31/3/2010 Difficult day… but at the end stable beams.

Slides:



Advertisements
Similar presentations
PROFIBUS controller problem (SEU) on cryo valve on DFBMH (600 A circuit RQ6.L7B1/2). Loss of cryo maintain ==> Beam dump. End of fill #1975 after ~2.5.
Advertisements

● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
ION COMMISSIONING REVISITED 1 Thanks to: John Jowett, Walter Venturini. Matteo Solfaroli.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
Saturday ● 06:00: Physics fill from the night shift ● 15:00: End stable beam mode: – problems with incorporation of settings for the squeeze ● 16:40:
07:30 – 10:30 Asynchronous dump test with Beam 2. No issue found. FIDEL update. Now chromaticity decay corrected. 12:13 Beam dump due to problem in the.
Wednesday
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Saturday 24 March 2012.
Friday 18/03 07:15 Test ramp with pilot after the test of dynamic FIDEL correction. Ramp was OK, but fill was stopped due to the trip of several RQTFs.
Luminosity lifetime – fill 2932
Monday :00 Stable beams 9_6_6_6 13:40 Access.
Friday 30th September 06:00 Operator dump fill #2171, int. lumi about 75 pb-1 Previous operator dump from physics was on 14 September ! 07:00 Start of.
LHC summary week 32 Coordination: Mike Lamont & Jan Uythoven
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
LHC Morning Meeting - G. Arduini
Monday 6th August & night
Summary of Week 11: 14 – 21 March
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Summary of Week 16 G. Arduini, J. Wenninger
LHC Morning Meeting - G. Arduini
Wednesday 8th August & night
Tuesday 20 March 2012.
Week 35 – Technical Stop and Restart
Chromaticity can make a difference…
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Planning at 5 o’clock meeting Friday
Thursday :00: Physics fill from the night shift
Monday 08:30 – 11:00 Access for: LBDS beam 2 problems: TSU unit changed RQTD.A67B1: controller for the current lead heater changed RQS.A67B1 power converter.
Friday Morning 7:30 injection for fill 2908
Sunday
Friday 16/3 08:30 – 10:15 Access for QPS and EPC (BI in point 4)
BI cont. *** Summary Matching Monitor test *** We only had ~15minutes of inject and dump, but managed to see a profile with ~9e9 p (!)
Wednesday 9:08 Fill 3214 dumped by OP after 5:26 hours in stable beams
Saturday 7th May Sat – Sun night
LHC Morning Meeting - G. Arduini
Friday 23rd March 08:00 Access
(on behalf of the LHC team)
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Thu 6/4 End of fill #2470. ~1 pb-1 in 4 hours. Dumped by CMS BCM.
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
Monday 6th 07:39 Dump fill #1854, RQ6.L2 tripped, followed by access
Saturday Wire scans at end of fill 1253 B1H : 4.2 B1V : 4.3 B2H : 5 B2V : 7.2 Beams dumped (after ~14h of collisions) Some issues during refill.
Thursday 17/3 Morning: evaluation of the origin of the timing problem occurred over night and the implication on machine protection 09:00 – 12:00 Dry ramp.
07/08/2010 Fill #1264 dump at 02:14:38.
Monday :00 – 15:00 : Stable beams 15:30 : Recover…
Summary for LPC (March 7th, Ralph Assmann)
Saturday :42 stable beams fill 3541
Monday :15 fill 3523 dumped by BPMs IP6
LHC Morning Meeting - G. Arduini
Thursday 22nd March 00:20 – 02:40 on longer squeeze function, orbit and chroma correction at 4 TeV 2:40 – 5:30 second cycle with long squeeze 5:46 – 7:00.
LHC status - Week 35 G. Arduini, M. Lamont Main aims:
Wednesday 23/2 Thanks CRYO!!!.
Thursday 30th September De-bunching test
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Friday 15th February - morning
RAMP FOR COLLIMATOR SETUP
Another Immortal Fill….
15/12/2009 Vacuum interlock in sector 78 understood  out-gassing of a Penning gauge ignited as a result of ionization or dust arcing In conclusion: NO.
Saturday 26 November 2011.
Tuesday
Wednesday :35 : Beam lost because of trip of RCBXH3.L1
Monday 5 July Morning: Continued with the Physics fill, 7b x 7b, 1e11/bunch Stable beams from 2:30 am to 13:30 : 11 hours.
Presentation transcript:

31/3/2010 Difficult day… but at the end stable beams

31/3/2010 The problems encountered overnight and the first ramp seem to be related to incorrect settings for the tune feedback (peak finder window) Noticed possible correlation between reduction of the lifetime and increase of RF voltage from 8 to 12 MV before starting the ramp  to be confirmed For the time being we skip the increase in voltage before starting the ramp and we keep the voltage flat to 8 MV

31/3/2010 One successful ramp at the beginning of the afternoon lost at flat-top during chromaticity measurement: the tune feedback switched ON after being switched OFF and corrected the fast tune change induced by the energy trim during the chromaticity scan  QPS tripped some RQT circuits

31/3/2010 Actions ongoing to fix the problems with the tune feedback: Send corrections at a higher rate to the FGC. Ready for testing in a new version of the feedback controller, which will interpolate these changes and send them at 100ms intervals to the FGC. A limitation on the allowed dV/dt (d2I/dt2) to be implemented at the FGC level  new FGC version ready to be tested Raise the QPS detection thresholds to be investigated

31/3/2010 After that preparation for an additional ramp: some problems with the positioning of the collimator  operational procedure not correctly followed Trims from the feedback during the previous ramp incorporated (coarse) in the ramp to reduce the correction introduced by the feedback now limited to ~0.015  to be continued

31/3/2010 Coupling correction at flat-top Chromaticity before correction: B1: H:9.0, V:9.2 B2: H:8.9, V:10.3 Chroma after corrections: B1: H:5.4, V:3.6 B2: H:4.1, V:4.9

31/3/2010 We still see losses when we close the collimators. Blow-up still observed after injection and during the ramp mainly in the vertical plane beam 2. To be studied further.

31/3/2010 BSRT for the moment can only give qualitative indications – see wire scanners

31/3/2010 Trim to separation bump IP1: HB1:0.045 mm, VB1:-0.062 mm / VB2=0.062 mm Trim to separation bump IP2: HB1:0.012 mm, VB1:-0.215 mm / HB2= -0.05 mm, VB2=0.235 mm Trim to separation bump IP5: HB1:0.025 mm, VB1:-0.01 mm / HB2:-0.025 mm Trim to separation bump IP8: HB1:0.03 mm, VB1:+0.175 mm / VB2: -0.175 mm

31/3/2010 Separation ON Collision

01/04/2010 Monitoring for most of the night. Some interesting features observed:

01/04/2010 Very good lifetime but still beam 2 is suffering more Nice coast: terminated by RQF.A12 trip: reason for the moment unkonwn

01/04/2010 Program of the day: Friday: 09:00 Injection and capture voltage optimization to minimize blow-up 11:00 Ramp and squeeze test (down to 7 m and possibly to 5 m) with optics measurements Evening: pre-cycle and fill for physics Friday: 07:00 Programmed dump (hopefully) 09:30: Tune feedback and chromaticity measurement during the ramp 14:00: Investigation on lifetime at low energy (Non-linear chromaticity measurement, hump investigations: tune scan and dependence on RF parameters)

31/3/2010 Saturday to Monday: Beginning/End of fill study list in work 2 fills/day with an end of fill or beginning of fill study (2-3 hours) Beginning/End of fill study list in work Working point in collision Machine protection tests Non-linear chromaticity measurement at flat-top b3 correction checks