WG A Ecological Status Intercalibration: Where do we go from here ?

Slides:



Advertisements
Similar presentations
Intercalibration of assessment systems for the WFD: Aims, achievements and further challenges Presented by Sandra Poikane Joint Research Centre Institute.
Advertisements

ECOSTAT meeting – Ispra (IT), July of 14 CBriv GIG Macrophyte Intercalibration.
WG 2A ECOSTAT 7-8 July 2004 Task on Harmonisation of Freshwater Biological Methods Status Report AC Cardoso and A Solimini Harmonisation Task Team: JRC.
Lake Intercalibration Presented by Sandra Poikane Joint Research Centre Institute for Environment and Sustainability.
WG 2A ECOSTAT Meeting 4-5 March 2004 Meeting of the WFD CIS Working Group 2A ECOSTAT summary Presented by Anna-Stiina Heiskanen Joint Research Centre The.
ECOSTAT 8-9 October 2007 River GIGs: Future intercalibration needs/plans Presented by Wouter van de Bund Joint Research Centre Institute for Environment.
River Intercalibration Phase 2: Milestone 4 reports Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
GIG plan updates GIG leads were requested to update their work plans
Working Group 2A ECOSTAT Finalisation of the intercalibration register Presented by Wouter van de Bund Joint Research Centre Institute for Environment.
Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability Inland.
Task on Harmonisation of Freshwater Biological Methods
Intercalibration results 2006/2007
Intercalibration Results 2006
Common Implementation Strategy for the Water Framework Directive Working Group A ECOSTAT Ecological Status 7th Meeting Stresa, Lago Maggiore, Italy
IC network selection process
Intercalibration progress: Central - Baltic GIG Rivers
WG 2A Ecological Status First results of the metadata collection for the draft intercalibration register: RIVERS.
Results of the metadata analysis Meeting of the Working Group 2A on Ecological Status (ECOSTAT) March 4-5 , 2004, Ispra, Italy Peeter Nõges Anna-Stiina.
CW-TW Intercalibration work progress
ALPINE RIVER GIG Update: Macroinvertebrates Phytobenthos.
Working Group A ECOSTAT October 2006 Summary/Conclusions
CEN TC 230 WG2 “Biological and Ecological Methods” Implications for Annex V ECOSTAT Oct 2012 Paul Logan.
Working Group 2A ECOSTAT Objectives & Agenda of the meeting March 2005
Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability Inland.
Draft Commission Decision on Intercalibration
Task 1 - Intercalibration WG 2A ECOSTAT - Intercalibration
ECOSTAT, Stresa, Italy, 3-4 July 2006
River GIGs: Checking and completing the Decision Annex Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
Working Group 2A ECOSTAT Summary progress report River GIGs Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability Inland.
Working Group 2A ECOSTAT Intercalibration process - state of play Wouter van de Bund & Anna-Stiina Heiskanen Joint Research Centre Institute for Environment.
Working Group A Ecological Status - ECOSTAT WFD CIS Strategic Coordination Group meeting, October 2005 Progress in the intercalibration exercise.
WG ECOSTAT: Good Ecological Potential (GEP)
Intercalibration Timetable
Working Group A ECOSTAT Summary Milestone Reports: River GIGs Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
Ecostat meeting - Ispra March 2006
Common Implementation Strategy for the
Working Group A ECOSTAT Update on intercalibration Prepared by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
Working Group A Ecological Status - ECOSTAT State of play in the intercalibration exercise Water Directors Meeting, November 2005.
Progress Report Working Group A Ecological Status Intercalibration (1) & Harmonisation (3) Activities Presented by Anna-Stiina Heiskanen EC Joint Research.
Intercalibration Decision and Technical Report
WFD – CIS Working group A ECOSTAT
Activities of WG A Ecological Status
WG A Ecological Status Progress report April-October 2009
Working Group A ECOSTAT progress report on Intercalibration Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
ECOSTAT, Stresa, Italy, October 2005
IC remaining gaps: overview and way forward
EU Water Framework Directive
Water Directors meeting Spa, 2-3 December 2010
River groups with extension
WG A ECOSTAT Intercalibration guidance : Annexes III, V, VI
WFD CIS 4th Intercalibration Workshop
Guidelines to translate the intercalibration results into the national classification systems and to derive reference conditions Presented by Wouter.
Lake Intercalibration – IC Decision Annexes + what to do in future
Working Group A Ecological Status - ECOSTAT WFD CIS Strategic Coordination Group meeting, 22 Febraury 2006 Progress Report.
Lake Intercalibration
WG A Ecological Status Progress report April-October 2010
Working Group D Reporting, Brussels 31 March – 1 April 2008
Common Implementation Strategy for the
First issue: same classification system - different boundaries (1)
WFD CIS WG ECOSTAT meeting on 8-9 October 2007 Objectives What do we need to achieve during this meeting?
WG A ECOSTAT Draft Mandate
Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability Inland.
NEA GIG COORDINATION.
Intercalibration round 2: finalisation and open technical issues – RIVERS ECOSTAT October 2012.
EU Water Framework Directive
Fish intercalibration – rivers Progress and expected outcome
WG A Ecological Status Progress report October 2010 – May 2011
Baltic Sea GIG Status Ecostat 23 April 2013
Why are we reviewing reference conditions in intercalibration?
Presentation transcript:

WG A Ecological Status Intercalibration: Where do we go from here ? SCG meeting 22 March 2012

Intercalibration : Different situations IC completed – all countries, Annex 1 IC completed – not all countries, Annex 1 IC not completed IC completed, Annex 2 SCG meeting 22 March 2013

Different situations in GIGs Intercalibration : Different situations in GIGs IC completed – all countries, Annex 1 IC completed – not all countries, Annex 1 IC not completed IC completed, Annex 2 SCG meeting 22 March 2013

Situation 1 – What to do ? IC completed – all countries, Annex 1 E.g., Lake Alpine, Central-Baltic, Northern Macrophytes To translate the IC results to the national classification systems “Guidelines to translate the intercalibration results into the national classification systems and to derive reference conditions” SCG meeting 22 March 2013

Situation 2 – What to do ? IC completed – not all countries, Annex 1 E.g., Lake Alpine Phytoplankton – FR missing MS responsibility to intercalibrate the method according to the IC results How – will be discussed at April ECOSTAT The main role – MS which wants to intercalibrate SCG meeting 22 March 2013

Situation 3 – What to do ? IC not completed E.g., Lake Central Baltic Fish - no results MS responsibility to reactivate the GIG work To submit the methods and carry out the IC Results by 2016 SCG meeting 22 March 2013

Situation 4 – What to do ? IC completed, Annex 2 IC partially achieved E.g., Baltic Sea Phytoplankton GIG: BC1 and BC9 IC partially achieved MS responsibility to reactivate the GIG work To complete all the necessary steps Results by 2016 SCG meeting 22 March 2013