Path Length Chicane Options

Slides:



Advertisements
Similar presentations
Eric Prebys, FNAL.  So far, we’ve talked about nice, periodic lattice, but that may not be all that useful in the real world. In particular, we generally.
Advertisements

Study of the Luminosity of LHeC, a Lepton Proton Collider in the LHC Tunnel CERN June F. Willeke, DESY.
Luminosity Prospects of LHeC, a Lepton Proton Collider in the LHC Tunnel DESY Colloquium May F. Willeke, DESY.
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility EIC Collaboration Meeting, Hampton University, May 19-23,
REQUIREMENTS FOR FCC DILUTION KICKERS AND BEAM DUMP LINE GEOMETRY F. Burkart, W. Bartmann, M. Fraser, B. Goddard, T. Kramer FCC dump meeting 18 th June.
Synchronization Andrew Hutton Slava Derbenev Yuhong Zhang.
Eric Prebys, FNAL.  In our previous discussion, we implicitly assumed that the distribution of particles in phase space followed the ellipse defined.
Arc to Straight Matching In both eRHIC FFAG rings January 13, 2014Stephen Brooks, eRHIC FFAG meeting1.
Flat-beam IR optics José L. Abelleira, PhD candidate EPFL, CERN BE-ABP Supervised by F. Zimmermann, CERN Beams dep. Thanks to: O.Domínguez. S Russenchuck,
EIC Users Meeting, SBU, 6/27/14 Polarized Electron Beams in the MEIC at JLab Fanglei Lin for MEIC Study Group EIC Users Meeting, Stony Brook University,
Synchronization Issues in MEIC Andrew Hutton, Slava Derbenev and Yuhong Zhang MEIC Ion Complex Design Mini-Workshop Jan. 27 & 28, 2011.
MEIC Detector and IR Integration Vasiliy Morozov, Charles Hyde, Pawel Nadel-Turonski MEIC Detector and IR Design Mini-Workshop, October 31, 2011.
Status of MEIC Beam Synchronization V.S. Morozov on behalf of MEIC study group (summary of the results of a series of special MEIC R&D meetings) MEIC Collaboration.
Interaction Region Design and Detector Integration V.S. Morozov for EIC Study Group at JLAB 2 nd Mini-Workshop on MEIC Interaction Region Design JLab,
Hybrid Synchrotron Arc: 2 Dipoles per Half Cell J. Scott Berg Advanced Accelerator Group Meeting 28 July 2011.
Present MEIC IR Design Status Vasiliy Morozov, Yaroslav Derbenev MEIC Detector and IR Design Mini-Workshop, October 31, 2011.
Layout and Arcs lattice design A. Chancé, B. Dalena, J. Payet, CEA R. Alemany, B. Holzer, D. Schulte CERN.
Large Booster and Collider Ring
Non-linear Beam Dynamics Studies for JLEIC Electron Collider Ring
First Look at Nonlinear Dynamics in the Electron Collider Ring
AD & I : BDS Lattice Design Changes
Electron collider ring Chromaticity Compensation and dynamic aperture
Progress of SPPC lattice design
PS2 Injection/Extraction Layout
Collider Ring Optics & Related Issues
Negative Momentum Compaction lattice options for PS2
Update of lattice design for CEPC main ring
Towards an NMC Ring: Dispersion suppressor & long straight section
Update on Alternative Design of jleic ion injector Complex B
Negative Momentum Compaction lattice options for PS2
Towards an NMC Ring: Dispersion suppressor & long straight section
MEIC Shifting Magnet Tim Michalski August 6, 2015.
Vertical Dogleg Options for the Ion Collider Ring
Electron Ring IP Region Optics
JLEIC Collider Rings’ Geometry Options
Progress on Non-linear Beam Dynamic Study
Feasibility of Reusing PEP-II Hardware for MEIC Electron Ring
Fanglei Lin, Andrew Hutton, Vasiliy S. Morozov, Yuhong Zhang
Update on MEIC Nonlinear Dynamics Work
Feasibility of Recuperation of Magnets in Decommissioned Storage Rings
Transfer Line for EIC.
Update on MEIC Ion Polarization Work
Main Design Parameters RHIC Magnets for MEIC Ion Collider Ring
Rough designs for The LEB and HEB for pCDR-100
Yu.N. Filatov, A.M. Kondratenko, M.A. Kondratenko
Ion Collider Ring Using Superferric Magnets
Fanglei Lin, Yuhong Zhang JLEIC R&D Meeting, March 10, 2016
Alternative Ion Injector Design
Fanglei Lin, Yuri Nosochkov Vasiliy Morozov, Yuhong Zhang, Guohui Wei
Conventional Synchronization Schemes
Fanglei Lin MEIC R&D Meeting, JLab, July 16, 2015
JLEIC Collider Rings’ Geometry Options (II)
Progress Update on the Electron Polarization Study in the JLEIC
First results of proton spin tracking in a figure-8 ring
Possibility of MEIC Arc Cell Using PEP-II Dipole
More on MEIC Beam Synchronization
JLEIC Electron Ring Nonlinear Dynamics Work Plan
Arc FODO Cell Inventory
Fanglei Lin JLEIC R&D Meeting, August 4, 2016
MEIC R&D Meeting, JLab, August 20, 2014
MEIC Alternative Design Part III
New Chicane Option Total bending angle and start and end points fixed
MEIC beam path change with e-ring bypass lines
Summary and Plan for Electron Polarization Study in the JLEIC
Ion Path Length Compensation with Chicane
Update on the High Energy Booster Design
A TME-like Lattice for DA Studies
Booster to Ion Ring Transfer Line
Option 1: Reduced FF Quad Apertures
Illustrations of Beam Synchronization Issue
Presentation transcript:

Path Length Chicane Options V. Morozov, A. Hutton, P. Nadel-Turonski, M. Sullivan MEIC R&D Meeting, JLab, June 5, 2014 F. Lin

Outline Path length chicanes in arcs Path length chicane in straight 2

Concept of “Arc” Chicane Reserve space for two extra dipoles in each arc, otherwise regular arc lattice 3 m long dipoles separated by 1.68 m distances with 0.5 m long quadrupoles in between Arc bending angle is fixed (i.e. incoming and outgoing angles are fixed) and cord length is fixed (i.e. the coordinates of the arc ends are fixed) Two extremes of a 10 dipole arc Longest orbit: two dipoles at arc ends are off Shortest orbit: two dipoles in the middle of the arc are off Intermediate cases: the end and middle dipoles are partly powered 3

Geometry & Optics of “Arc” Chicane Long configuration 59 cm between dipoles and quads, example optics matched to regular FODO Short configuration 57.9 cm between dipoles and quads, example optics matched to regular FODO Path length difference of 200.9 mm Need two chicanes, one per arc, helps with simultaneous synchronization of two IPs Maximum total transverse movement of “only” 97 cm May fit in the regular tunnel 4

Full “Straight” Chicane Assume each dipole is 3 m long and bends by 50 mrad and require 40 cm path length increase 4 dipoles 8 dipoles 12 dipoles 16 dipoles 5

Half of “Straight” Chicane Consider solving half the problem, 20 cm path length increase 4 dipoles 8 dipoles 12 dipoles 6

Conclusions Arc chicane Straight chicane 44.7 m long but most of it is occupied by existing arc bending dipoles Each chicane provides 20 cm path length increase, need one in each arc but helps with simultaneous synchronization at two IPs Spacing between dipoles and quadrupoles changes from 57.9 to 59 cm Maximum total transverse movement of 97 cm, may fit in regular tunnel Requires movement of 8 dipoles and 9 quadrupoles per chicane Requires two extra dipoles and two extra quadrupoles per arc, total extra length < 20 m Straight chicane 66 m long, perhaps with some usable space but takes up straight space Maximum total transverse movement of 3.25 m Single 40 cm chicane is more economical in terms of space Considered making bending regions achromatic but requires strong quadrupoles and/or significant additional space Did not seem worth pursuing much further because because of the arc chicane option A chicane may not be an elegant solution but it does solve a lot of problems No orbit shifts in either collider ring No change of SRF frequency in either ring No CEBAF synchronization problem Conceptually simple, no additional R&D  easier to convince reviewers that it will work? Easier to cost? 7