Agenda modifications.

Slides:



Advertisements
Similar presentations
Varied Approaches to Effective Hybrid Instruction Ensuring Quality and Active Participation Nancy Risch & Christina Toy Caldwell Community College and.
Advertisements

An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
Project Overview How to get here…. Half Way to the Test Run October 18, 2012HPS Project Overview2 …starting from here? John Jaros HPS Collaboration Meeting.
Controls & LLRF ILC Controls Telecon August 17, 2006 John Carwardine RDR Report Writing.
5 May 98 1 Jürgen Knobloch Computing Planning for ATLAS ATLAS Software Week 5 May 1998 Jürgen Knobloch Slides also on:
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt CBM Collaboration meeting Status Interim MoU J. Eschke, GSI.
19 November 98 1 Jürgen Knobloch ATLAS Computing ATLAS Computing - issues for 1999 Jürgen Knobloch Slides also on:
Introduction JRA1 Meeting, Hamburg January 30 th 2008 Ingrid-Maria Gregor DESY.
Atlas Software May, 2000 K.Amako Status of Geant4 Physics Validation Atlas Software Week 10 May, Katsuya Amako (KEK)
Marco Cattaneo, 3-June Event Reconstruction for LHCb  What is the scope of the project?  What are the goals (short+medium term)?  How do we organise.
David Hitlin EMC R&D Meeting April 1, Responsibilities ItemResponsible institution/person LYSO crystal development, order optimization Forward EC.
CLUE WG IETF-85 Mary Barnes (WG co-chair) Paul Kyzivat (WG co-chair)
Marco Cattaneo, 20-May Event Reconstruction for LHCb  What is the scope of the project?  What are the goals (short+medium term)?  How do we organise.
Workshop Structure-Detector Agenda structure similar to last two meetings –Two subsystem parallel sessions today and tomorrow –ETD, DGWG, Simulation Parallel.
CERN participation in EU project CREMLIN CERN-internal introduction meeting July 17 th 2015 Lucie Linssen.
Detector Goals and General Syst. System Parallel Joint Parallel DGWG Mechanical Integ. TDR Organization System Summaries WORKSHOP Structure-Detector +
News and Miscellaneous Didier Contardo, Jeff Spalding UPO August 03/ UPO 08/03/12.
Status of ETD D. Breton, U.Marconi, S.Luitz WS summary plenary session October 1 st 2010 D. Breton - SuperB Frascati Workshop – September 2010.
Towards Snowmass Jul. 13, 2005 Y.Sugimoto. Charge for Detector WGs Charge for Concept Groups: work towards a baseline design define performance criteria.
Project Management PTM721S
Itzhak Tserruya Weizmann Institute of Science
TDR and planning session
SCT Project Management Issues
Roberto Calabrese Ferrara University and INFN
Organization and Goals for the Workshop
DQM4HEP Monitoring Status Tom Coates AIDA-2020 Second Annual Meeting
Page Headline Beam Commissioning Adam Bartnik.
TC activities.
UPO meeting Nov. 29, 2013 D. Contardo, J. Spalding News
CERN meeting report, and more … D. Breton
Computerized Systems in Clinical Research
WP5: Micropattern Gas Detectors
ETD/Online Report D. Breton, U. Marconi, S. Luitz
Draft SuperB Organization Chart for TDR Phase
Workshop Goals for the Detector Groups
Savannah to Jira Migration
What Is Next for SiD ? H.Weerts Argonne Nat. lab..
Summary/Conclusions of the SuperB PID Sessions.
Francesco Forti University and INFN, Pisa
Accelerator Physics Technical System Group Review
HCA 459 HOMEWORK Perfect Education/ hca459homework.com.
Measuring Project Performance: Tips and Tools to Showcase Your Results
(CMS GEANT4 simulation)
Quantitative Project Risk Analysis
There are lots of patterns or trends of the periodic table!!!
SKADS Controller’s Meeting Timeline Annual Financial Report
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
Internal Draft.
DRAFT Implementation Guide
Status, Misc Elton Smith Feb 21, 2003.
Adrian Bevan / Dave Brown / Marco Ciuchini / Achille Stocchi
Status of the Physics White Paper
Reporting 25 April 2018.
TITLE OF POSTER Line 1 TITLE OF POSTER Line 2
Component 4 Effective and Reflective Practitioner
Physics-based simulation for visual computing applications
2018 OSEP Project Directors’ Conference
TITLE OF POSTER Line 1 TITLE OF POSTER Line 2
Step 18: Map Sales Process to Acquire Customer
Grantee Guide to Project Performance Measurement
May 2002 Project: IEEE P Working Group for Wireless Local Area Networks (WLANs) Submission Title: Liaison Report, May 2002 Date Submitted:
AHT Title Goes Here Name (s), Organization, CEOS Affiliation
ETD parallel session March 18th 2010
Two-beam Test-stand Design and Construction Status
An example for theory-based evaluation ERDF Berlin
Warm Up Take out a piece of paper and answer the following question: List 5 economic and social characteristics of a developed nation and 5 of a non-developed.
Practice Geometry Practice
Computing production Need for detector studies
Detector Proto-Technical board Sep 30, 2010
Higgs physics at CEPC Physics workshop
Presentation transcript:

Agenda modifications

Focus of Workshop Progress on Global System and Integration Issues Geometry Working Group Computing & Simulation Electronics Trigger and Data Acquisition Report status progress and refine understanding needed towards final subsystem and general system design Design R&D (Beam Tests & Milestones) Integration Organization Manpower, Institutions Costs & WBS White paper-TDR Documentation Now  White paper. Milestones/outline/text  TDR (end of 2010 +?). Lots of progress in all areas, but more active people needed. Please bring your friends and colleagues! 2

Workshop Goals and Questions Relatively short time from last workshop White paper Writing delayed w.r.t. original goals Outline available on SVN - https://sbrepo.pd.infn.it:8910/DOCS/DWP09/ Good progress in some systems (like ETD) First draft text before Xmas ? DGWG/global geometry progress Closure on BW EMC, DCH radius Plans for reaching closure on other questions Electronics workshop at CERN Lots of issues and questions Need work on Lvl 1 Need active participation from all systems