Page 1 Peng Xu, Philip Haves, James Braun, MaryAnn Piette January 23, 2004 Sponsored by the California Energy Commission and the California Institute for.

Slides:



Advertisements
Similar presentations
You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Advertisements

Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Sustainable School Design Creating Healthy, High Performance School Facilities Presented by Stephen M. Koontz, Energy Services Leader, Tampa Bay Trane.
UNITED NATIONS Shipment Details Report – January 2006.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt ShapesPatterns Counting Number.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt FactorsFactors.
Year 6 mental test 10 second questions
New Construction: Small Office Prescriptive Path.
Air Conditioners.
ACTIVE LEARNING PROCESS
Chapter 3. HVAC Delivery Systems
HVAC Basics Bin Yan HVAC – Heating, Ventilation, Air-conditioning.
Solve Multi-step Equations
Richmond House, Liverpool (1) 26 th January 2004.
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
BREAKOUT SESSION 2 Smart Grid 2-B: Grid Integration – Essential Step for Optimization of Resources Integrating Intermittent Wind Generation into an Island.
* A chiller capable of producing water temperatures of low 40s on the evaporator side and above 135° on the condenser side.
Chilled Beams TROX USA for Laboratory HVAC Applications
Improve Facility Operation through Commissioning-A Case Study Mingsheng Liu, Ph.D., P. E. University of Nebraska.
UCSD Medical Center - Hillcrest Campus Case Study Gerry White Facilities Design & Construction University of California, San Diego.
1 Radiant 101 Low Temp Distribution for High Efficiency Applications Tom Meyer CSME, GGP, CBCP, QCxP, EBCP Director, Government and Professional Development.
North American Mechanical Inc. School District of Cambridge A Business Relationship Presentation Use our energy to save yours®
Institute of Energy and Sustainable Development HVAC S YSTEMS E NERGY D EMAND VS. B UILDING E NERGY D EMAND I VAN K OROLIJA I NSTITUTE OF E NERGY AND S.
Program Overview February 25, Program Summary Approximately $14M in incentives per year Cap for Large Customers: $300,000 per year Prescriptive.
Lindbergh Field International Airport New Terminal Bill Mahoney LSW Engineers.
Energy Savings Impacts of the Advanced Energy Design Guide: Small Office Buildings Bing Liu, P.E. Research Engineer Pacific Northwest National Laboratory.
2 |SharePoint Saturday New York City
VOORBLAD.
BIOLOGY AUGUST 2013 OPENING ASSIGNMENTS. AUGUST 7, 2013  Question goes here!
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
© 2012 National Heart Foundation of Australia. Slide 2.
PS-5 Test Review. Questions 1 & 2 Distance – 60m/ magnitude only Displacement 10 m east/ magnitude and direction.
A/C Final Project: Design Builder
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Before Between After.
Benjamin Banneker Charter Academy of Technology Making AYP Benjamin Banneker Charter Academy of Technology Making AYP.
HEALTHCARE BUILDING AUTOMATION
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
Energy Saving in Hospitals: Hong Kong Initiatives
Subtraction: Adding UP
Equal or Not. Equal or Not
Januar MDMDFSSMDMDFSSS
1. 2 No lecture on Wed February 8th Thursday 9 th Feb Friday 27 th Jan Friday 10 th Feb Thursday 14: :00 Friday 16:00 – 19:00 HS N.
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
PSSA Preparation.
Chapter 11 Using Energy.
Energy Analysis Topics
1 PART 1 ILLUSTRATION OF DOCUMENTS  Brief introduction to the documents contained in the envelope  Detailed clarification of the documents content.
CON 4003 Construction Estimating Prof R. V. Locurcio.
3 - 1 Copyright McGraw-Hill/Irwin, 2005 Markets Demand Defined Demand Graphed Changes in Demand Supply Defined Supply Graphed Changes in Supply Equilibrium.
Smart Devices. Smart Buildings. Smart Business The Potential for DCx Technology Enabled HVAC Operation Scot Duncan, P.E.
Load Shifting and Peak Load Reduction using Building Thermal Mass
Wurster Hall MBCx Project October 30th, Project Overview Project Goals Project Objectives Identify Low Cost/No Cost Measures Identify Retrofit.
Michael Reilly, Jr. – Mechanical Option Advisor – James Freihaut, PhD & Dustin Eplee The Pennsylvania State University Nassau Community College Life Sciences.
The Data Center Challenge
Presentation transcript:

Page 1 Peng Xu, Philip Haves, James Braun, MaryAnn Piette January 23, 2004 Sponsored by the California Energy Commission and the California Institute for Energy Efficiency A Case Study of Precooling with Zone Temperature Reset in a Commercial Office Building

Page 2 Outline Aim Test site description Precooling and demand shedding strategies Test results Utility analysis Conclusions and future work

Page 3 Aim Demonstrate the potential for reducing peak-period electrical demand in a moderate-weight commercial building using building structural mass.

Page 4 Executive Summary Precooling and zone temperature reset can shift up to 100% of cooling power from on- to off-peak in a moderate- weight commercial buildings Electricity peak demand reduced by as much as 2.3 W/ft 2 Potential for cost savings when combined with Critical Peak Pricing

Page 5 Case Study - Introduction Started in August 2003 Purpose - preliminary study to assess potential and need for further work –Potential demand reduction/load shifting in moderate-weight buildings –Effectiveness of precooling and zone temperature reset –Thermal comfort

Page 6 Test Site Description Medium-sized government building –Santa Rosa, CA –80,000 ft 2 (40,000 ft 2 office + 40,000 ft 2 courthouse) –3 stories Relatively low mass building structure –6 in. concrete floor, 4 in. concrete wall, medium furniture density, standard commercial carpet High window-to-wall ratio –Floor to ceiling glazing on south and north façade Typical internal loads Number of occupants –~100 (office side)

Page 7 South Facade

Page 8 North Facade

Page 9 Windows Single glazing Tinted glass Internal blinds

Page 10 Cooling Plant West wing: three 75-ton, 30-year old McQuay air- cooled chillers East wing: two 60-ton, 10- year old Carrier air-cooled chillers Constant-speed water pumps, one for each chiller Two stage compressors

Page 11 HVAC Secondary Systems Five VAV air handling units (three single duct & two dual duct systems): Variable-speed supply and return fans VAV zones DDC control (Alerton) No global rest of zone temperature

Page 12 Building Operation 5 am - 8 am - start up 8 am - 5 pm - occupancy 2-3 hot/cold calls per month No major faults, some modest problems: –One undersized cooling coil –Some air balance problems –Lack of reheat coils in single-duct systems causes temp control problems

Page 13 Precooling & Zonal Reset Strategies

Page 14 Monitoring Existing: –Whole building power meters –Chiller power meters –Weather station –HVAC performance data from EMCS ~500 data points 15 minute intervals Added: – AHU fans power meters –Operative temperature sensors

Page 15 Operative Temperature & Comfort Convective heat exchange Radiant heat exchange Room Regular temperature sensor globe Operative temperature sensor screen

Page 16 Peak OA Temperature vs. Peak Demand

Page 17 Classification of Weather Conditions Hot days Warm days Cool days

Page 18 Comparison of Baseline & Test Conditions

Page 19 Tests Performed

Page 20 Cool Days – Limited Precooling

Page 21 Warm Day – Limited Precooling

Page 22 Extended & Limited Precooling

Page 23 Hot days – Extended Precooling

Page 24 Chiller Power: Limited Precooling 0.7 W/sf shed

Page 25 Results – Fan Power

Page 26 Results – Zone Temp

Page 27 Critical Peak Pricing (1 of 3) Operating time –CPP high price: 3:00pm –6pm –CPP moderate price: 12:00pm –3:00pm CPP days (12 days: 5/1 – 10/31) –Average of maximum outside air temperatures in San Francisco, San Jose, Sacramento and Fresno > 98 o F

Page 28 Critical Peak Pricing (2 of 3) Current tariff: A-10S Non CPP Day Rate –On-peak credit, $0.0559/kWh, (12 pm- 6 pm) –Part-peak credit, $0.0050/kWh, (8:30 am-12 pm) CPP Day Rate –Moderate price, $0.24/kWh (12 pm – 3 pm) –High price, $0.82/kWh, (3 pm-6 pm)

Page 29 Critical Peak Pricing (3 of 3)

Page 30 Market Potential – Cooling in Office Buildings State-wide peak demand ~50GW Commercial cooling - largest contributor: 15%, ~7.5 GW

Page 31 Conclusions Precooling & zone temp reset can shed up to 80 –100% of the cooling peak load, without comfort complaints, even in relatively high outside temperature conditions (90 o F) Benefits of nocturnal precooling are unclear Economic savings can be made if combined with CPP or similar DR programs Extended Precooling + DL Hot days Time (hour) Whole Building power W/sqft Extended precooling 1baseline 2.3 W/sf shed