SNS PPU Cryomodule Instrumentation

Slides:



Advertisements
Similar presentations
1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
Advertisements

Liquid H 2 Absorber Production Contents (1)MICE Absorber Status (2)MICE Absorber Modification (3)Plan/Schedule (4)Summary MICE CM-23 in HARBIN Shigeru.
Mar 13, Low-energy RHIC electron Cooler (LEReC) CRYOGENICS Mar 13, 2014.
The Use of Small Coolers for Hydrogen and Helium Liquefaction
Absorber R&D and Test Results CM16 at RAL, Oct 8-11, 2006 Shoji Suzuki & Shigeru Ishimoto KEK.
PEUGEOT 206 INSTALLATION 99’— 05’ TU5JP4
Internal Cryomodule Instrumentation Sensors, Actuators, Heaters, and Wiring ERL Main Linac Cryomodule 9/5/2012 Peter Quigley Internal Design Review.
ORNL is managed by UT-Battelle for the US Department of Energy Commissioning and Operation of the Horizontal Test Apparatus at SNS Presented at: CEC/ICMC.
MICE CM February 08Jean-Sébastien GraulichSlide 1 Detector DAQ Hardware Status o Introduction o Preliminary list o Plan for action o Summary Jean-Sebastien.
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
Heat load study of cryomodule in STF
Internal Cryomodule Instrumentation ERL Main Linac Cryomodule 10/10/2015 Peter Quigley, MLC Design Review.
Overview of AMS-02 Changes due the addition of the Permanent Magnet
April, 2009 ERL SRF CRYO MODULES AND CRYOGENIC SYSTEM.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Roberto Than CRYOGENICS SYSTEM.
CRYOGENICS FOR MLC Cryogenic Piping in the Module Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
ERL: G-5/e-Gun Cryogenic & Pressure Safety Committee Review ERL G-5/e-gun Beam Line Vacuum Failure Analysis April 24, 2009.
1 HIGH ENERGY ACCELERATOR RESEARCH ORGANIZATION KEKB Review Committee/ NAKAI Hirotaka KEK Crab Cavity - Cryogenics - KEKB Crab Cavity Group - presented.
Agenda – Basics of cavity integration into CAST Introduction (M Davenport) Information exchange 2016 – Vacuum in cold bore – 2 cavities Cooling RF Cavities.
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
1 K.Jensch, D.Kostin, DESY - Cryomodule components List S1 – DESY parts DESY parts for the S1 Cavity-String.
Shrikant_Pattalwar TTC 2015 Dec 1, 2015 SLAC 1 Horizontal Tests in a Vertical Cryostat Shrikant Pattalwar STFC Daresbury Laboratory UK.
Installation of the T600 at Fermilab CSN2, September 22,
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
LCLS-II Prototype Cryomodule Vacuum Vessel and HGRP Tom Peterson 4 December 2014 Design Review.
-1- Steve Virostek (LBNL) and Li Wang (SINAP) Instrumentation for the MICE Coupling Coil Steve Virostek Lawrence Berkeley National Lab February.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
Reliability of SNS Superconducting Linac April 12, 2011 Jeff Saunders SNS/ORNL.
Status of Vertical Test Stand at RRCAT P Shrivastava, P Mohania,D.Baxy, Vikas Rajput S C Joshi, S Raghavendra,S K Suhane RRCAT, Indore November 26, 2012.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
Extra / Discussion Slides. 2 1.Helium Top Fill Port Add extra CF/ISO flange as collar so that the weld-region is not disturbed 2.Helium bottom FillCF.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
LCLS-II Prototype Cryomodule Darryl Orris 21 January 2015 Final Design Review: Instrumentation.
Vishy Ravindranath LCLS-II 2 K Cold Box FDR March 9, 2017
Teleconf ACS – FREIA 28th March 2017
Mechanical and cryogenic configurations
Cryomdoule Test Stand.
Dana Arenius LCLS-II 4.5K Cold Box Director’s Review November 16, 2016
CERN – Zanon discussions
Design of the Injection Can
FRIB Cryogenic Support
VELO Thermal Control System
Sensors in the S1-G Cryomodules (Updated )
Overview of Mechanical Design
VELO Thermal Control System
Cryostat design Mechanical design: Thermal screens: Specifications:
2K Cold Box Mechanical Design
Alignment of Main Linac Cryomodule (MLC)
SNS PPU Cryomodule Instrumentation
Cryomodule Assembly Plan
CEPC-650MHz Cavity Cryomodule
Prototype cryomodule development
SNS PPU Cryomodule End Cans
SNS PPU Helium Vessel Design and Assembly
CRYOMODULE FINAL ASSEMBLY
SNS PPU Cryomodule Thermal Shield
SNS PPU Cryomodule Vacuum Vessel
SNS PPU Cryomodule Space Frame
UPPSALA UNIVERSITY_GERSEMI PROJECT
SNS PPU Helium Vessel Design and Assembly
SNS PPU Cryomodule Space Frame
SNS PPU Cryomodule Thermal Shield & MLI
SNS PPU CRYOMODULE FDR Magnetic Shields Gary Cheng June 10, 2019.
SNS PPU Cryomodule Design Overview
CRYOMODULE FINAL ASSEMBLY
SNS PPU CRYOMODULE PDR Cleanroom Assembly Katherine Wilson
J. Fleiter, S. C. Hopkins, A. Ballarino
Presentation transcript:

SNS PPU Cryomodule Instrumentation SNS PPU CRYOMODULE FDR SNS PPU Cryomodule Instrumentation Peter Owen June 10, 2019

Outline Instrumentation Overview Changes for PPU Updates since PDR Response to Recommendations & Comments Items SOW & Procurement Plan

Instrumentation Overview Cernox temperature sensors Field Probe cable Heaters Liquid level probes Instrumentation port flanges Vacuum vessel pressure sensors Helium circuit pressure transducers* FPC instrumentation* *Final parts provided by SNS

Cernox Temperature Sensors - Cavity Cernox Temperature Sensors (38 per CM) CX-1050-CU-HT-1.4L All mounted external to helium circuits Cavity, helium vessel & FPC (6 per, 24 total) Helium Vessel (low and high), FPC Flange, Beam Pipe, FPC 1/3 from end (x2) Sensors through J2 feedthroughs on instrumentation ports (slide 9) FPC flange FPC body (x2) He Vessel High He Vessel Low Beam Pipe

Cernox Temperature Sensors – End Cans Surge tank Cernox Temperature Sensors (38 per CM) Surge Tank (2 total) Surge tank sensors through J23 feedthroughs on instrumentation port #1 (slide 9) End Cans (12 total) Supply End Can (shield inlet) x 2 Return End Can (HX HP inlet & outlet, HX LP inlet & outlet, shield outlet) x2 10 Pin CF feedthroughs on end can top plates Shield supply (1) 6 pin feedthrough on CF Shield exit HX LP inlet HX LP outlet HX HP outlet HX HP inlet (2) 10 pin feedthroughs on CF

Field Probe Cable SNS provides the field probe with the cavities Will use original SNS design for cable 72 inches long, CRM9007000-1059 SOW CRM9007000-1059 exists but need to remove reference to HOM cables Type N connector at warm end on instrumentation port (J6) Gore Phaseflex cable 0XN01R010720 FP cable through J6 feedthroughs on instrumentation ports (slide 9) FP Cable heat sink on thermal shield

Heaters One 100 watt heater in each helium vessel Kapton foil type heater mounted on G10 plate Two heaters through each 8 pin cryogenic feedthrough Between cavities 1&2, and 3&4 Through J1 feedthrough on instrumentation ports (slide 9) 8 pin feedthrough for two heaters between cavities Cavity 1 Heater

Liquid Level Probes Two liquid level probes in helium vessel #1 Single 8 pin cryogenic feedthrough on helium vessel exit Single 10 pin feedthrough on top of vacuum vessel near return end flange Mini CF port for 10 pin feedthrough 8 pin feedthrough in return header Liquid Level Probes

Instrumentation Flange Port #1 Port #2 Port #3 Port #4 One instrumentation port per cavity/helium vessel Field Probe (Type N) Port 1 only, Surge tank CERNOX diodes, 6 pin feedthrough on mini CF Ports 2-4 blank flange Cavity/helium vessel & FPC CERNOX diodes 19 pin feedthrough Heater, Tuner motor and limit switches 19 Pin feedthrough J2 J1 J23 J6

Instrumentation Feedthrough (1) 6 pin feedthrough on CF (2) 10 pin feedthroughs on CF Liquid He Level J8 Vacuum Pressure Gages Port #5

Vacuum Vessel Pressure Sensors Cold Cathode Gauge (2) Convectron Gauge (1) Isolation and pump out valve Mounted to NW 40 flange on vacuum vessel All JLAB supplied Port 5 (NW 40) Pressure manifold at SNS Ref. P&ID R8U-8200-P001r0

Pressure Transducers a b c c a d Three on end cans (supplied and installed at SNS) High and low pressure for primary circuit Surge tank pressure 30/30 dial gauge and mounts for transducers (Supplied and installed by JLab) a b c c a d Typical sub atmospheric pressure transducer manifold Isolation valve 30/30 dial gauge Low and high pressure transducer with VCR connectors Pump out port with VCR Surge tank Honeywell transducer with VCR adaptor

FPC Instrumentation All supplied by SNS Additional instrumentation installed at SNS on air side components Heater assembly (x2) Thermocouple (x2) and thermal switch Window for Arc Detector Cold Cathode Gauge (x2) Electron Probe Thermocouple on exit cooling tube

FPC Instrumentation Panel Support for FPC instrumentation connectors Plate and connectors - Jlab Sensors and wire - SNS CRM-900-1000-000

Changes for PPU Changes relative to the HB spare module Will use all Cernox temperature sensors, radiation durability (CX- 1050-CU-HT-1.4L) Added threaded mounts for the temperature sensors on the helium vessel, mechanical mounts for the end can Eliminated the HOM connections on the four instrumentation ports Changed one port to a mini-CF connection for the surge tank temperature sensors on Port 1 Ports 2-4 will have a blank flange

Updates since PDR Researched current vendors and part numbers Updated drawings with current schematics and part numbers CM Wiring Diagram 104212000-M8U-8200-A001 End Can Wiring Diagram 104212000-M8U-8200-A002 SNS High Beta Cryomodule Instrumentation & Control Interface Table updated 104210200-M8U-8200-A007 Instrumentation drawings are either signed off, or final checking

Updates since PDR From the PDR Review in February

SOW and Procurement Plan Create a SOW for Field Probe Cable (CRM9000000-1028) Same as previous SOW, remove mention of HOM cables Test FP cable with cryocycling Begin writing requisitions for instrumentation when funds are available Many items sole-source eg. Cernox - Lakeshore

Instrumentation Overview Changes for PPU Updates since PDR Peter Owen powen@jlab.org Instrumentation Overview Changes for PPU Updates since PDR SOW & Procurement Plan

Backup Slides

CERNOX Temperature Sensors – Overview Location # CERNOX Cavity (6 per) 24 Surge Tank 2 Supply End Can Return End Can 10 Total 38