Process Excellence L6S The “8 Wastes” Discussion

Slides:



Advertisements
Similar presentations
Using Lean Ideas to Get Jobs to Production Faster
Advertisements

Bringing Sanity to Clinical Work Life Lean in Healthcare Michael Nelson, MD Blue Corn Professional Services, LLC.
5S training Office Environments.
The information contained in this presentation, the source code and underlying program are protected by copyright owned by PlusDelta Technologies, LLC.
Transactional Change in Action - Using Lean Principles
CONTINUAL IMPROVEMENT
02 | Define an Effective End-to-End Software Development Lifecycle Steven Borg | Co-founder & Strategist, Northwest Cadence Anthony Borton | ALM Consultant,
Introduction to Lean. Benefits of Lean Why go Lean? Improvements in: –Customer service –Quality and efficiency –Staff morale –Internal communication and.
Transportation Waste Definition: the unnecessary act of taking or carrying someone or something from one place to another Office example: Movement of paperwork;
Value Stream Mapping A Laboratory Tool Laurie Peterson-Wright Colorado Department of Public Health and Environment Laboratory Services Division.
Lean Supply Chains Chapter Fourteen McGraw-Hill/Irwin
An introduction to Lean tools and methodologies
Welcome. Slides and a recording of the presentation will be available on our blogs at:
1.Over Production: Producing more than is needed Over Production: Over Production: 2.Waiting: Idle Time (Down Time) Waiting: 3.Non-Utilized Talents: Under.
Healthcare Performance Group Lean Process Improvement and Value Stream Mapping Clayton State University Kelley Hundt Paul Todd.
1 © 2005 Superfactory™. All Rights Reserved. Lean Office - 5S and Visual Controls Superfactory Excellence Program™
Chapter 16 - Lean Systems Focus on operations strategy, process, technology, quality, capacity, layout, supply chains, and inventory. Operations systems.
JIT/Lean Production Chapter 13.
CONTINUOUS IMPROVEMENT PROGRAM
The Value of Lean Thinking Presented by: Brian D Krichbaum Process Coaching Incorporated.
© ABSL Power Solutions 2007 © STM Quality Limited STM Quality Limited Introduction to Lean Manufacturing TOTAL QUALITY MANAGEMENT Lean Manufacturing.
LEAN and Sustainable Supply Chains CHAPTER 13. Learning Objectives 1. Describe how Green and Lean can complement each other. 2. Explain how a production.
1 Chapter 16 Just-In-Time Systems. 2 JIT/Lean Production Just-in-time: Repetitive production system in which processing and movement of materials and.
 2000, QualityToolBox.com, LLC, all rights reserved A STRATEGY FOR PERFORMANCE EXCELLENCE.
Lean and Clean—Friend or Foe? Great Lakes Regional Pollution Prevention Roundtable.
BHS Introduction to Lean September 24th, Agenda Welcome and Introductions Understanding Lean What is Value Identifying Waste Brief Introduction.
WASTE REDUCTION AND PRODUCTIVITY IMPROVEMENT
Value Stream Management for Lean Healthcare ISE 491 Fall 2009 The Identification of Waste in Healthcare - Lecture 4.
LeanSigma ® Facilitator Training Module 5 – Waste.
Value Analysis/ Flow Analysis
Lean Basics Dewey Warden.
The 8 Wastes are Destroying Your Profits! Presented by: Brian D. Krichbaum Process Coaching Incorporated.
New Directions Learning & Development  All Rights Reserved. Lean Your Library: How Lean Six Sigma Strategies Can Improve Operations.
LeanSigma ® Fundamentals Module 4 – Specify Value.
What is DOWNTIME? Scott Thor © Variance Reduction International, Inc. (VRI), All Rights Reserved.
Philosophy and Key Concepts
Lean Production (MUDA)
Lean Manufacturing Chapter 15 pp June 29, 2012.
(And How to Tame Them) The Seven Deadly Wastes (And How to Tame Them)
Lean Office Training YOU to Recreate Your World Course Agenda »Lean office overview »Definition of waste »Implementing lean tools »Next steps.
Companies must provide customers with world-class quality, delivery and service. Customers won’t accept anything less. The globalization of markets means.
“Without the Cost of Waste …”
5S REFRESHER What is 5S and why do we want to do it? Six Sigma Simplicity.
Energy efficiency and reliability First year project rev AH BEE GOH 19 MARCH April 2011.
Lean Healthcare - The Identification of Waste in Healthcare
7 Types of Waste –C –Correction –O –Overproduction –M –Movement of Material & Information –W –Waiting –I –Inventory –P –Processing Lean Principle: Lean.
Value Stream Management for Lean Healthcare ISE 491 Fall 2009 The Elimination of Waste in Healthcare - Lecture 5.
Kaizen Eventing: The process of observation and the elimination of waste in a process.
Shelve more with less – with Lean Nancy Kress University of Nevada Las Vegas.
Waste reminder The 8 Wastes To remember The 8 Wastes, you can use the acronym “DOWNTIME” Defects Efforts caused by rework, scrap, and incorrect information.
JUST IN TIME MANUFACTURING ‘The demand driven operation’
Presented by B rons & S ilva. What is Lean? “Lean is a customer-centric methodology used to continuously improve any process through the elimination of.
16-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
WORK STUDY HOW THE TOTAL TIME OF A JOB IS MADE UP (IE411)
Introduction to Motion and Time Study
JIT/Lean Production Chapter 13.
Transportation Waste Definition: the unnecessary act of taking or carrying someone or something from one place to another Office example: Movement of paperwork;
Mel Wendell – Mountain Pointe High School
Your own footer Your Logo.
Lean Manufacturing Series
COMPUTER INTEGRATED MANUFACTURING
Process-Flow Analysis
Lean Healthcare - The Identification of Waste in Healthcare
Pricing your Products to be Profitable
Chapter 2 Office and knowledge work
Ideas and skills not used Movement of people or material
8 Wastes of Lean Waste Over-production Defects Inventory
8 Wastes of Lean Last Revised: 8/8/2017.
L Maximizing Resources: Applying Lean Six Sigma Principles to Your Print Operation Monday March 18, AM – 12 PM.
Introduction to Lean and Lean Training
Presentation transcript:

Process Excellence L6S The “8 Wastes” Discussion Explanation and Examples www.freeleansite.com

Process Excellence L6S The “8 Wastes” Discussion Preface: Understanding the 8 wastes is the foundation of thinking lean. Without this detailed comprehension, you will not be able to see the wastes being generated in your business, and without seeing the wastes, they can’t be eliminated.

Process Excellence L6S The “8 Wastes” Discussion A “Lean” or “Lean Thinking” definition is: “A systematic approach to identifying and eliminating the Eight Wastes (which are considered non – [customer] value adding activities) through continuous improvement initiatives by flowing the product at the 100% pull of the customer”. What are the Eight Wastes?

Process Excellence L6S The “8 Wastes” Discussion Waiting: Description: There is a stoppage in the item / work within the process. Manufacturing samples: Instrument stoppage, bottlenecked tasks, apparatus substitution Office and Service examples: System interruptions, system reaction intervals, authorizations, data from supply partners / clients

Process Excellence L6S The “8 Wastes” Discussion Defects: Meaning: Every type of scrap, faults, mistakes or rectification caused by improper completion of initial work. Manufacturing Instances: Construction of flawed pieces, leftovers, or excess. Service / Office samples: Information input inaccuracies, scheme mistakes, work modification orders, and bill miscalculations.

Process Excellence L6S The “8 Wastes” Discussion Unneeded Processing: Explanation: Wasting time on steps that are not required. Manufacturing samples: Incorporating superfluous phases to develop the parts, ineffective handling because of inadequate implements, and product design. Service / Office illustrations: Re-entering information, unneeded reproductions, needless, or unwarranted reports.

Process Excellence L6S The “8 Wastes” Discussion Inventory: Meaning: All items that are in surplus, all methods of batch processing. Manufacturing beyond what client / customer requires. Manufacturing samples: All extra inventory, group handling. Service / Office instances: Office materials, marketing brochures, batch processing transactions.

Process Excellence L6S The “8 Wastes” Discussion Excessive Motion: Description: Movement of individuals. Manufacturing illustrations: Reaching for, searching for, or piling parts, tools, etc. Service / Office examples: Traveling to/from photocopier, central filing, fax machine, or other offices.

Process Excellence L6S The “8 Wastes” Discussion Transportation: Explanation: Shifting of work or correspondence from one phase to the next phase in the procedure. Manufacturing samples: Transfer supplies, pieces, or completed merchandise into and out of storage. Service / Office instances: Shifting of information or paperwork from location to location, room to room, or folder to folder.

Process Excellence L6S The “8 Wastes” Discussion Overproduction: Description: Creating extra, earlier, or quicker than is needed by the subsequent individual. Manufacturing examples: Parts / Merchandise piling up at a sluggish downstream pace. Service / Office instances: Laser printing correspondence earlier than it is actually required, buying pieces earlier than they are wanted, providing paperwork earlier than required by the subsequent individual.

Process Excellence L6S The “8 Wastes” Discussion Underutilized Employees: Explanation: Workers' inventiveness, concepts, and aptitudes are not entirely employed. Manufacturing instances: Overlooking concepts, talents, and enhancements by not paying attention to personnel. Service / Office examples: Restricted worker power and accountability for rudimentary jobs, management command and control.

Process Excellence L6S The “8 Wastes” Discussion Recognize your operation in these 8 wastes? In some organizations, as much as 40% of the production effort is spent on these wasteful activities. How much of your time do you spend fighting the fires, expediting parts, or other activities which do not help reduce the waste in your operation? Employees, managers, executives, and corporate investors will all succeed when the 8 Wastes are identified and removed.