12 Steps to a Cooler Design

Slides:



Advertisements
Similar presentations
The JLab IR/UV FEL Driver D. Douglas for the JLab FEL anarcho-syndicalist commune.
Advertisements

Tom Powers Practical Aspects of SRF Cavity Testing and Operations SRF Workshop 2011 Tutorial Session.
Page 1 Collider Review Retreat February 24, 2010 Mike Spata February 24, 2010 Collider Review Retreat International Linear Collider.
Linear Collider Bunch Compressors Andy Wolski Lawrence Berkeley National Laboratory USPAS Santa Barbara, June 2003.
Chris Tennant Jefferson Laboratory March 15, 2013 “Workshop to Explore Physics Opportunities with Intense, Polarized Electron Beams up to 300 MeV”
Ion Accelerator Complex for MEIC January 28, 2010.
ERHIC Main Linac Design E. Pozdeyev + eRHIC team BNL.
Aperture Considerations in the FEL Upgrade Accepted design process –generate design  known –set aperture = N  + W N typically 4 to 6 W is “beam handling.
Thomas Roser RHIC Open Planning Meeting December 3-4, 2003 RHIC II machine plans Electron cooling at RHIC Luminosity upgrade parameters.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Generation and Characterization of Magnetized Bunched Electron Beam from DC Photogun for MEIC Cooler Laboratory Directed Research and Development (LDRD)
Toward a Test Facility for an ERL Circulator Ring Based e-Cooler MEIC Electron Cooler Test Facility Planning Retreat January 31, 2012.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
R&D, Collaborations and Closeout Fulvia Pilat MEIC Collaboration Meeting March
MEIC Staged Cooling Scheme and Simulation Studies He Zhang MEIC Collaboration Meeting, 10/06/2015.
Alexei Fedotov, 02/02/12 1 Potentials for luminosity improvement for low-energy RHIC (with electron cooling) February 2, 2012.
Design Requirements/Issues Source/Injector Performance -successful run of 135 pC -DC photocathode gun: cathode lifetime >600 C; GaAs wafer > 2 kC Delivery.
Overview of ERL MEIC Cooler Design Studies S.V. Benson, Y. Derbenev, D.R. Douglas, F. Hannon, F. Marhauser, R. A Rimmer, C.D. Tennant, H. Zhang, H. Wang,
ERHIC design status V.Ptitsyn for the eRHIC design team.
9/24-26/07 e- KOM Slide 1/20 ILC Polarized e- source RDR Overview A. Brachmann.
Accelerator Science and Technology Centre Extended ALICE Injector J.W. McKenzie, B.D. Muratori, Y.M. Saveliev STFC Daresbury Laboratory,
“The WBS 3 Talk” Scope of work: beam physics support for –injector –IR Demo analysis for upgrade guidance –upgrade design and analysis (specification &
Y. R. Roblin, D. Douglas, A. Hofler, C. Tennant, G. Krafft EXPERIMENTAL STUDIES OF OPTICS SCHEMES AT CEBAF FOR SUPPRESSION OF COHERENT SYNCHROTRON RADIATION.
Y. Roblin, D. Douglas, F. Hannon, A. Hofler, G. Krafft, C. Tennant EXPERIMENTAL STUDIES OF OPTICS SCHEMES AT CEBAF FOR SUPPRESSION OF COHERENT SYNCHROTRON.
Workshop on Accelerator R&D for USR Closeout Remarks for Accelerator Physics Session.
Proton Source & Site Layout Keith Gollwitzer Accelerator Division Fermi National Accelerator Laboratory Muon Accelerator Program Review Fermilab, August.
R.Chehab/ R&D on positron sources for ILC/ Beijing, GENERATION AND TRANSPORT OF A POSITRON BEAM CREATED BY PHOTONS FROM COMPTON PROCESS R.CHEHAB.
Electron Sources for ERLs – Requirements and First Ideas Andrew Burrill FLS 2012 “The workshop is intended to discuss technologies appropriate for a next.
Preliminary MEIC Ion Beam Formation Scheme Jiquan Guo for the MEIC design study team Oct. 5,
P I T Z Photo Injector Test Facility Zeuthen Design consideration of the RF deflector to optimize the photo injector at PITZ S.Korepanov.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Harmonic.
Injector Options for CLIC Drive Beam Linac Avni Aksoy Ankara University.
MeRHIC Internal Cost Review October, Dmitry Kayran for injector group MeRHIC Internal Cost Review October 7-8, 2009 MeRHIC: Injection System Gun.
Development of High Current Bunched Magnetized Electron DC Photogun MEIC Collaboration Meeting Fall 2015 October 5 – 7, 2015 Riad Suleiman and Matt Poelker.
Adiabatic buncher and (  ) Rotator Exploration & Optimization David Neuffer(FNAL), Alexey Poklonskiy (FNAL, MSU, SPSU)
MCS meeting 20/11/2015 S. Guiducci. Introduction Yesterday meeting has shown an interest in a large physics community to incremental development of muon.
Progress Report on the Ultra-fast Harmonic Kicker Cavity Design and Beam Dynamic Simulation Yulu Huang 1,2 H. Wang 1, R. A. Rimmer 1, S. Wang 1 1.Thomas.
Preservation of Magnetized Beam Quality in a Non-Isochronous Bend
Frank Stulle, ILC LET Beam Dynamics Meeting CLIC Main Beam RTML - Overview - Comparison to ILC RTML - Status / Outlook.
+-- Collider Front end- Balbekov version
Multi-bunch Operation for LCLS, LCLS_II, LCLS_2025
Preliminary result of FCC positron source simulation Pavel MARTYSHKIN
Progress in the Multi-Ion Injector Linac Design
R&D Topics for FOA Funding Proposals
Space Charge Effect Simulation Using DA Based FMM and Electron Cooling Simulation for JLab’s MEIC Project.
Center for Injectors and Sources
ERL EIC Workshop | Jefferson Laboratory | November 2, 2018
Why CeC is needed? High luminosity of US future electron-ion collider(EIC) is critical for success of its physics program 2018 NAS Assessment of U.S.-Based.
Summary of Beam Cooling Parallel Session
JLEIC electron injection demo
JLEIC electron injection demo
Injection design of CEPC
Injector for the Electron Cooler
JLEIC ion fullsize booster (2256m) space charge limit (Δν=0
Update on ERL Cooler Design Studies
JLEIC 200 GeV Ion Injector Chain and Bunch Formation
MEIC New Baseline: Luminosity Performance and Upgrade Path
Multi-Ion Injector Linac Design – Progress Summary
Fast kicker beam dynamics simulations
JLEIC Main Parameters with Strong Electron Cooling
JLEIC CCR Path Length and Gap Formation
MEIC New Baseline: Part 7
Comments to the Report of the Community Review of EIC Accelerator R&D for the Office of Nuclear Physics, February 13, 2017 (60 pages) By Haipeng Wang,
Ya. Derbenev JLEIC R&D meeting CASA Jefferson Laboratory
Cooler Ring Design Status - July 2017
HE-JLEIC: Do We Have a Baseline?
Some Thoughts on the JLEIC Ion Injector
He Zhang, David Douglas, Yuhong Zhang MEIC R&D Meeting, 09/04/2014
Optimization of JLEIC Integrated Luminosity Without On-Energy Cooling*
JLEIC Ion Beam Formation options for 200 GeV
Presentation transcript:

12 Steps to a Cooler Design D. Douglas

Concept Apply the same system engineering process that was used to design/build the IR Demo, IR Upgrade, UV Demo, reconfigure CEBAF for CEBAF-ER and the IR Upgrade for the DarkLight aperture test Balance risk & technical maturity of available methods to provide a cost-effective & robust system no magic, no miracles: rely on demonstrated solutions/technology when methods don’t exist, identify challenge & provide R&D plan, risk assessment, and workaround Deliverable: feasibility assessment and actionable cooler design report in < 2 years “actionable” => informs down-select List of components, locations, tolerances, sensitivities, cost ± 10%

https://userweb.jlab.org/~douglas/FEL/guide/design_process.html

“12 Step Program” A framework for making design choices… Basic system engineering: establish requirements, break design down into smaller bits. Implement configuration control from outset! Cooling requirements drive design Define source performance Constrain accelerator architecture Accelerator architecture analysis Reveals challenges (“miracles”) Provides opportunity for cost/performance optimization Reuse existing methods, technology, designs? Can organize activities as a sequence of trade studies & design tasks “trade study” = performance/risk/cost assessment of available solutions + down-select to optimum path forward

12 Step Breakdown for Cooler Design establish cooling system requirements energy, current, charge/bunch emittance, phase space configuration ("match") - transverse and longitudinal cooling rates for magnetized vs. non-magnetized beam architecture trades & cost/performance optimization linac vs. ERL vs. linac + CCR vs. ERL + CCR (cost optimum) choice of RF fundamental informed by required bunch length, need to get beam into/out of CCR source trades thermionic, photocathode, magic... X RF, DC magnetized/nonmagnetized

beam transfer system trades and design injector design merger design linac design Note: initial results from 2011-12 design iterate indicated can't get required brightness through linac, at least at 750 MHz x 1 cm rms bunch length; don't know what happens - at least longitudinally - when going to longer bunch and/or lower frequency, though notionally transverse "should get better" beam transfer system trades and design bunch to bunch, bunch train, full ring (RF loading probably precludes this)? pulsed kicker vs. RF separator based?

develop CCR design - with space charge, CSR, microbunching simulation of spent beam after cooling recovery transport design, if ERL is used S2E with cooling simulation sensitivity studies, tolerance specifications Provides basis for cost analysis & engineering design Informs project down-selection process