Western Orbital: M11 J11 Park and Ride Provision

Slides:



Advertisements
Similar presentations
A34 Corridor Strategy Strategic Route Improvements 25 th November 2004 working together with.
Advertisements

CityCo, Piccadilly Hoteliers Forum
Windsor Park & Ride (Overview & Scrutiny Panel – 29 th October 2007)
Future Airspace Strategy (FAS) Heathrow Airport Consultative Committee 31 st March 2010 Phil Roberts Assistant Director of Airspace Policy 1 1.
Smartertravel >>> ATT and NCN Programmes New Programmes smartertravel >>> 1.
DEVELOPING THE TRANSPORTATION NETWORK IN WREXHAM ‘Delivering our statutory functions’ Environment & Regeneration Scrutiny Committee 13 December 2007 Transportation.
Paul Roberts – TIF Technical Manager Presentation to the TPS – 3 June 2009.
Overview of the IT 3 Initiative CONFIDENTIAL Discussion Document September 2008.
Joint Transport Forum I Rapid Transit Line 2 Our Future Transport I West of England Sub Region.
Mid Wales LTP Stakeholder Workshop 3 rd October Presentation by Ann Elias and Janice Hughes.
Local Transport Plan 3 Vision and Issues. The Local Transport Plan Will replace LTP2, which expires 31 March must have LTP3 approved and operative.
What Transport for Cambridge? The Sub-Region Development Strategy and Transport Policies.
TRANSPORT The Cambridge Futures response to the Draft Structure Plan Dr Tony Hargreaves, Cambridge Futures.
BELMONT TRANSPORT PACKAGE A49 – A465 Link Meeting 19 March 2013.
BELMONT TRANSPORT PACKAGE A49 – B4349 (Relief Road Southern Section) Meeting 14 June 2013.
Communities M40 J12-J14 – Data Analysis, Modelling and Scheme Development.
Planning Scotland’s Seas consultation Seas Consultation 2013.
Simon Amor Asset Development Manager
STAMFORD CAPACITY AND LIMITS TO GROWTH STUDY SOUTH KESTEVEN DISTRICT COUNCIL FINAL REPORT PRESENTATION PRESENTERS: UNA McGAUGHRIN JESSE HONEY 14 TH DECEMBER.
Strategic Environmental Assessment (SEA) A Scottish replacement to Air Passenger Duty (APD) Elaine McCall Environmental Assessment Team The Scottish Government.
Greater Nottingham Aligned Core Strategies Option for Consultation (15 th February until 12 th April 2010) Karen Shaw Nottingham City Council.
19th November 2015 Wealden Local Plan – Issues, Options and Recommendations East Hoathly with Halland Parish Council.
Invest in Renfrewshire Partnership Conference on Employment & Economic Development 16 June 2016 City Deal and our Role in the Regional Economy Mary Crearie.
Transport Strategy in Cheshire West and Chester Alison Knight Director of Places Strategy 3rd June 2016.
Highways Maintenance Contract Commissioning Project
East Sussex Strategic Partnership Transport Update 25 April 2017
West of England Joint Transport Study
Sustainable Urban Mobility Plans: Monitoring & Evaluation
Scottish Capital Investment Manual
Milton Road LLF Design Engagement Paul van de Bulk 12 September 2017.
Tourism Growth Partnership – Round 5
Strategic Transport Forum Friday 15th September 2017
Cambourne to Cambridge Better Bus Journeys
Abbey Creative Quarter Update September 2016
NGTA Halton Planning and Public Works Committee
A47 / A12 Corridor Improvement schemes
Western Orbital Local Liaison Forum 11TH September 2017.
Cambourne to Cambridge
Midlands Connect: A Pan Midlands Strategic Transport Partnership
Presented by: Jim Hefferan Project Director ICB Upgrade Project
Grey County Transportation Master Plan
A future benefit for the South Cheshire infrastructure
Cambourne to Cambridge Better Bus Journeys – End of Stage Report
Peter Molyneux Transport for the North.
JMP EDA Transport Study South Marston Samantha Howell Principal Transport Planner Strategic Growth and Regeneration Team.
Fishermans Bend Draft Framework Transport Recommendations
Cambourne to Cambridge Better Bus Journeys East of M11 Workshop Summary 13 November 2018.
Shaping the future of Laverstock and Ford Parish
A future benefit for the South Cheshire infrastructure
2040 Long Range Transportation Plan Update
Update to NLAG board 24th November 2015
1300+ High School Seats School Board Work Session May 15, 2017
GCF business model.
Presentation to LEP Performance and Investment Committee 16 May 2018
KEYNOTE STAGE SPONSOR.
Creating an Innovation and Culture Change Plan
3 November 2017 Fraserburgh and Peterhead to Aberdeen Strategic Transport Study: STAG Part 1 Plus Bob Nicol: Project Director David Murtagh: Project Manager.
Members’ Workshop Wednesday 17th April 2019 Woodhill House Aberdeen
A51 Parish Councils’ Meeting A51 Study Update
Cambourne to Cambridge Better Bus Journeys: On Road Option
Delivering the North East Chelmsford Growth Ambition
Engagement Group 13 February 2018.
Tauranga Transport Models (TTM)
North East Transport Consultative Forum Thursday 30th May Woodhill House Aberdeen
Whittlesford Parkway Station Stakeholder Workshop
Suffolk Chamber of Commerce Transport & Infrastructure Group
GCP Transport Update Meeting for: M11 J11 Park & Ride Engagement Group
Project Directors Report to 
Histon Road LLF Resolutions and Programme
Western Orbital.
Presentation transcript:

Western Orbital: M11 J11 Park and Ride Provision Business Case Development 2018

Strategic Outline Business Case Access / Egress Concepts Content Outline Programme Strategic Outline Business Case Access / Egress Concepts Multi Criteria Assessment Next Steps - Consultation 13/02/2018 Mott MacDonald | Presentation

1. Outline Programme

Outline Programme Dates Stage March 2018 Strategic Outline Business Case complete (option short list will be identified) March – April 2018 Design development for short list options April – mid-May 2018 Detailed appraisal of short list options (modelling, economic, environmental, social impacts, costs) June – early Aug 2018 Public consultation End September 2018 Draft Outline Business Case complete (covers all short list options, indicates preferred option) End October 2018 Outline Business Case complete December 2018 Approval to progress preferred option to Full Business Case 13/02/2018 Mott MacDonald | Presentation

Business Case stages March 2018 End Sept 2018 2019 Strategic Strategic Strategic Outline Business Case (SOBC) Outline Business Case (OBC) Full Business Case (FBC) Preferred option selection Decision to commence detailed design / statutory procedures Option short list Commence more detailed appraisal Public consultation Strategic Strategic Economic Financial Commercial Management Strategic Economic Financial Commercial Management Economic Financial Commercial Management 13/02/2018 Mott MacDonald | Presentation

2. Strategic Outline Business Case (SOBC)

SOBC Scope WebTAG: The Transport Appraisal Process (DfT, 2014) 13/02/2018 Mott MacDonald | Presentation

SOBC Development Use previous work (issues well documented) Context Objectives Context Issues / need for intervention Concepts, packaging & option sifting Option Short List (for detailed appraisal / consultation) Use previous work (issues well documented) But must provide rationale for this specific P&R scheme Objectives need to be specific to area of focus Existing Policy / Strategy SEP LDPs LTP TSCSC Previous Western Orbital development work SOBC complete OBC commences 13/02/2018 Mott MacDonald | Presentation

Objectives – must be linked to identified issues To reduce general traffic levels and congestion 1.1: Congestion Hauxton Rd / Addenbrooke’s Rd / Trumpington [TrafficMaster evidence]. 1.2: Congestion M11 J11, AM peak worse [TrafficMaster evidence] To maximise the potential for journeys to be undertaken by sustainable modes of transport 2.1: Journey to work in Cambridge, high % by car from M11(S) and A10 [Census data] 2.2: Trumpington P&R insufficient for forecast employment growth at Cambridge Biomedical Campus [previous transport modelling] 2.3: P&R buses caught in congestion on Trumpington Rd – reduces advantage over car 13/02/2018 Mott MacDonald | Presentation

Objectives (draft wording) To reduce general traffic levels and congestion 1.1: Reduce traffic NE of M11 J11 (Hauxton Road and Trumpington), by encouraging trips headed for the city centre and Cambridge Biomedical Campus to transfer to another mode. 1.2: Reduce traffic flow and delay at M11 J11, particularly in the AM peak, including flows associated with non-motorway traffic (A10-A1309). To maximise the potential for journeys to be undertaken by sustainable modes of transport 2.1: Increase sustainable transport mode share for trips into the city centre and Cambridge Biomedical Campus, focused on trips originating from the south and SW (M11 and A10). 2.2: Increase Park and Ride parking capacity to serve forecast growth at the Cambridge Biomedical Campus key employment area, with delivery aligned to overall Campus development timescales. 2.3: Reduce bus journey times between Trumpington and the city centre, enabling bus / Park and Ride journeys to compete more effectively with the private car. 13/02/2018 Mott MacDonald | Presentation

Multi Criteria Assessment B D J11 E C Sifting P&R Site Location Sift Tier 1 Locations for major expansion Assess against objectives Remove locations that would not be able to address objectives Develop long list of concepts for remaining area(s) – create option packages Obj. A B C D E 1.1 Retained - compare with new site 1.2 2.1 2.2 2.3 Complementary bus priority measures required Environmental constraints under review ‘Do Nothing’ retained throughout Trumpington expansion (A) retained Sift Tier 2 Option long list Multi Criteria Assessment Short list (for more detailed appraisal & public consultation) 13/02/2018 Mott MacDonald | Presentation

Sifting At Sift Tier 2 (Multi Criteria Assessment) also need to: Assess options and identify short list for Park and Ride bus service – for example, should Trumpington Rd and Busway corridors be served from both existing and new sites? Assess Park and Ride traffic signing options where more than one site – by traffic origin, or by ultimate destination? Consider bus priority options for Trumpington Road 13/02/2018 Mott MacDonald | Presentation

3. Access / Egress Concepts

Red Bus lane General traffic route Mott MacDonald | Presentation 13/02/2018 Mott MacDonald | Presentation

Blue Bus lane General traffic route 13/02/2018 Mott MacDonald | Presentation

Purple Bus lane General traffic route 13/02/2018 Mott MacDonald | Presentation

White Bus lane General traffic route 13/02/2018 Mott MacDonald | Presentation

Yellow Bus lane General traffic route 13/02/2018 Mott MacDonald | Presentation

Black Bus lane General traffic route 13/02/2018 Mott MacDonald | Presentation

Orange Bus lane General traffic route 13/02/2018 Mott MacDonald | Presentation

4. Multi-Criteria Assessment

Multi Criteria Assessment – Proposed criteria Selection Theme 1 Reducing traffic levels & congestion (linked to first set of objectives) Traffic flows on J11 circulatory Traffic flows on A1309 Hauxton Rd arm Change in overall delay at J11 Change in delay on A10 between Harston and J11 Selection Theme 2 Maximising potential for journeys to be undertaken by sustainable modes (linked to second set of objectives) P&R bus journey time reliability Car access time to P&R from M11 northbound Car access time to P&R from A10 northbound Potential to link with wider Western Orbital proposals Potential to link with existing public transport services Mott MacDonald | Presentation 13/02/2018

Multi Criteria Assessment – Proposed criteria Selection Theme 3 Quality of life & environment (WebTAG Appraisal Summary Table) Change in number and severity of road accidents (conflict points) Noise Air quality Landscape / visual impact Historic environment Biodiversity Water environment Selection Theme 4 Scheme deliverability (financial & management sections of business case) Engineering feasibility (construction risk) Impact of construction on existing network Land acquisition requirement Complexity of statutory processes Ability to maintain and renew new infrastructure Ongoing cost implications Mott MacDonald | Presentation 13/02/2018

High level cost estimate Multi Criteria Assessment – Proposed approach Selection Theme 1 Reducing traffic levels & congestion Normalise theme score Weighting: 25% Selection Theme 2 Maximising potential for journeys to be undertaken by sustainable modes Normalise theme score Weighting: 25% Selection Theme 3 Quality of life & environment Normalise theme score Weighting: 25% Discard any option where a Large Adverse impact is expected for any criteria in this theme Selection Theme 4 Scheme deliverability Normalise theme score Weighting: 25% Total Score / Rank High level cost estimate Mott MacDonald | Presentation 13/02/2018

5. Next Steps - Consultation

Next Steps – Engagement & Consultation P&R option short listing workshop: Early March 2018 Trumpington Rd bus priority consultation: Late March 2018 Public consultation on short list options: June – Early August 2018 Stakeholder discussion sessions: July – Oct 2018 (if required) 14/09/2019 Mott MacDonald | Presentation