Vision of the Energy & Environment Deptt. Cont…. Being Achieved through: Installation of 20% Renewable power for Campus by installation & commissioning of 60 kW Power generation through Solar-Wind Hybrid System at Hilltop of RGPV Bio-diesel production @100 LPD rising to 600 LPD CO2 Capture and Sequestration Unit Installation of a Multidisciplinary Hydro Power Unit for teaching & Research
Important Research Equipments Biomass Gasifier 1.6 kW Solar Wind Hybrid System Solar Fountain Biodiesel Reactor -100 LPD & 10 LPD Satellite based Automatic Weather Station (ISRO) Weather Monitoring Station Combustion Gas Analyzer UV Double beam Spectrophotometer Mechanical Wind Pump Solar Biodiesel Hybrid Car CO2 Sequestration Unit (under testing) Vertical Axis Wind Turbine
Automatic Weather Monitoring Station Sr. No Stn. ID Station Name Date Time (GMT) PERIPHERAL STATUS AIR TEMPERATURE (C) HUMIDITY (%) ATM. PRESSURE (hPa) SOLAR FLUX (hr:mm) RAIN FALL (mm) WIND SPD. (m/s) WIND DIRECTION (Deg) BATTERY VOLTAGE (V) 1 AF8E97AC [ISRO 466 27-Dec-08 0:00:00 12.7 62 954.5 7.58 193.5 1.8 303 2 ISRO 1:00:00 12.1 57 954.7 297 12.6
LABS OF THE DEPARTMENT Energy Park Environment & Energy Lab CFD Lab Hydro Power Lab (Proposed)
60 kW Solar Wind Hybrid System at Hill Top of RGPV
A Transition to Green Power Increasing GHG emission and consequent climate change has been attributed primarily to Energy generation process. This has prompted this department to transform itself into Green Energy Technology center The entire Power Sector in India has witnessed a Transition from Conventional Thermal to Green Power
Green Technology Centre to shape the new horizons in State-of-the-Art Clean Coal Technologies Affordable Renewable Energy Technologies Research Initiatives in Zero Emission Technologies Climate Change and CO2 Capture Tech. Bio Fuels & Bio Diesel Bio Science in Waste Management
Some Glimpses of the existing Project Facilities
AICTE-RPS PROJECT: SOLAR WIND & BIOMASS HYBRID
100 Ltrs. Bio Diesel Reactor commissioned at RGTU
Recent Happenings 10 kWe Bio mass Gasifier installed at RGTU
CO2 Sequestration Pilot Plant installed under the DST Project
Fruits on Jatropha
DEVELOPMENT OF THE ENERGY PARK (Dedicated to Energy related experimentation) Phase I (a): (2004-05: completed ) - Solar PV Street lighting system - Solar PV Home light system - Solar Lanterns Phase I (b) (2005-06: completed ) - Mechanical Wind Pumping system - 900 W Solar PV water Fountain & pumping system - Solar Flat plate collector test facility - Solar Educational Kit - High Volume Sampler - Wind Anemometer , Weather Monitoring Station
DEVELOPMENT OF THE ENERGY PARK … Phase II (2006-07:Completed ) - Solar - Wind hybrid system: 1.6 kW - 10 kW Biomass Gasifier Phase III (2008-10: Under Testing ) - CO2 Sequestration Unit Phase IV (2009-12) - Solar Wind Hybrid System(60kW)at Hilltop - Multidisciplinary Hydro Power Center - Energy audit equipments and a Gas Chromatograph (under procurement)
Let us pledge together to create a new dawn of green energy era. THANK YOU Let us pledge together to create a new dawn of green energy era.