Ferrites in BE-BI Preliminary Data

Slides:



Advertisements
Similar presentations
Ferrite outgassing results G
Advertisements

FOTO 24/11/2011 PS FWS RELIABILITY 1 IMPROVING THE PS FWS RELIABILITY.
BI Outlook for BI Day 2012 Based on latest (last Monday) feedback from EN/EL XXX As foreseen originally Partially ‘As foreseen originally‘ Postponed.
Preliminary results and ideas for the SPS upgrade MDs on LHC beams in 2011 G. Rumolo on behalf of all the MD team (Elena, Thomas, Karel, Christina, Holger,
BISMV & H 0 -H - PSB INJECTION VACUUM REQUIREMENTS LIU - PSB meeting 29th October 2012 C. Pasquino, P. Chiggiato, J. Hansen.
H 0 -H - PSB INJECTION VACUUM REQUIREMENTS C. Pasquino, P. Chiggiato, J. Hansen PSB - H0-H- injection review meeting, 18th April 2013.
SPS New Wire Scanner Mechanics Review
Engineering Department ENEN Choice of the material for TCTP ferrite supports Collimation Working Group F. Carra, G. Cattenoz, A. Bertarelli,
SPL cryo-module conceptual design review Cavity, helium vessel and tuner assembly N. Valverde, G. Arnau, S. Atieh, I. Aviles, O. Capatina, M. Esposito,
1 28-Nov-2011 Dog-leg meeting «BE/RF» Current 30 GHz layout CTF3 CTF2 Overmoded 90 bend Mode converter Ø50 circular waveguide (existing line) 326 mm 1.
03-June-20131Christine Vollinger BE/RF The “Flat-Sample-Holder” (Flats) Method for Material Measurement Material parameters as relative permeability µ.
Fermilab, April 8 th, 2003F.Roncarolo 1 CERN SPS Emittance Measurements F. Roncarolo, CERN AB/BDI University of Lausanne Acknowledgments: B.Dehning, R.Jung,
PEP-II Machine Advisory Committee Meeting SLAC, April 15-17, 2004 HOM Issues in LER Ring and IR. Recent measurements and calculations. Sasha Novokhatski.
CLIC RF structure development meeting Structure cost study (introduction) G. Riddone,
BWSRE, B.Dehning 1 Bernd Dehning CERN BE-BI
880.P20 Winter 2006 Richard Kass 1 The Large Hadron Collider LHC is located at CERN CERN is located near Geneva Part of CERN is in France The LHC collides.
CLIC meeting 09/ Lars Søby, CERN AB/BDI1 PBPM: Precision Beam Position Monitor. WBCM: Wide Band Current Monitor. EUROTeV Diagnostics WP5
How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix January 2010.
The Quadrupole Pick-up in the CPS -intro and progress report PPC 3 Dec 1999 A. Jansson.
Next Steps, Priorities, Strategy for Spares Ray Veness.
1 EuroTeV High Bandwidth Wall Current Monitor Alessandro D’Elia CERN- Geneve.
Main features of PETS tank J. Calero, D. Carrillo, J.L. Gutiérrez, E. Rodríguez, F. Toral CERN, 17/10/2007 (I will review the present status of the PETS.
An Inductive Pick-Up (IPU) for Beam Position and Current Measurement
News and hot topics Impedance meeting 14/04/2014.
PSB semgrid - wire scanners measurements Emittance working group meeting 13/10/2015 Emiliano Piselli BE-BI-BL.
Challenges in Beam Instrumentation Rhodri Jones (BE/BI) LIU-2011 Event, 25 November 2011, CERN.
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
Impedance Working Group Update ICE meeting June 12 th 2013.
Vacuum assessment for BI equipment TE-VSC. Why do we need to assess BI components 10/6/2015 BI Beam Operational Spare Strategy Workshop No 2 2 The main.
Update on the TDI impedance simulations and RF heating for HL- LHC beams Alexej Grudiev on behalf of the impedance team TDI re-design meeting 30/10/2012.
親愛的吉姆舅舅: 今天吃完晚餐後,奶奶說,在家 裡情況變好以前,您要我搬到城裡跟 您住。奶奶有沒有跟您說,爸爸已經 好久沒有工作,也好久沒有人請媽媽 做衣服了? 我們聽完都哭了,連爸爸也哭了, 但是媽媽說了一個故事讓我們又笑了。 她說:您們小的時候,她曾經被您追 得爬到樹上去,真的嗎? 雖然我個子小,但是我很強壯,
Ralf Eichhorn CLASSE, Cornell University. Ralf Eichhorn, Cornell – Cornell’s HOM Beamline Absorbers – TTC Topical Meeting on CW-SRF ps bunch.
Requirements from BI and new instruments after LS1 LHC Optics Measurement and Correction Review; B.Dehning 1 Bernd Dehning CERN BE/BI
Status of CIEMAT work on PETS
Hardware Commissioning Review BDI Equipment
EUROTeV Diagnostics WP5
LIU Wire Scanner Project
F. Caspers, A. Grudiev, E. Métral, B. Salvant
CERN – Zanon discussions
System layout in PS ring and possible evolution
BE-BI Activities and Status: LHC and Injectors
Power and control electronics for the new fast wire scanners
PS status 10 August – 17 August 2017
ILC-SCRF Test Facilities considerations
EYETS David Hay EN-OSS.
LIU Wire Scanner Milestones June 2017
Outcome of recent impedance bench measurements on collimators
Fast Wire Scanner Prototype Mechanical Design
on behalf of the RF group
Thermo-mechanical analysis of the D3 dump in the TT2 line (PS)
Status of the BI Work Package in the LIU-PSB frame
PS operational beams 15 September 2017
Summary of ECRs for the YETS Booster, PS, ISOLDE and associated transfer lines (LIU + Consolidation) T. Birtwistle (EN-MEF-DC)
Beam Wire Scanner for PSB
2th EuCard Col/Mat WP Meeting
LIU Wire Scanner Series Costs
Beam Wire Scanners (PS prototype and LIU series)
'. \s\s I. '.. '... · \ \ \,, I.
Impedance working group update
News Request to install SLAC collimator in SPS
PS Machine Changes during the 2009 Shutdown
RF Contacts in LHC Beam Instrumentation
Review of ferrites used at CERN to damp HOMs: TE/ABT equipment
' '· \ ·' ,,,,
Elias Métral ( min, 19 slides)
Ch. Boccard, M. Krupa, G. Schneider, R. Veness, M. Wendt
ABP/RTL Main RTL Activities for 2007/8:-
Multiphysics simulations of impedance effects in accelerators
Current impedance issues
Presentation transcript:

Ferrites in BE-BI Preliminary Data Compiled by R.Veness with information from W.Andreazza, B.Dehning, D.Gerard, R.Jones, L.Soby

Introduction Definition Completeness In this context, a ‘ferrite’ is any material used for suppressing HOMs (i.e., could also be SiC or other) Completeness It was not possible to collect a complete picture of ferrite use in BI, as: The time available was limited Documentation for some systems is not complete or available

Ferrites in Wire Scanners PS FWS 5 new tanks installed in 2011/12 ‘FERROXCUBE’ PLT 100/100/6/H-4SD60 as per EDH 2542526 UHV cleaned at CERN, then heat-treated at 400 C 2 blocks installed per tank SPS BWS No recent modifications made to ferrites ‘FERROXCUBE’ 4S60 (same as above?) Treatment and quantity TBC

Ferrites in Wire Scanners PSB and LHC Information less clear for the moment Either 4S60 or Philips ferrites (from F.Caspers) Baked-out, but temperature TBC Quantity TBC

Wall Current Monitors PS WCMs CTF3 WCMs Installed in SS03 and SS95 Material T240/160/20-8C11 5 rings in each WCM Treatment TBC Also contain RF-absorber tiles CTF3 WCMs 5 pieces in 10 GHz WCMs

Other PS CODD pick-ups Each pick-up contains 2 tiles of RF-absorber ferrites