EA Deliverable Equipment for East Area Renovation

Slides:



Advertisements
Similar presentations
Helium Bag Readiness. Scattering chamber Clamshell flange (not here yet) Coffee can collimator Polyurethane Balloon (sides only) 10 m Mylar Balloon.
Advertisements

Equipment Coding in the Project Domain (practical case study)
HiRadMat : report from WG2&3 – WANF dismantling January 15, 2010S. Evrard 1 Worksite: activities achieved or in progress WANF cleaning: status Proposal.
IBL Brazing Study April the 20 th 2012 Eric Vigeolas.
LINAC3 INSTRUMENTATION STATUS F.Roncarolo – 18 Feb 2015 F.Roncarolo 18 Feb
LINAC LASER NOTCHER READINESS REVIEW August 5 th, 2014 Kevin Duel – Mechanical Support Engineer.
Vacuum system.
Linac-4 current situation and outlook U. Raich, F. Roncarolo, F. Zocca.
1 Status of Neutrino Beamline Construction K. Nishikawa IPNS, KEK 2006 . 12 . 4.
Compressor status AWAKE Technical Board meeting 19 August 2015.
HiRadMat Collimator Jaws HRMT23 03/07/2014EN/MME - E. Berthomé1.
The Stripping Foil Test Stand in the Linac4 Transfer Line
ELENA Project GBAR Experimental area L ayout / time scales / questions F. Butin / ELENA collaboration.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
1 Sector Test – Preparation Layout in LSS7 Jan Uythoven (AB/BT) Thanks to Mike Lamont and the other ‘sector testers’
Interconnections Cryogenic Extensions and DSL Ivo Slits - AT/MCS
Horst Breuker Review Oct ELENA Safety and Radio Protection ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive, Demonstrative (Risk.
Horst Breuker ADUC Jan Safety and Radio Protection, Consequences for the Experiments ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive,
Technical Readiness Review of the n-3He Experiment Seppo Penttila ORNL P-div At SNS Jan
Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 11 December 2012 LAV construction & installation status.
L4 BCC – 1 Sep 2011 F. Roncarolo, U. Raich L.Soby, J.Tan, C.Zamantzas, F. Lenardon, C.Vuitton, G-J.Focker.
Tracker cooling plant refurbishment Project status Revised plan Financial impact.
Clive Field, Reggie Rogers, Venkat Srinivasan Undulator Week: BFW Card Status Update 01/23/ BFW Card - Physics Requirements.
Clive Field, Venkat Srinivasan Undulator Week: BFW Card Status Update 04/30/ BFW Card Status on behalf of: Keith Caban.
PANDA Target Pipe Meeting Alfons Khoukaz Institut für Kernphysik, WWU Münster, Germany PANDA Target Pipe Meeting February 2013.
PS Complex Controls Renovation S Baird AB/ABP ATC/ABOC Days: Session Jan 2008.
Wim Weterings Remy Noulibos
Hardware Commissioning Review BDI Equipment
East Area Renovation Project Team meeting # 2 – EDMS News
L. Gentini, A. Bertarelli, F. Carra
UPPSALA UNIVERSITY GERSEMI
Internal Orbital Welding
EHN 1 CO2 Leaks inside the beam lines
Awake Electrons Gun Introduction. - How works an electrons gun
new straw end plug: D=10.6 mm straws support frame Levan option
EA Renovation –EATM– Project status
Wire Scanner / A.Demougeot
Naming convention and layout database for the East Area
LEP cryostat Procurement strategy and plans
Cryostat procurement, status and plan, QA/QC
News about the WA104 Programme
INSTALLATION SEQUENCE
LIU–PLI report LIU PSB meeting.
East Area Renovation Project team #6 Launch safety agreement
Status of the BI Work Package in the LIU-PSB frame
6th srf collaboration lasa 13 June CAVITY interfaces - Vincent Hennion / PIERRE BOSLAND Bonjour, Franck Peauger, Je suis Ingénieur RF.
Diffuser status October 2017
WPs concerned by L4 connection:
East Hall under construction
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
GIS Portal Racks Project
Cpasbien 2017 & 2018 Films & Video Series Telecharger film.
SNS PPU Cryomodule Instrumentation
Cryomodule Assembly Plan
Experimental Areas – LS2 planning
Extraction Michael Bevins May 17, 2007
Teleconference ACS – FREIA 19th June 2017
Michail Anastasopoulos Lead Detector – Design Engineer
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
Global Overview EA Deliverables for East Area Renovation
ATS Consolidation Day 22nd May 2019 Beam Instrumentation
East Hall under construction
EA Magnets Supports for East Area Renovation
East Hall under construction
East Hall under construction
East Hall under construction
Open Points and More… Giulia / Michael / Sebastien / Maria.
EA Renovation Project – Project Team 29 – 28 June 2019 NEWS
EN-EA Magnets Supports Overview (for East Area Renovation)
EA Equipment for East Area Renovation
Presentation transcript:

EA Deliverable Equipment for East Area Renovation Giulia/Aboubakr

Cerenkov Counters - XCET 2 on T09 2 on T10 3D design on going Meeting done 30-04-19 to check the current situation  document on overview XCET to be circulated soon EAST AREA: 4 XCET to be produced 4 bodies with supports already available Windows to be defined Procurement of mirrows? (recover the existing ones?) Control Panel to be done (3D model to be finished) Complete assembly with body chambers and windows to be assembled and welded by certified welder Pressure test from HSE to be done RESPONSIBLES? Design: Production: Assembly: 7 May 2019 EA Equipment Review

Collimators and XTCX TCX: 3D design ready, drawings to be done Bard?? Fixed collimator 1 on T09 3D design done, 2D drawings on going (Bard) HTCAA Support XTCX 1 XCSV Collimator 2 blocs Vertical 2 on T10 1 on T11 On stock XCHV Collimator 4 blocks 3 on T09 1 on T10 ? UNI Supports Collimators 7 To be checked in stock TCX: 3D design ready, drawings to be done Bard?? Production with external company Collimator 2 blocks: on stock Collimator 4 blocks: on stock? renovation complete to be done (change motor, screws, bearing…..) RESPONSIBLES? Design: Production: Assembly: 7 May 2019 EA Equipment Review

XCON and XSCI XCON Absorber/converter 2 on T09 1 on T10 3D model and technical spec to be done XSCI Scintillator 2 on T09 (XSCI) 1 on T10 (XSCI) 1 on T11 (XSCI) from BI HLGAC Support absorber/converter (MAUVE) 7 4 recovered from T09 and T10 3 on stock XCON: 3D design to be done following interaction with physicists to decide a proper material and thickness Technical specification to be done Control SMM Quantité de XSCI à installer sur chaque lignes ? T9 : 2, T10 : 1 ou 2 ? T11 : 1 RESPONSIBLES? Design: Production: Assembly: 7 May 2019 EA Equipment Review

Wire and Ionization Chambers XWCM Multi wire proportional chamber 1 on T08 installed HXWCM Support XWCM XION Ionization Chamber Installed HXION Support XION Already installed, no modifications Name to be inserted in the naming portal and then registerd on layout database Gas supply for XWCM on T08 to be redone Second XION to be installed in T08? 7 May 2019 EA Equipment Review

Beam Profile Monitors - XBPF BXBPF Beam profile monitor for experimental areas (VESSEL) 2 on T09 1 on T10 1 on T11 3D design on going UNI Support BXBPF 4 To be checked in stock? 3D model ready 2D drawigns ready Production 4 vessels to be done with external company Assembly chez nous 2 windows + 2 flanges for device to be procured? (EA-VIDE) Inteface with adjusting base to be produced (angle regulation) RESPONSIBLES? Design: Vincent Production: Assembly: 7 May 2019 EA Equipment Review

Supports Recoverd as they are (stocked @ CHARM), ready to be installed ? Support BTV 5 Recovered ready for installation HBCTB Support beam current transformer BCTF 1 on F61 HBLSD Support Spill mesurement LSD HXSEC Support XSEC 1 on F62 1 on F63 2 on T08 Recoverd as they are (stocked @ CHARM), ready to be installed Name to be inserted in the naming portal and then registerd on layout database (BTV names to be checked) BCT recovered from linac 2 (BI resposible) On F62 BTV support name PSZBTVMC0028 LSD vacuum chamber to be cheked! 7 May 2019 EA Equipment Review

Open Points 7 May 2019 EA Equipment Review   From: Erwan Harrouch <erwan.harrouch@cern.ch> Sent: mardi 30 avril 2019 10:49 To: Sebastien Evrard <Sebastien.Evrard@cern.ch>; Johannes Bernhard <johannes.bernhard@cern.ch>; Michael Lazzaroni <Michael.Lazzaroni@cern.ch> Cc: Giulia Romagnoli <giulia.romagnoli@cern.ch> Subject: FW: Resources for urgent actions: BLMs Bonjour à tous, Lors de la revue du TDR avec Jocelyn, deux points en suspens ont été levé : Quantité de BLM à installer : Est-ce que les télescopes sur la cibles seront effectivement remplacés par des BLMs ? Est-ce que les BLMs sur les lignes primaires seront installés ?(Cf. mail ci-dessous) Quantité de XSCI à installer sur chaque lignes ? T9 : 2, T10 : 1 ou 2 ? T11 : 1 Merci Erwan 7 May 2019 EA Equipment Review

Thank you!