Note: squeeze in Atlas, CMS, LHCb and Alice on going
Friday 31st August & night
Thursday 10th May - morning
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
Wire almost entirely through beam before BLM triggers dump
Tuesday 9th November 10:02 Fill beams dumped
Yesterday’s morning’s controls issues
450 GeV Initial Commissioning with Pilot Beam - Beam Instrumentation
Wednesday 03/11 – The Plan Finish electron-cloud program:
Summary Thursday h21: Stable beams fill #1303.
Monday – Morning Fill 3265 stable beams since 1:31
Wednesday Ramp single nominal bunches for loss maps
Aims for the week Recover from technical stop and precycle at 10A/s
Thursday Physics fill 1250 (with 13b) dumped at 10.30
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
Thursday Fill 1364 (24 bunch) dumped at 07h
Thursday 26th July 13:21 Fill 2880 beam dumped
Thursday – Morning Energy matching at injection with H CODs
Friday 8/10/10 - Morning Planned to keep fill until the afternoon
LHC Status Tue Morning 22-Aug
Wednesday h10: Programmed dump. 07h54: Injection. 200b.
Monday :15 fill 3523 dumped by BPMs IP6
Polarity inversion 07:00 ALICE solenoid and dipole polarity switched to positive External Crossing angle polarity unchanged at injection/ramp & squeeze.
LHC Morning Meeting - G. Arduini
Summary Tuesday h23: Machine closed. Precycle started.
Wednesday 16th May 03:05 beam dump, RF fault crowbar problem on module M1B2 06:09 Another crowbar at injection. Access for RF; problem Beam Imminent Warning.
Fri :52 Stable beams fill #2536
Wednesday h18: 228b fill lost just before start of ramp.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Another Immortal Fill….
Tuesday 24/5 Fill # :00 Stable beam fill # bunches
Thursday Morning/Afternoon
Wednesday 26 October 2011.
Saturday 28th 08:17 Fill #1812: Stable beams, peak luminosity ~1.1x1033 cm-2s-1 19:00 Go to adjust for RF-checks; Record fill lumi of 31.7 pb-1 for CMS.
Wednesday 6.10 Morning: Quench test at 450 GeV
Saturday 26 November 2011.
Monday 152 bunch operation summary
Presentation transcript:

Tuesday End of fill 1393 Movement of suspicious Roman pots OK Luminosity scan OK emittance estimates from lumi scans: h: 3.2 um v: 3.6 um No wire scan due to intensity interlock (1.5 1013 per beam) Beams dumped 09.45 Access through the end of the morning and all afternoon Scheduled for CMS and ALICE QPS S34, MB.B9R3 needed soon after Revealed water leak. Took from 11.15 to 18.45 Seems like the evacuation hose was blocked up. More news about this tomorrow.... ATLAS QPS in PM25 (delayed due to lift maintenance) TCTs L1 CMS 9/11/2019 LHC status

Tuesday BI systems studies postponed Beam from 20.00 Some problems in the PB/PSB Physics fill 1394 from 22.00 < N > 1.1 1011 No emittance measurement before ramp (intensity) Tune measurements lost during ramp Stable beams from 24.00 Initial luminosities around 0.67 1032 Beams lost at 01.45 because of a "BLM_energy_check" interlock. BLM in L7 were lost BLM data missing sector 6-7 - cfv-sr7-blml.. Reboot 9/11/2019 LHC status

Fill 1394 - vacuum 9/11/2019 LHC status

Fill 1394 – Stable beams 9/11/2019 LHC status

Fill 1394 – clean dump 9/11/2019 LHC status

Fill 1394 - PM 9/11/2019 LHC status

Wednesday Early hours Next Booster problem (low level RF) LHCb VELO interlock Next Quench test Injection setting up for next step (includes 24 bunch injection) PLL ramp ? Physics with 200 bunches 9/11/2019 LHC status

Outstanding requests Dedicated fill to complete VdM scans Around 1 shift needed Quench test (Wedn. – TBC) – Coord.: Joerg Wenninger Transverse damper – 2 h without beam – no access W. Hofle MKQA & AC-dipole – will need another access – E. Carlier Voltage rampdown@injection Test of new beam presence flag system – M. Gasior CO security intervention to be scheduled - A.Bland RCBH15.L6B1 to be exchanged Mods to Q meter electronics (RS et al, from Thursday) BCT access (JJG) BI – Coord. J. J. Gras (see next) Pumping station point 2 (30 mins access) 9/11/2019 LHC status

BI MD - c/o JJG – One Shift PLL studies Measure the sensitivity of Marek’s new beam presence detection system Check the linearity of the fast BCT’s in the new configuration for nominal bunches Tune the High BW/Low Gain fast BCT calibration for the coming ion run Measure the High BW/Low Gain fast BCT sensitivity limit and linearity for low intensity bunches (ion run) Re-check BPM sensitivity limit Calibrate the abort gap over the whole ramp Check the abort gap acquisition gate timing resolution and stability Commission BGI in preparation to ions Check BSRT/BGI/BWS cross-calibration including corresponding emittance logging Test and compare bunch/bunch profile measurement via BWS and/or BSRT For all this, we would need the 2 rings for a few hours at 450 GeV then a ramp and again a few hours at 3.5 TeV. This would be really difficult to fit in a 4 hour slot. 8 would be perfect but we could try with 6. LHC status

Scheduled lift maintenance Some preventive maintenance has been requested on the LHC lifts, and agreed according to the following planning: Tuesday 5 October:             PM15 from 8h to 12h00; PM25 from 13h30 to 17h30 Wednesday 6 October:       PX24 from 8h to 12h00; PZ33 from 13h30 to 17h30 Thursday 7 October: PM85 from 8h to 12h00; PZ85 from 13h30 to 17h30 Tuesday 12 October :          PM56 from 8h to 12h00; PM65 from 13h30 to 17h30 Wednesday 13 October:     PZ65 from 8h to 12h00; PM76 from 13h30 to 17h30 Thursday 14 October:          PM45 from 8h to 12h00; PZ45 from 13h30 to 17h30 9/11/2019 LHC status