WHALE TAIL PIT Expansion Project

Slides:



Advertisements
Similar presentations
Meadowbank Gold Project Cumberland Resources Ltd. Nunavut Impact Review Board Public Hearing Chesterfield Inlet, Nunavut March 30, 2006.
Advertisements

Environment Canada Presentation to Nunavut Impact Review Board Regarding Baffinland Mary River Project NIRB Prehearing Conference Pond Inlet and Igloolik,
Approach for Including Nutrient Limitations within NDPDES Permits Dallas Grossman Division of Water Quality
Environment Canada’s Presentation to the Nunavut Impact Review Board (NIRB) Regarding AREVA Resources Canada Inc.’s Kiggavik Uranium Mine Project NIRB.
TITLE OF PROJECT PROPOSAL NUMBER Principal Investigator PI’s Organization ESTCP Selection Meeting DATE.
HATCH ACRES MEADOWBANK GOLD PROJECT REVIEW OF CUMBERLAND’S FINAL ENVIRONMENTAL IMPACT STATEMENT (FEIS) Submission to Nunavut Impact Review Board (NIRB)
Kiggavik Uranium Mine Project Presentation to the Nunavut Impact Review Board Final Hearing Baker Lake, NU March 2-14,
Climate Change: An Aquatic Perspective and State Management Needs Gary Whelan MI DNR Fisheries Division September 2008.
Kiggavik Project Final Hearing Presentation
Freshwater Aquatic Organisms and Habitat ( ) Rick Palmer Senior Fisheries Biologist Sharleen Hamm Aquatic Ecologist.
1 NRCan’s Final Hearing Presentation: Kiggavik Uranium Mine Project : Prepared for the Nunavut Impact Review Board Presented by: John Clarke Director,
Review of the Nipissar Lake Replenishment Project, Rankin Inlet, Nunavut September 25, 2014 NWB Hearing Presentation Type A Water License Amendment Application.
THE DORIS NORTH WATER LICENSE APPLICATION, PUBLIC HEARING Department of Environment, Government of Nunavut August 2007.
Nunavut Impact Review Board Presentation of Technical Submission AREVA Resources Canada Inc. Kiggavik Uranium Mine Project March 2015 Transport Canada.
Florida Fish and Wildlife Conservation Commission Invertebrate Communities as Tools for Establishing Minimum Flows and Levels in Florida Streams.
NRCan Final Hearing Presentation Meliadine Gold Project Kate Cavallaro Senior Environmental Assessment Officer Environmental Assessment Division External.
Environment Canada’s Intervention on the Mary River Project Water Licence Application Nunavut Water Board Final Hearing Pond Inlet, NU Mark Dahl / Anne.
- Aquatics - Presented by: Rick Pattenden Mainstream Aquatics Ltd.
Proposed Amendment to Project Certificate (Condition 32) Meadowbank Private Access Road INAC's Comments to NIRB Baker Lake, Nunavut [ April 28-30, 2009.
Qikiqtani Inuit Association Nunavut Water Board Technical Meeting and Pre-Hearing Conference January 16 th and 17 th, 2013.
Climate Limnos / Ocean Biota Global –> Regional Climate Models (e.g. CGCM -> Great Lakes down-scaled projections) Air Temperature, Humidity, Precipitation,
Oregon Department of Transportation Stormwater Management Initiative: Meeting New Challenges Presented by: William Fletcher, ODOT February 5, 2008.
Nunavut Impact Review Board Final Hearing Agnico Eagle Mines Limited – Meliadine Gold Project August 21 – 27, 2014 Rankin Inlet, Nunavut Transport Canada.
Intervention – 2004 Nanisivik Reclamation and Closure Plan Arctic Bay June 3-4, 2004 Nunavut Water Board Public Hearing.
An Introduction To Modeling of Surface Waters For TPDES Permits Mark A. Rudolph, P.E. TCEQ Water Quality Division.
NYS Department of Environmental Conservation Flow Standard Amendment to New York’s Water Quality Standards Regulations Scott J. Stoner Chief, Standards.
NRCan Community Roundtable Presentation Meliadine Gold Project Rob Johnstone Deputy Director Sustainable Mining and Materials Policy Division Minerals,
P.O. Box 18 Cambridge Bay, Nunavut X0B 0C0 Telephone: Fax: Kitikmeot Inuit Association Summary of Technical Issues.
Doris North Gold Mine Project Presentation to the Nunavut Water Board Technical Meeting Cambridge Bay, NU January 28-29,
Doris North Gold Mine Project Presentation to the Nunavut Impact Review Board Public Hearing Cambridge Bay, NU April 12-14,
Back River Mine Project Presentation to the Nunavut Impact Review Board Final Hearing Cambridge Bay, NU April 25-30,
Review of Meadowbank Water License Application: Public Hearing
Principal Investigator ESTCP Selection Meeting
Aggregate Advisory Board
Kitikmeot Inuit Association
Nunavut Water Board Public Hearing
Baker Lake, Nunavut Anne Wilson, Environment Canada January 14, 2015
GREAT BAY and NEW HAMPSHIRE WATER QUALITY STANDARDS
Environment and Climate Change Presentation to the Nunavut Water Board Regarding Doris North Project Type A Water Licence Amendment Application Nunavut.
Phase 2 Hope Bay Belt Project
Module 17: MIXING ZONES A limited area or volume of water where initial dilution of a discharge takes place and where numeric water quality criteria.
Project Schedule Final SWIM Plans GEBF Funding Request
Principal Investigator ESTCP Selection Meeting
Mining and Reclamation Advisory Board
MADRID – BOSTON PROPOSAL PHASE 2 OF THE HOPE BAY PROJECT
Kitikmeot Inuit Association
Phase 2 Hope Bay Belt Project
Meadowbank Water License Renewal
Drww general membership meeting
Des Plaines River Watershed Workgroup Midwest Biodiversity Institute
Introduction SCEA Organization Scoping Analysis Conclusions Mitigation.
303(d) List March 9, 2016 WQC Jeff Manning, DWR
WGC-2 DG Meeting Towards a Guidance on Groundwater Chemical Status and Threshold Values 14:00 – 16:00 21 April 2008 Ljubljana, Slovenia.
Principal Investigator ESTCP Selection Meeting
Mary River Project Phase 2 Proposal
Mary River Project Phase 2 Proposal Cumulative Effects
Mary River Project Phase 2 Proposal Atmospheric Environment
Mary River Project Phase 2 Proposal Freshwater Environment
Editing Board Meeting Status Expert Groups (Transmission, Axle)
Mary River Project Phase 2 Proposal Marine Environment
Principal Investigator ESTCP Selection Meeting
Notice of Public Hearing
WHALE TAIL PIT Expansion Project
Regional Environmental Health Specialist
Agnico Eagle Mines Ltd.’s Whale Tail Pit Expansion Project
WHALE TAIL EXPANSION PROJECT PROPOSAL ᐱᖁᖓᓂᐅᑉ ᐃᓱᐊᓂ ᐃᓚᒋᐊᖅᓯᔪᒪᓂᕐᒧᑦ ᑐᒃᓯᕋᐅᑎ
16MN056 - Public Hearing August 26 to 29, 2019 Baker Lake, Nunavut
Presentation to the Nunavut Impact Review Board ‘s Final Hearing for the Whale Tail Expansion Project August 27, 2019.
ᐱᓕᕆᐊᖑᔪᖅ ᓄᓇᕗᒻᒥ ᐊᕙᑎᓕᕆᔨᒃᑯᑦ ᑲᑎᒪᔨᖏᓐᓄᐊᖅᑕᐅᓂᐊᖅᖢᓂ
Prepared for the Nunavut Impact Review Board
Presentation transcript:

WHALE TAIL PIT Expansion Project Nunavut Impact Review Board TECHNICAL MEETING – JUNE 11-13, 2019 ᐊᒪᕈᖅ ᓄᓇᒥᑦ ᐃᓗᑦᑐᖅᓯᒪᔪᖅ ᐱᓕᕆᐊᖅ ᐊᖏᒡᓕᒋᐊᕐᓂᖓ ᐊᕙᑎᓕᕆᔨᒃᑯᑦ ᐱᓕᕆᐊᕐᒧᑦ ᑲᑎᒪᓂᖓᑦ ᔫᓂ 11-13, 2019 FRESHWATER Environment ᐃᒪᑦᑎᐊᕙᐅᑉ ᐊᕙᑎᖓ

Presentation summary ᑕᑯᕋᓐᓈᖅᑎᑦᑎᓂᕐᒧᑦ ᓇᐃᓈᖅᓯᒪᔪᖅ Summary of solved technical comments Summary of solved technical comments with commitments Summary of unresolved technical comments Questions and Discussion ᓇᐃᓈᖅᓯᒪᔪᖅ ᐋᖅᑭᒃᑕᐅᔪᓂᒃ ᐅᖃᐅᓯᐅᔪᓂᑦ ᐱᔪᓂᒃ ᓇᐃᓈᖅᓯᒪᔪᖅ ᐋᖅᑭᒃᑕᐅᔪᓂᒃ ᐅᖃᐅᓯᐅᔪᓂᑦ ᐱᔪᓂᒃ ᐱᓂᐊᕐᓂᖃᖅᖢᑎᒃ ᓇᐃᓈᖅᓯᒪᔪᖅ ᐋᖅᑭᒃᑕᐅᖏᑦᑐᓂᒃ ᐅᖃᐅᓯᐅᔪᓂᑦ ᐱᔪᓂᒃ ᐊᐱᖅᑯᑏᑦ ᐊᒻᒪᓗ ᐅᖃᓪᓗᕆᒃᓴᐅᑎᓃᑦ Agnico Eagle | WHALE TAIL PIT EXPANSION PROJECT NIRB TECHNICAL MEETING – JUNE 11-13 2019 ᐊᒡᑰᒃᑯᑦ | ᐊᒪᕈᖅ ᓄᓇᒥᑦ ᐃᓗᑦᑐᖅᓯᒪᔪᖅ ᐱᓕᕆᐊᖅ ᐊᕙᑎᓕᕆᔨᒃᑯᑦ ᐱᓕᕆᐊᕐᒧᑦ ᑲᑎᒪᓂᖓᑦ - ᔫᓂ 11-13, 2019

Information Request and Technical Comment summary ᑐᑭᓯᐅᒪᔾᔪᑎᓂᒃ ᑐᒃᓯᕋᐃᓂᖅ ᐊᒻᒪᓗ ᐅᖃᐅᓯᐅᔪᓂᒃ ᓇᐃᓈᖅᓯᒪᔪᖅ Agnico Eagle | WHALE TAIL PIT EXPANSION PROJECT NIRB TECHNICAL MEETING – JUNE 11-13 2019 ᐊᒡᑰᒃᑯᑦ | ᐊᒪᕈᖅ ᓄᓇᒥᑦ ᐃᓗᑦᑐᖅᓯᒪᔪᖅ ᐱᓕᕆᐊᖅ ᐊᕙᑎᓕᕆᔨᒃᑯᑦ ᐱᓕᕆᐊᕐᒧᑦ ᑲᑎᒪᓂᖓᑦ - ᔫᓂ 11-13, 2019

Summary of solved Technical Comments FRESHWATER Item Theme Technical comment # Technical comment subject 1. Freshwater CIRNAC-TRC#1 Complete comparative analysis of water quality modelling results for Approved and Expansion Projects 2. CIRNAC-TRC#2 Indicate spatial extent within all surface water receivers in which concentrations of potential contaminants may exceed the SSWQO or other applicable criteria Identify and characterize potential ecological impacts in areas where proposed water quality criteria may be exceeded. 3. CIRNAC-TRC#3 Verify conclusion that modelling results are highly conservative and that they likely over-predict any potential impacts. 4. CIRNAC-TRC#5 Justify all proposed changes to water intake/discharge infrastructure and operational practices. Identify and describe environmental impacts associated with any incremental chemical loadings caused by the Expansion Project. 5. CIRNAC-TRC#6 Quantitatively demonstrate that an appropriate level of conservatism has been used in the hydrogeological modelling 6. DFO 3.2 Provide additional information on 2018 field investigation Detail sampling methodology Provide rationale on the timing of sampling Provide rationale regarding how bathymetry influenced sampling methods 7. DFO-3.3 Provide consolidated table listing all waterbodies and watercourses impacted Quantify footprint increase Provide additional evidence and rationale to support the conclusion that Lake A50 contains no fish.  Provide additional field-based evidence to support the assertion that that waterbodies A-P10 and A-P5 are not considered as fish habitat Provide additional evidence that there are no connections among watercourses A50-A51, A51-A52, A52-A53, and A54-53 Provide a rationale why A-P38-A47 is not considered as habitat loss Agnico Eagle | WHALE TAIL PIT EXPANSION PROJECT NIRB TECHNICAL MEETING – JUNE 11-13 2019

ᓇᐃᓈᖅᓯᒪᔪᖅ ᐋᖅᑭᒃᑕᐅᔪᓂᒃ ᐅᖃᐅᓯᐅᔪᓂᑦ ᐱᔾᔪᒋᔭᐅᔪᖅ ᓱᓇᐅᓂᖓ ᐅᖃᐅᓯᐅᔪᖅ # ᐅᖃᐅᓯᐅᔪᖅ ᐱᔾᔪᑕᐅᔪᖅ 1. ᐃᒪᑦᑎᐊᕙᒃ CIRNAC-TRC#1 ᐱᐊᓂᑦᑎᐊᖅᓯᒪᔪᖅ ᖃᓄᐃᓐᓂᖅᓴᐅᓂᖓᓄᑦ ᖃᐅᔨᓴᐃᓂᖅ ᐃᒪᐅᑉ ᖃᓄᐃᓐᓂᖓᓄᑦ ᐊᑐᖅᑕᐅᔪᓕᕆᓂᕐᒧᑦ ᖃᓄᐃᖓᔪᑦ ᓈᒻᒪᒋᔭᐅᓂᐊᕐᓗᑎᒃ ᐊᒻᒪᓗ ᐊᖏᒡᓕᒋᐊᖅᓯᓂᕐᒧᑦ ᐱᓕᕆᐊᑦ 2. CIRNAC-TRC#2 ᓇᓗᓇᐃᕐᓗᓂ ᖃᓄᑎᒋᐅᓂᖓᓄᑦ ᑎᑭᐅᑎᓂᖅ ᑕᒪᐃᓐᓂᑦ ᐃᒪᐅᑉ ᖄᖏᓐᓂᑦ ᐱᖃᑦᑕᖅᑐᑦ ᑲᑎᑎᓯᒪᔪᑦ ᐱᐅᖏᑦᑑᔪᖕᓇᖅᑐᓂᒃ ᐅᖓᑕᐅᑎᑦᑎᔪᖕᓇᖅᑐᑦ SSWQO-ᒥᑦ ᐅᕝᕙᓘᓐᓃᑦ ᐊᓯᖏᓐᓂᒃ ᐊᑐᖅᑐᓂᒃ ᖃᐅᔨᓗᒋᑦ ᐊᒻᒪᓗ ᖃᓄᐃᖓᔪᓕᐅᕐᓗᒋᑦ ᐱᕈᖅᐸᓪᓕᐊᖃᑎᒌᒃᑐᓂᒃ ᐊᒃᑐᖅᓯᓂᐅᔪᖕᓇᖅᑐᑦ ᐃᒪᐅᑉ ᖃᓄᐃᓐᓂᖓᓄᑦ ᐅᖓᑕᐅᑦᑎᔪᖕᓇᖅᑐᓂᒃ 3. CIRNAC-TRC#3 ᓇᓗᓇᐃᕐᓗᓂ ᖃᐅᔨᔭᐅᔪᓂᒃ ᐊᑐᖅᑕᐅᔪᓕᕆᓂᕐᒥᑦ ᖃᓄᐃᖓᓂᐅᔪᑦ ᓈᒻᒪᒃᑑᖕᒪᑕ ᐊᒻᒪᓗ ᐅᖓᑎᓗᐊᖓᓄᑦ ᓇᓚᐅᑦᑖᖅᑕᐅᑉᓗᑎᒃ ᓱᓇᑐᐃᓐᓇᖅ ᐊᒃᑐᖅᓯᓂᐅᔪᖕᓇᖅᑐᑦ. 4. CIRNAC-TRC#5 ᐋᖅᑭᒡᓗᒋᑦ ᐊᓯᐊᙳᖅᑕᐅᔪᒪᔪᓗᒃᑖᑦ ᐃᒪᖅᑖᕐᕕᐅᖃᑦᑕᖅᑐᓂᒃ/ᑯᕕᑎᑦᑎᓂᕐᒧᑦ ᐱᖁᑎᓄᑦ ᐊᒻᒪᓗ ᐊᐅᓛᖅᑎᑦᑎᓂᕐᒧᑦ ᐊᑐᖅᑕᐅᖃᑦᑕᖅᑐᑦ. ᖃᐅᔨᓗᒋᑦ ᐊᒻᒪᓗ ᐅᖃᐅᓯᕆᓗᒋᑦ ᐊᕙᑎᒥᒃ ᐊᒃᑐᖅᓯᓂᐅᔪᑦ ᐱᔾᔪᑎᖃᖅᑐᑦ ᐃᓚᓯᕙᓪᓕᐊᓂᐅᔪᓂᒃ ᐱᐅᖏᑦᑐᓂᒃ ᐃᓗᓪᓕᖅᑐᖅᑐᓂᑦ ᐱᔪᓂᒃ ᐊᖏᒡᓕᒋᐊᖅᓯᓂᕐᒧᑦ ᐱᓕᕆᐊᕐᒥᑦ. 5. CIRNAC-TRC#6 ᐊᒥᓱᙳᖅᐸᓪᓕᐊᓂᒃᑯᑦ ᑕᑯᒃᓴᐅᑎᑦᑎᓗᓂ ᓈᒻᒪᒃᑐᖅ ᓇᓃᓐᓂᐅᔪᖅ ᖃᓄᐃᖏᓐᓂᕐᒥᑦ ᐊᑐᖅᑕᐅᓚᐅᕐᒪᑦ ᐃᒪᓕᕆᓂᕐᒧᑦ ᐊᑐᖅᑕᐅᔪᓕᕆᓂᕐᒥᑦ 6. DFO 3.2 ᑐᓂᓯᒃᑲᓐᓂᕐᓗᓂ ᑐᑭᓯᐅᒪᔾᔪᑎᓂᒃ 2018-ᒥᑦ ᐱᓕᕆᑉᓗᑎᒃ ᖃᐅᔨᓴᐃᓂᕐᒥᑦ ᓇᓗᓇᐃᔭᖅᓯᒪᔪᒃᑯᑦ ᐆᒃᑐᕋᐃᖃᑦᑕᕐᓂᕐᒧᑦ ᐊᑐᖅᑕᐅᔪᓕᕆᓂᖅ ᑐᓂᓯᓗᓂ ᖃᓄᐃᓕᐅᕈᑕᐅᔪᓂᒃ ᖃᖓᒃᑯᑦ ᐆᒃᑐᕋᐃᖃᑦᑕᕐᓂᐅᔪᓂᒃ ᑐᓂᓯᓗᓂ ᖃᓄᐃᓕᐅᕈᑕᐅᔪᓂᒃ ᐱᔾᔪᑎᖃᖅᑐᓂᒃ ᐆᒃᑐᕋᐃᓂᖅ ᐃᒪᐅᑉ ᐃᑎᓂᖓᓂᑦ ᐱᑎᑦᑎᔪᓂᒃ ᐆᒃᑐᕋᐃᓂᕐᒧᑦ ᐊᑐᖅᑕᐅᔪᓂᒃ 7. DFO-3.3 ᑐᓂᓯᓗᓂ ᑲᑎᑎᓯᒪᔪᓂᒃ ᑎᑎᖅᑲᒥᒃ ᑎᑎᕋᖅᓯᒪᔪᑦ ᐃᒪᖃᕐᓂᐅᔪᓗᒃᑖᑦ ᐊᒻᒪᓗ ᐃᒪᐃᑦ ᐊᑉᖁᑎᖏᑦ ᐊᒃᑐᖅᑕᐅᓯᒪᔪᑦ ᐊᒥᓱᓕᐅᕐᓗᒍ ᐃᓂᐅᔪᖅ ᐊᖏᒡᓕᒋᐊᖅᑐᒥᑦ ᑐᓂᓯᓗᓂ ᖃᐅᔨᒪᔾᔪᑎᒃᑲᓐᓂᕐᒥᒃ ᐊᒻᒪᓗ ᖃᓄᐃᓕᐅᕈᑕᐅᔪᒥᒃ ᐃᑲᔪᐃᔪᑦ ᖃᐅᔨᔭᐅᔪᓄᑦ ᑕᓯᖅ A50 ᐃᖃᓗᒃᑕᖃᙱᒻᒪᑦ. ᑐᓂᓯᓗᓂ ᓄᓇᒥᑦ ᖃᐅᔨᔭᐅᔪᓂᑦ ᐃᑲᔪᐃᔪᑦ ᓇᓗᓇᐃᖅᓯᓂᕐᒧᑦ ᐃᒪᖃᕐᓃᑦ A-P10 ᐊᒻᒪᓗ A-P5 ᐃᖃᓗᖕᓄᑦ ᐃᓂᖃᕐᕕᐅᓂᖏᓐᓄᑦ ᐃᓱᒪᒋᔭᐅᖏᒻᒪᑕ. ᑐᓂᓯᓗᓂ ᖃᐅᔨᒪᔾᔪᑎᒃᑲᓐᓂᕐᓂᒃ ᐊᒃᑐᐊᓂᖅᑕᖃᙱᒻᒪᑦ ᐃᒪᖃᕐᓂᐅᔪᓂᑦ A50-A51, A51-A52, A52-A53, ᐊᒻᒪᓗ A54-53 ᑐᓂᓯᓗᓂ ᖃᓄᐃᓕᐅᕈᑕᐅᔪᓂᒃ ᓲᖑᖕᒪᖔᑦ A-P38-A-47 ᐃᓱᒪᒋᔭᐅᙱᒻᒪᑕ ᐃᓂᖃᕐᕕᐅᔪᒥᒃ ᐊᓯᐊᔨᓂᕐᒧᑦ ᐊᒡᑰᒃᑯᑦ | ᐊᒪᕈᖅ ᓄᓇᒥᑦ ᐃᓗᑦᑐᖅᓯᒪᔪᖅ ᐱᓕᕆᐊᖅ ᐊᕙᑎᓕᕆᔨᒃᑯᑦ ᐱᓕᕆᐊᕐᒧᑦ ᑲᑎᒪᓂᖓᑦ - ᔫᓂ 11-13, 2019

Summary of solved Technical Comments FRESHWATER Item Theme Technical comment # Technical comment subject 8 Freshwater DFO-3.4 3.4.1 Water management scenarios exceeding 156masl 3.4.2 Alternative to avoid exceeding 156masl 3.4.3 Clarify D1 and D5 lake assessment 3.4.4 Clarify use of slightly with regards to use of D1 and D5 3.4.5 Quantify extend of flooding  3.4.6 Quantify change in water level 3.4.7 Quantify change in water level and surface area 9. ECCC-TC18 Clarify how water quality prediction represent base case Discuss difference between Approved and Expansion project 10. KivIA-Aquatic-TC#7 Provide updated water quality model and additional documentation regarding potential cryo-concentration 11. KivIA-Aquatic-TC#8 Provide updated water quality model and separate dissolved oxygen memorandum. 12. KivIA-Aquatic-TC#10 Clarify the mobility of VC fish species and explain how mobility will affect their responses to habitat loss and fragmentation 13. KivIA-Aquatic-TC#11 Provide rationale to support the conclusion that VC fish species will not be negatively affected by the long duration of elevated nutrient levels in area lakes. 14. NRCan-1 No further technical comments  15. TC-01 Consider assessing the project’s impacts to navigation following dewatering of Lake A3. 16. NIRB-TC-12 Insufficient aquatic baseline data for Lake D1 and Lake D5 17. NIRB-TC-13 Provide figure that delineates the different watersheds Agnico Eagle | WHALE TAIL PIT EXPANSION PROJECT NIRB TECHNICAL MEETING – JUNE 11-13 2019

ᓇᐃᓈᖅᓯᒪᔪᖅ ᐋᖅᑭᒃᑕᐅᔪᓂᒃ ᐅᖃᐅᓯᐅᔪᓂᑦ ᐃᒪᑦᑎᐊᕙᒃ ᐱᔾᔪᒋᔭᐅᔪᖅ ᓱᓇᐅᓂᖓ ᐅᖃᐅᓯᐅᔪᖅ # ᐅᖃᐅᓯᐅᔪᖅ ᐱᔾᔪᑕᐅᔪᖅ 8 ᐃᒪᑦᑎᐊᕙᒃ DFO-3.4 3.4.1 ᐃᒪᕐᒥᒃ ᐊᐅᓚᑦᑎᓂᕐᒧᑦ ᐊᑐᖅᑕᐅᔪᑦ ᐅᖓᑕᐅᑦᑎᔪᓂᒃ 156masl-ᒥᑦ 3.4.2 ᐊᓯᐊᒍᖔᖅ ᐅᖓᑕᐅᑦᑎᑦᑕᐃᓕᓂᖅ 156masl-ᒥᑦ 3.4.3 ᓇᓗᓇᐃᕐᓗᒍ D1 ᐊᒻᒪᓗ D5 ᑕᓯᕐᓂᑦ ᖃᐅᔨᓴᐃᓂᖅ 3.4.4 ᓇᓗᓇᐃᕐᓗᒍ ᐊᑐᖅᑕᐅᕌᕐᔪᖕᓂᕆᔭᖓ ᐊᑐᖅᑕᐅᓂᖏᑦᑕ D1 ᐊᒻᒪᓗ D5 3.4.5 ᐊᒥᓱᐃᓕᕐᓗᒍ ᑎᑭᐅᑎᓂᐅᔪᖅ ᐃᒻᒥᖅᑐᐃᓂᖅ 3.4.6 ᐊᒥᓱᐃᓕᕐᓗᒍ ᐊᓯᐊᙳᕐᓂᖓ ᐃᒪᐅᑉ ᓇᓃᓐᓂᕆᔭᖓ 3.4.7 ᐊᒥᓱᐃᓕᕐᓗᒍ ᐊᓯᐊᙳᕐᓂᖓ ᐃᒪᐅᑉ ᓇᓃᓐᓂᕆᔭᖓ ᐊᒻᒪᓗ ᖄᖓ 9. ECCC-TC18 ᓇᓗᓇᐃᕐᓗᒍ ᖃᓄᖅ ᖃᓄᐃᓐᓂᕆᔭᖓᓄᑦ ᓇᓚᐅᑦᑖᖅᑕᐅᔪᑦ ᑭᒡᓕᐅᒋᔭᐅᔫᖕᒪᖔᑦ ᐅᖃᐅᓯᕆᓗᒋᑦ ᐊᔾᔨᒌᙱᓐᓂᕆᔭᖏᑦ ᓈᒻᒪᒋᔭᐅᔪᖅ ᐊᒻᒪᓗ ᐊᖏᒡᓕᒋᐊᖅᓯᓂᕐᒧᑦ ᐱᓕᕆᐊᖅ 10. KivIA-Aquatic-TC#7 ᑐᓂᓯᓗᑎᒃ ᐅᑉᓗᒥᒨᓕᖅᑐᖅᓯᒪᔪᒥᒃ ᐃᒪᐅᑉ ᖃᓄᐃᓐᓂᖓᓄᑦ ᐊᑐᖅᑕᐅᔪᖅ ᐊᒻᒪᓗ ᑎᑎᖅᑲᐅᑎᒃᑲᓐᓃᑦ cryo-ᒥᒃ ᑲᑎᑎᓯᒪᔫᔪᖕᓇᖅᑐᖅ 11. KivIA-Aquatic-TC#8 ᐅᑉᓗᒥᒨᓕᖅᓯᒪᓗᓂ ᐃᒪᐅᑉ ᖃᓄᐃᓐᓂᖓᓄᑦ ᐊᑐᖅᑕᐅᔪᖅ ᐊᒻᒪᓗ ᐊᑉᑎᕐᓗᒋᑦ ᓄᖑᑎᖅᓯᒪᔪᑦ ᐋᒃᓯᔾᔨᓐᒥᒃ ᐃᖅᑲᐅᒪᔾᔪᑎ. 12. KivIA-Aquatic-TC#10 ᓇᓗᓇᐃᕐᓗᓂ ᐊᐅᓚᓐᓂᖏᑦ VC ᐃᖃᓗᐃᑦ ᐊᔾᔨᒌᙱᑦᑐᑦ ᐊᒻᒪᓗ ᐅᖃᐅᓯᕆᓗᒋᑦᐊᐅᓚᓐᓂᖏᑦ ᐊᒃᑐᖅᓯᓂᐊᕐᒪᑕ ᐅᐸᓗᐊᔾᔪᑎᖏᓐᓂᒃ ᐃᓂᖏᓐᓄᑦ ᐊᓯᐅᔨᓂᕐᒥᒃ ᐊᒻᒪᓗ ᐊᓯᐊᙳᖅᑎᕆᓂᕐᒥᒃ 13. KivIA-Aquatic-TC#11 ᑐᓂᓯᓗᓂ ᖃᓄᐃᓕᐅᕈᑎᓂᒃ ᐃᑲᔪᐃᔪᓂᒃ ᖃᐅᔨᔭᐅᔪᓂᒃ VC ᐃᖃᓗᐃᑦ ᐱᐅᖏᑦᑐᒥᒃ ᐊᒃᑐᖅᑕᐅᓂᖃᔾᔮᙱᒻᒪᑕ ᐊᑯᓂᐅᔪᒥᒃ ᖁᑦᑎᒃᓯᓯᒪᔪᓂᒃ ᓂᕿᑦᑎᐊᕙᐃᑦ ᓇᓃᓐᓂᕆᔭᖏᓐᓂᒃ ᑕᓯᕐᓂᑦ. 14. NRCan-1 ᐊᓯᖏᓐᓂᒃ ᐱᓕᕆᐊᑉ ᒥᒃᓵᓄᑦ ᐅᖃᐅᓯᖅᑕᖃᙱᑦᑐᖅ  15. TC-01 ᐃᓱᒪᒋᓗᒋᑦ ᖃᐅᔨᓴᐃᓂᖃᕐᓂᐊᕐᓗᓂ ᐱᓕᕆᐊᑉ ᐊᒃᑐᖅᓯᓂᖏᓐᓂᒃ ᐊᐅᓛᕐᓂᕐᓄᑦ ᐃᒪᐃᔭᐃᓂᖃᖅᑳᖅᑎᓪᓗᒋᑦ ᑕᓯᖅ A3-ᒥᑦ. 16. NIRB-TC-12 ᓈᒻᒫᐅᑎᙱᑦᑐᑦ ᐃᒪᕐᒧᑦ ᑭᒡᓕᒋᔭᐅᔪᓂᒃ ᓈᓴᐅᑎᓂᒃ/ᑎᑎᖅᑲᓂᒃ ᑕᓯᖅ D1-ᒧᑦ ᐊᒻᒪᓗ D5-ᒧᑦ 17. NIRB-TC-13 ᑐᓂᓯᓗᓂ ᓈᓴᐅᑎᓂᒃ ᑭᒡᓕᓕᐅᖅᑐᒥᒃ ᐊᔾᔨᒌᙱᑦᑐᓄᑦ ᐃᒪᖃᕐᓂᐅᔪᓂᒃ ᐊᒡᑰᒃᑯᑦ | ᐊᒪᕈᖅ ᓄᓇᒥᑦ ᐃᓗᑦᑐᖅᓯᒪᔪᖅ ᐱᓕᕆᐊᖅ ᐊᕙᑎᓕᕆᔨᒃᑯᑦ ᐱᓕᕆᐊᕐᒧᑦ ᑲᑎᒪᓂᖓᑦ - ᔫᓂ 11-13, 2019

Summary of Technical Comments solved with commitments - FRESHWATER Item  Theme Technical comment # Technical comment subject Agnico Eagle Comments /Rationale/ Response 1.         Freshwater DFO-3.1 Impacts of haul road expansion to fish passage The calculations and related information (e.g. minimum/ maximum flow, fish swimming speed) used to inform the sizing of the proposed culvert upgrades to ensure fish passage will be provide to DFO prior to the technical meeting. Timeline: Prior to Technical Meeting 2.         ECCC-TC15 Schedule 2 Listing and Waterbody Use by Fish Agnico Eagle will work with DFO to reach agreement on the status of the waterbodies in question. Agnico Eagle has scheduled a meeting with Nancy Seymours group (ECCC)​ Timeline: June 27, 2019 3.         ECCC-TC16 Alternative Effluent Discharge Locations Agnico Eagle currently assessing options to improve treatment efficiency of the O-WTP for Arsenic and Phosphorous. Timeline: During regulatory Phase 4.         ECCC-TC17 Water Quality Predictions (TSS), COPS. Update the FEIS with water quality predictions (TSS) and COPS not required only Update Management Plans per the Whale Tail Pit Water Licence Amendment regulatory process. 5.         KivIA-Aquatic-TC#1 Mercury concentrations in fish Agnico Eagle will complete an update on the mercury predictions based on the additional duration of the flood associated with the Whale Tail Expansion project Timeline: To be determined Agnico Eagle | WHALE TAIL PIT EXPANSION PROJECT NIRB TECHNICAL MEETING – JUNE 11-13 2019

ᓇᐃᓈᖅᓯᒪᔪᖅ ᐋᖅᑭᒃᑕᐅᔪᓂᒃ ᐅᖃᐅᓯᐅᔪᓂᑦ ᐱᔪᓂᒃ ᐱᓂᐊᕐᓂᖃᖅᖢᑎᒃ - ᐃᒪᑦᑎᐊᕙᒃ ᐱᔾᔪᒋᔭᐅᔪᖅ ᓱᓇᐅᓂᖓ ᐅᖃᐅᓯᐅᔪᖅ # ᐅᖃᐅᓯᐅᔪᖅ ᐱᔾᔪᑕᐅᔪᖅ ᐊᒡᓃᑯᒃᑯᑦ ᐅᖃᐅᓯᖏᑦ / ᖃᓄᐃᓕᐅᕐᓂᐅᔪᑦ / ᑭᐅᔾᔪᑕᐅᔪᑦ  1.         ᐃᒪᑦᑎᐊᕙᒃ DFO-3.1 ᐊᒃᑐᖅᓯᓃᑦ ᐃᖃᓗᐃᑦ ᐊᑉᖁᑎᖏᓐᓄᑦ ᐅᓯᑲᑦᑕᖕᓂᕐᒧᑦ ᐊᑉᖁᑎᒥᒃ ᐊᖏᒡᓕᒋᐊᖅᓯᓂᕐᒥᑦ ᐱᔪᓂᒃ ᓈᓴᐅᓯᕆᓃᑦ ᑕᒪᒃᑯᓄᙵᓗ ᑐᑭᓯᐅᒪᔾᔪᑏᑦ (ᓲᕐᓗ ᒥᑭᓛᒃᑯᑦ/ᐊᖏᓛᒃᑯᑦ ᑯᕕᔪᑦ, ᐃᖃᓗᐃᑦ ᓇᓗᖕᓂᖏᑦᑕ ᓇᑭᕐᓂᖏᑦ) ᐊᑐᖅᑕᐅᔪᑦ ᖃᐅᔨᓂᐊᖅᖢᓂ ᐊᖏᓂᓕᕆᓂᕐᒥᒃ ᓱᑉᓗᓕᖕᓂᒃ ᓄᑖᙳᖅᑎᕆᓂᕐᒧᑦ ᐃᖃᓗᐃᑦ ᐃᑳᕈᖕᓇᕐᓂᐊᕐᓗᑎᒃ ᑐᓂᓗᒋᑦ ᐃᖃᓗᓕᕆᔨᒃᑯᓐᓄᑦ ᑲᑎᒪᓂᖃᕐᓂᐊᓵᖅᑎᓪᓗᒋᑦ. ᖃᖓᒃᑯᑦ: ᑲᑎᒪᓂᐅᓵᖅᑎᓪᓗᒋᑦ 2.         ECCC-TC15 ᑎᑎᖅᑲᖅ 2-ᒥᑦ ᑎᑎᕋᖅᓯᒪᔪᑦ ᐊᒻᒪᓗ ᐃᒪᐃᑦ ᐊᑐᖅᑕᐅᖃᑦᑕᖅᑐᑦ ᐃᖃᓗᖕᓄᑦ ᐊᒡᓃᑯᒃᑯᑦ ᐱᓕᕆᖃᑎᖃᕐᓂᐊᖅᑐᑦ ᐃᖃᓗᓕᕆᔨᒃᑯᓐᓂᑦ ᐊᖏᖃᑎᒌᖕᓂᐊᕐᓗᑎᒃ ᖃᓄᐃᖓᓂᖓᓄᑦ ᐃᒪᐃᑦ ᐅᖃᐅᓯᐅᔪᑦ. ᐊᒡᓃᑯᒃᑯᑦ ᐋᖅᑭᒃᓯᓚᐅᖅᑐᑦ ᑲᑎᒪᖃᑎᖃᕐᓂᐊᕐᓗᑎᒃ ᓈᓐᓯ ᓯᒧᐊᔅ ᑲᑎᕐᒪᔪᓂᑦ (ECCC). ᖃᖓᒃᑯᑦ: ᔫᓂ 27, 2019 3.         ECCC-TC16 ᐊᓯᐊᒍᖔᖅ ᑯᕕᕝᕕᐅᔪᓄᑦ ᐃᓂᐅᔪᑦ ᐊᒡᓃᑯᒃᑯᑦ ᒫᓐᓇᐅᔪᖅ ᖃᐅᔨᓴᐃᔪᑦ ᐱᐅᓯᒋᐊᖅᓯᓂᐅᔪᖕᓇᖅᑐᓂᒃ ᐱᓕᕆᐊᖃᕐᓂᕐᒧᑦ O-WTP ᐋᓯᓂᒃᑲᖅᑐᓂᒃ ᐊᒻᒪᓗ Phosphorous-ᒥᒃ. ᖃᖓᒃᑯᑦ: ᒪᓕᒐᓕᕆᓂᖃᖅᑎᓪᓗᒋᑦ 4.         ECCC-TC17 ᐃᒪᐅᑉ ᖃᓄᐃᓐᓂᖓᓄᑦ ᓇᓚᐅᑦᑖᖅᑕᐅᔪᑦ (TSS), COPS ᐅᑉᓗᒥᒨᓕᖅᑐᕐᓗᒍ FEIS ᐃᒪᐅᑉ ᖃᓄᐃᓐᓂᖓᓄᑦ ᓇᓚᐅᑦᑖᖅᑕᐅᔪᓂᒃ (TSS) ᐊᒻᒪᓗ COPS ᐱᔭᐅᔭᕆᐊᖃᙱᑦᑐᑦ ᑭᓯᐊᓂ ᐅᑉᓗᒥᒨᓕᖅᑐᕐᓗᒍ ᐊᐅᓚᑦᑎᓂᕐᒧᑦ ᐸᕐᓇᐅᑏᑦ ᐊᒪᕈᕐᒥᑦ ᓄᓇᒥᑦ ᐃᓗᑦᑐᖅᓯᒪᔪᕐᒧᑦ ᐃᒪᕐᒥᒃ ᓚᐃᓴᓐᓯᒥᒃ ᐋᖅᑭᒋᐊᖅᓯᓂᖅ ᒪᓕᒐᓕᕆᓂᕐᒥᑦ. 5.         KivIA-Aquatic-TC#1 ᒨᑯᕆ ᑲᑎᑎᓯᒪᔪᑦ ᐃᖃᓗᖕᓂᑦ ᐊᒡᓃᑯᒃᑯᑦ ᐱᐊᓂᖕᓂᐊᖅᑕᖓᑦ ᐅᑉᓗᒥᒨᓕᖅᑐᐃᓂᖅ ᒨᑯᕆᓄᑦ ᓇᓚᐅᑦᑖᖅᑕᐅᔪᑦ ᐊᑐᕐᓗᑎᒃ ᐃᓚᓯᓂᐅᔪᒥᒃ ᖃᓄᑎᒋᐅᔪᒥᒃ ᐃᒻᒥᖅᑐᐃᓂᕐᒧᑦ ᐱᔾᔪᑎᖃᖅᑐᖅ ᐊᒪᕈᕐᒥᑦ ᐊᖏᒡᓕᒋᐊᖅᓯᓂᕐᒧᑦ ᐱᓕᕆᐊᕐᒥᑦ ᖃᖓᒃᑯᑦ: ᖃᐅᔨᔭᐅᓂᐊᖅᑐᖅ ᐊᒡᑰᒃᑯᑦ | ᐊᒪᕈᖅ ᓄᓇᒥᑦ ᐃᓗᑦᑐᖅᓯᒪᔪᖅ ᐱᓕᕆᐊᖅ ᐊᕙᑎᓕᕆᔨᒃᑯᑦ ᐱᓕᕆᐊᕐᒧᑦ ᑲᑎᒪᓂᖓᑦ - ᔫᓂ 11-13, 2019

ᐊᒡᓃᑯᒃᑯᑦ ᐃᓱᒪᔪᑦ ᐋᖅᑭᒃᑕᐅᖏᑦᑐᓂᒃ ᐱᑕᖃᙱᒻᒪᑦ ᐱᓕᕆᐊᕐᒧᑦ ᐅᖃᐅᓯᐅᔪᓂᒃ ᐃᒪᑦᑎᐊᕙᖕᒥᑦ ᐱᔪᓄᑦ. Summary of UNRESOLVED Technical Comments ᓇᐃᓈᖅᓯᒪᔪᖅ ᐋᖅᑭᒃᑕᐅᖏᑦᑐᓂᒃ ᐅᖃᐅᓯᐅᔪᓂᑦ ᐱᔪᓂᒃ Agnico Eagle considers that there are no unresolved technical comments for the Freshwater component. ᐊᒡᓃᑯᒃᑯᑦ ᐃᓱᒪᔪᑦ ᐋᖅᑭᒃᑕᐅᖏᑦᑐᓂᒃ ᐱᑕᖃᙱᒻᒪᑦ ᐱᓕᕆᐊᕐᒧᑦ ᐅᖃᐅᓯᐅᔪᓂᒃ ᐃᒪᑦᑎᐊᕙᖕᒥᑦ ᐱᔪᓄᑦ. Agnico Eagle | WHALE TAIL PIT EXPANSION PROJECT NIRB TECHNICAL MEETING – JUNE 11-13 2019 ᐊᒡᑰᒃᑯᑦ | ᐊᒪᕈᖅ ᓄᓇᒥᑦ ᐃᓗᑦᑐᖅᓯᒪᔪᖅ ᐱᓕᕆᐊᖅ ᐊᕙᑎᓕᕆᔨᒃᑯᑦ ᐱᓕᕆᐊᕐᒧᑦ ᑲᑎᒪᓂᖓᑦ - ᔫᓂ 11-13, 2019

Questions and Discussion ᐊᐱᖅᑯᑏᑦ ᐊᒻᒪᓗ ᐅᖃᓪᓗᕆᒃᓴᐅᑎᓃᑦ MATNA - Thank you - ᖁᔭᓐᓇᒦᒃ